August 10, 1992 Docket Nos.
50-528, 50-529 and 50-530 Hr. William F.
Conway Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999
- Phoenix, Arizona 85072-3999
Dear Hr. Conway:
SUBJECT:
RISK-BASED INSPECTION GUIDES The Nuclear Regulatory Commission is developing risk-based inspection guides (RIGs) to be published as a
NUREG report under our Technical Assistance Program with the national laboratories.
The RIGs provide guidance for NRC inspections, To obtain information for one specific guide, we would like to send a
representative of our contractor, Pacific Northwest Laboratories, and a member of the Risk Applications Branch to the Palo Verde Nuclear Generating Station on September 15, 1992, to accompany the NRC resident inspectors in a walkdown of the auxiliary feedwater system.
While on site, the contractor will be available to receive any comments you may have or answer any questions regarding the RIG.
Your participation is strictly voluntary, however.
I am enclosing a draft copy of the RIG for the auxiliary feedwater system.
Please let us know by telephone if you would like to participate in this effort.
Your cooperation is appreciated.
Sincerely, onsin8t sigpep by Charles H. Trammell, Senior Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Draft RIG cc w/enclosure:
See next page DISTRIBUTION:
QDocket F'il eg BBoger Tguay KThompson
P315 PDV Plant File Z, Chuns-OFC NAME DATE PDV/LA DFoster
/92 p v mmell:lh 092 PDV/D
,TQuay
)6 92 OFFICIAL RECORD COPY 9208140178 9208i0 PDR ADOCK 05000M8 P
PDR DOCUMENT NAME:
PVRIG.LTR ImC RL>~ gg~~~gp'~i4
'I lt 'll I
Ill g s
~
ik k
fk pN, A ]g Q (
\\
pe,S REgy C
P0 Op I
0O IIA
+~
~O
+a*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 10, 1992 Docket Nos.
50-528, 50-529 and 50-530 Hr. William F.
Conway Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999
- Phoenix, Arizona 85072-3999
Dear Hr. Conway:
SUBJECT:
RISK-BASED INSPECTION GUIDES The Nuclear Regulatory Commission is developing risk-based inspection guides (RIGs) to be published as a
NUREG report under our Technical Assistance Program with the national laboratories.
The RIGs provide guidance for NRC inspections.
To obtain information for one specific guide, we would like to send a
representative of our contractor, Pacific Northwest Laboratories, and a member of the Risk Applications Branch to the Palo Verde Nuclear Generating Station on September 15, 1992, to accompany the NRC resident inspectors in a walkdown of the auxiliary feedwater system.
While on site, the contractor will be available to receive any comments you may have or answer any questions regarding the RIG.
Your participation is strictly voluntary, however.
I am enclosing a draft copy of the RIG for the auxiliary feedwater system.
Please let us know by telephone if you would like to participate in this effort.
Your cooperation is appreciated.
Sincerely, f~l~cB~
Charles H. Trammell, Senior Project Hanager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Draft RIG cc w/enclosure:
See next page
t V
1 l
Mr. William F.
Conway Arizona Public Service Company Palo Verde CC:
Nancy C. Loftin, Esq.
Corporate Secretary
& Counsel Arizona Public Service Company P. 0.
Box 53999, Mail, Station 9068
- Phoenix, Arizona 85072-3999 James A. Beoletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission HC-03 Box 293-NR Buckeye, Arizona 85326 Regional Administrator, Region V
U.
S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway',
Suite 330 Rockville, Maryland 20852 Mr. William A. Wright, Acting Director Arizona Radiation Regulatory Agency 4814 South 40 Street
- Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors ill South Third Avenue
- Phoenix, Arizona 85003 Jack R.
- Newman, Esq.
Newman 5 Holtzinger, P.C.
1615 L Street, N.W., Suite 1000 Washington, D.C.
20036 Curtis Hoskins Executive Vice President and Chief Operating Officer, Palo Verde Services 2025 N. 3rd Street, Suite 220
- Phoenix, Arizona 85004 Roy P.
Lessey, Jr.,
Esq.
Bradley W. Jones, Esq.
Arkin, Gump, Strauss, Hauer and Feld El Paso Electric Company 1333 New Hampshire Ave., Suite 400 Washington, D.C.
20036
t\\
1 f