Notification of Significant Licensee Meeting W/Util on 920709 to Conduct Enforcement Conference Re Unit 3 Reactor Trip Breaker Failures & Loss of Annunciator Event & Unit 1 Check Valve Installed Backwards
ML17306A821
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/30/1992
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 9207090301
Download: ML17306A821 (4)


Text

gA~ REOy, (4

Cqpo Op OO IlA o

+)t*w+

UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIALANE WALNUTCREEK, CAUFORNIA94596-5368 gag g 0199R NOTICE OF SIGNIFICANT HEETING Name of Licensee:

Arizona Public Service Company (APS)

Name of Facility: Palo Verde Nuclear Generating Station Docket Numbers:

50-528, 50-529, and 50-530 Date and Time of Heeting:

Location of Meeting:

Purpose of Heeting:

NRC Attendees:

July 9,

1992, 1:00 p.m.

USNRC Region V Office 1450 Haria Lane, Walnut Creek, California Enforcement conference to discuss:

1) Unit 3 reactor. trip breaker failures,
2) Unit 3 loss of annunciator
event, and 3) Unit 1 check valve installed backwards.

B. Faulkenberry, Deputy Regional Administrator R..Zimmerman, Director, Division of Reactor Safety and Projects K. Perkins, Deputy Director, Division of Reactor Safety and Projects S. Richards, Chief, Reactor Projects Branch L. Hiller, Chief, Reactor Safety Branch C. Thompson, Project Hanager H. Wong, Chief, Reactor ProjectsSection II

. D. Kirsch, Technical Assistant D. Coe, Senior Resident Inspector APS Attendees:

W. Conway, Executive Vice President, Nuclear E.

Simpson, Vice President, Nuclear Engineering and Construction D. Hauldin, Director, Site Haintenance and Hodifications G. Overbeck, Director, Site Technical Support R. Stevens, Director, Nuclear Licensing and Compliance NOTE: Attendance at this meeting by NRC individuals other than those listed above should be made known by July 7, 1992, via a telephone call to" H.

Wong, 510-975-0296.

Approved By:

R.

P.

i

rman, irector Divisi f Reactor Safety an Projects R

ggoCK 9~0630 9207090301 9

CK 05000528 PDR

I 'I

Distributi on J. Sniezek, DEDO T. Hurley, NRR J. Partlow, NRR W. Russell, NRR B. Boger, NRR M. Virgilio, NRR T. quay, NRR C. Trammell, NRR J.

Lieberman, OE S.

Shankman, OEDO B. Faulkenberry, RV G. Cook, RV H. Blume, RV, R. Huey, RV D. Kunihiro, RV NRC Attendees Listed CC Hr. 0. Hark DeHichele, APS Hr. James H. Levine, APS Mr. R. Stevens, APS Hr. S. Guthrie, APS Hr.

E.

C. Simpson, APS Hr. Robert W. Page, APS Hr. Thomas R. Bradish, APS Hr. Al Gutterman, Esq.,

Newman

& Holtzinger P.

C.

Hr. Curtis L. Hoskins, El Paso Electric Company Hr. James A. Beoletto, Esq., Assistant Council, Southern California Edison Company Hr. Steve H. Olea, Chief Engineer, Arizona Corporation Commission Mr. Charles B. Brinkman, Combustion Engineering, Inc.

Hr. Roy P.

Lessy, Jr.,

Esq., Akin, Gump,. Strauss, Hauer and Feld Hr. Bradley W. Jones, Esq., Akin, Gump, Strauss, Hauer and Feld Hs.

Nancy C. Loftin Esq.,

Corporate Secretary

& Counsel, APS Hr. Jack R.

Newman, Esq.,

Newman

& Holtzinger, P.C.

Mr. William A. Wright, Acting Director, Arizona Radiation Regulatory Agency (ARRA)

Chairman, Haricopa County Board of Supervisors

BOlson 6 />q/o ~

HWong SRichards

/ /

RZimmerman g /o>/

/ /-

S CO ES NO S

CO ES NO YES C

Q S

NO YES Q

S YES NO CS YES NO NO