Hay 4, 1992 Docket No. 50-529 Hr. William F.
Conway Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999
- Phoenix, Arizona 85072-3999
Dear Hr. Conway:
J.
SUBJECT:
SCHEDULAR EXTENSION FOR IMPLEMENTATION OF GENERIC LETTER 89-10 FOR PALO VERDE NUCLEAR GENERATING STATION (PVNGS)
UNIT 2 By letter dated January 10,
- 1992, you informed us of a change to your schedular commitments to Generic Letter (GL) 89-10 in Unit 2.
Specifically, you stated that you intend to complete the Unit 2 implementation of GL 89-10 by,the end of the refueling outage scheduled to begin in late 1994.
By conference call on April 22,
- 1992, NRC staff discussed with your staff the basis for this extension of your schedule.
During this call, NRC staff referred the licensee to paragraph l of GL 89-10 which states that revised schedules may be implemented without NRC approval, but that justification should be maintained on site for any future NRC inspector reviews.
This letter acknowledges the receipt of your stated intention to complete implementation of GL 89-10 in Unit 2 by the end of the refueling outage scheduled to begin in late 1994.
Sincerely, Originai Signed By:
Catherine M. Thompson, Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION:
/.. Docket File BBoger DFoster ACRS (10),
P315 TScarborough, 16H3 NRC 8 Local PDRs HVirgilio CThompson PDV Plant File DCorporandy, RV PDV Reading File TQuay
- OGC, 15B18 RZimmerman, RV OFC NAME DATE
,'PDV/LA
'DFoster
/g 92
,'PDV/PH
)EMEB R
'CTh on
,'No erg lg /pg9~
14 /P)/9~
,'PDV/D
,'TQuay l 5/4/92 OFFICIAL RECORD COPY PDR ADOCK 05000 P
DOCUMENT NAME:
PV2LTR.EXT KC ALE CPNR Il&V 2 Fol,
0
~
e I
~ I
'4 le lt
~~g RE0Ij~
+
o P
Cy O
C O
,rg $
0 Cy Cy 4
Q t7 +**++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 May 4, 1992 Docket No. 50-529 Hr. William F.
Conway Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999
- Phoenix, Arizona 85072-3999
Dear Hr. Conway:
SUBJECT:
SCHEDULAR EXTENSION FOR IHPLEHENTATION OF GENERIC LETTER 89-10 FOR PALO VERDE NUCLEAR GENERATING STATION (PVNGS) UNIT 2 By letter dated January 10,
- 1992, you informed us of a change to your schedular commitments to Generic Letter (GL) 89-10 in Unit 2.
Specifically, you stated that you intend to complete the Unit 2 implementation of GL 89-10 by the end of the refueling outage scheduled to begin in late 1994.
By conference call on April 22,
- 1992, NRC staff discussed with your staff the basis for this extension of your schedule.
During this call, NRC staff referred the licensee to paragraph 1 of GL 89-10 which states that revised schedules may be implemented without NRC approval, but that justification should be maintained on site for any future NRC inspector reviews.
This letter acknowledges the receipt of your stated intention to complete implementation of GL 89-10 in Unit 2 by the end of the refueling outage scheduled to begin in late 1994.
Sincerely, cc:
See next page rV1.
I Catherine H. Thompson, Project Hanager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
l V
~
C
~
~
Mr. William F.
Conway Arizona Public Service Company Palo Verde CC:
Nancy C. Loftin, Esq.
Corporate Secretary 5 Counsel Arizona Public Service Company P. 0.
Box 53999, Hail Station 9068
- Phoenix, Arizona 85072-3999 James A. Beoletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission HC-03 Box 293-NR Buckeye, Arizona 85326 Regional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Hr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Hr. William A. Wright, Acting Director Arizona Radiation Regulatory Agency 4814 South 40 Street
- Phoenix, Arizona 85040 Chairman Haricopa County Board of Supervisors ill South Third Avenue
- Phoenix, Arizona 85003 Jack R.
- Newman, Esq.
Newman 8 Holtzinger, P.C.
1615 L Street, N.W., Suite 1000 Washington, D.C.
20036 Curtis Hoskins Executive Vice President and Chief Operating Officer Palo Verde Services 2025 N. 3rd Street, Suite 220 Phoenix, Arizona 85004 Roy P.