ML17306A918
| ML17306A918 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/19/1992 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-02248-JML-T, 102-2248-JML-T, NUDOCS 9208250231 | |
| Download: ML17306A918 (6) | |
Text
acear.za<rza nyrarsm'row ozMor "axirox svsrzM REGULAl
. Y INFORMATION DISTR IBUTIO~YSTEM (RXDS3 DOCKET 8 05000528 05000529 05000530 ACCESSION NBR: 9208250231 DOC. DATE: 92/08/}9 NOTARIZED:
NO FACXL:STN-50-528 Palo Verde Nuclear Station>
Unit 1> Arizona Publi STN-50-529 Palo Verde Nuclear Station>
Unit 2> Arizona Publi STN-50-530 Palo Verde Nuclear Station>
Unit 3. Arizona Publi AUTH. NAME AUTHOR AFFXLXATXON LEVINE>J. M.
Arizona Public Service Co.
(Pormerl g Arizona Nuclear Power RECXP. NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Advises that training on Rev 0. 02 of. EOPs completed on 920824 5 EOPs became el%ective on 920817> as 8 ol loeup to NRC initial license exams administered on 920LE>01-12. Prospective licensees received 10 h of simulator training.
DISTRIBUTIQN CODE:
AOOSD CQPIES RECEIVED: LTR g ENCL
~
SIZE:
TITLE: OR/Licensing Submittal:
Suppl 1 to NUREG-0737(Generic Ltr 82-333 NOTES'TANDARDIZED PLANT Standard'i zed plant.
Standard i z ed p lant.
REC IP XENT ID CODE/NAME PD5 LA TRAMMELL>C COPIES LTTR ENCL RECXPIENT ID CODE/NAME PD5 PD THOMPSON> C COPIES LTTR ENCL 0500052 05000529m 05000536k D
INTERNAL: NRR/DLPG/LHFB11 OI EXTERNAL:
NRC PDR OC/LFMB RES/DS IR/EIB NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED'TTR 12 ENCL
l g
>s e
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 102-02248-JML/TRB/PJC August 19, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Reference:
Letter No. 102-02155-JML/TRB/PJC, dated May 27, 1992, from J. M. Levine, Vice President, Nuclear Production, Arizona Public Service Company, to Document Control Desk, U. S. Nuclear Regulatory Commission
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. 50-528/529/530 Emergency Operating Procedures-Training and Implementation File: 92-070-026 92-056-026 As discussed in the referenced letter, NRC initial license examinations were administered at PVNGS from June 1 through 12, 1992.
The licenses of the sixteen candidates who successfully completed the examinations have been held in abeyance pending completion of the Emergency Operating Procedures (EOPs) upgrade project.
During a telephone conversation on July 10, 1992, among representatives of NRC Region V and the PVNGS Nuclear Training Department, Arizona Public Service Company (APS) was asked to notifythe NRC when training on Revision 0.02 ofthe EOPs had been completed and the new procedures had been made effective.
Following the initial examinations, the prospective licensees were enrolled with the presently licensed operators in requalification training cycle NLR-13 to receive instruction on the revised EOPs.
The prospective licensees received classroom instruction and ten hours of simulator training. The classroom instruction specifically addressed the changes from EOP Revision 0.01 to Revision 0.02.
Each of the prospective licensees participated in five simulator scenarios involving different EOPs.
The prospective reactor operator (RO) licensees performed the duties of either the primary operator, the secondary operator, or the third RO during the scenarios.
The prospective senior reactor operator licensees performed the duties of the Control Room Supervisor for all five scenarios.
Training Department instructors monitored and assessed'rew performance.
The 920825023i 9208i9 PDR
- DOCK 05000528 V
P I
~ski)
le/"
U. S..Nuclear Regulatory Commission
-ATTN: Document Control Desk Emergency Operating Procedures
- Training and Implementation Page 2 instructors determined that the prospective licensees are proficient in the use of the new EOPs.
The EOP training was completed on August 14, 1992, with the exception of one prospective licensee who completed the final elements of the course on August 17, 1992.
PVNGS Quality Assurance (QA) monitored representative samples of the classroom training and the simulator scenarios conducted during the requalification training cycle.
The QA Monitoring Reports indicated satisfactory results and support the conclusions of the crew assessments.
The new EOPs became effective on August 17, 1992, and are fully implemented.
APS requests that the licenses of the sixteen prospective licensees be issued.
Should you have any questions concerning EOP training or implementation, please call Thomas R. Bradish of my staff at (602) 393-5421.
Sincerely, JML/TRB/PJC/pjc cc: