ML17306A853
| ML17306A853 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/27/1992 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17306A854 | List: |
| References | |
| 102-02216-WFC-J, 102-2216-WFC-J, NUDOCS 9208030191 | |
| Download: ML17306A853 (4) | |
Text
ACCELERATED DISTRIBUTION DEMONST$&TION SYSTEM REGULA.
Y INFORMATION DISTRIBUT'I SYSTEM (RIDS)
ACCESSION NBR:9208030191 DOC.DATE: 92//07/27 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear'tation, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Wyle Laboratories Seismic Qualification Test Rept 42679-1, "Seismic Simulation Test Program on Six Naturally-Aged Type 2GN Exide Batteries."
DISTRIBUTION CODE:
ROOID COPIES RECEIVED:LTR Q ENCL g SIZE: /+ I TITLE: OR Submittal:
General Distribution R
D NOTES:STANDARDIZED PLANT
'tandardized plant.
Standardized plant.
/
05000528 05000529 A
05000530 D
RECIPIENT ID CODE/NAME PD5 LA TRAMMELLPC INTERNAL: ACRS NRR/DOEA/OTSBll NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 6
6 1
1 1
1 1....,,,1, 1
0 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD THOMPSON,C NRR/DET/ESGB NRR/DST/SELB 7E NRR/DST/SRXB 8E OC/LFMB G=FI=
Ol NSIC COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
0 1
1 1
1 D
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WAS'ONTACTTHE DOCUMENT CONTROL DESK.
ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 22
F
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX, ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 102-02216-WFC/JRP July 27, 1992 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Cracked Exide Battery Seismic Test Results File: 92-056-026 The enclosed Wyle Laboratories Seismic Qualification Test Report is being provided as requested by Mr. C. M. Trammell of your staff.
Six Exide Type 2GN batteries (three 2GN-1 3 and three 2GN-23) with varying degrees of cracking were removed from PVNGS and were subjected to seismic testing. The testing demonstrated that the batteries'ere of sufficient structural integrity to withstand the prescribed seismic test levels.
Should you have further questions, please call Thomas R. Bradish at (602) 393-5421.
WFC/JRP/prnm Enclosure Sincerely, Pp cc:
J. B. Martin D. H. Coe C. M. Trammell (all w/enclosure)
=goo~8 9208030i9i 920727 PDR ADOCK 05000528 P
1 la 4
i