ML17306A670
| ML17306A670 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/10/1992 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 102-02134-JML-T, 102-2134-JML-T, NUDOCS 9204210372 | |
| Download: ML17306A670 (5) | |
Text
ACCELERATED D+RIBUTION DEMONS+4.TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:9204210372 DOC.DATE': 92/04/10 NOTARIZED:
NO DOCKET ACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B.
Region 5 (Post 820201)
SUBJECT:
Provides follow-up info re tubes plugged during repairs to Train A essential cooling water sys HX,per 920315 request for temporary waiver of compliance.
DISTRIBUTION CODE'EOID COPIES RECEIVED:LTR ENCL ~
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of,Vio ation Response D
NOTES:Standardized plant.
05000529
/
RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M INTERNAL: ACRS AEOD/DEIIB DEDRO t
NRR/DLPQ/LHFBPT NRR/DOEA/OEAB NRR/DST/DIR SE2 NUDOCS-ABSTRACT OGC/HDS1 RGN5 FILE 01 EXTERNAL: EG &G/BRYCE,J. H.
NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME TRAMMELL,C AEOD AEOD/DSP/TPAB NRR MORISSEAUiD NRR/DLPQ/LPEB10 NRR/DREP/PEPB9H NRR/PMAS/ILRB12 OE DIR REG~PIFIL'E:
02 NRC PDR COPIES LTTR ENCL D
D
~<$ 2:3 (3/
D NOTE TO ALL"RIDS" RECIPIENTS:
.D D
PLEASE HFLP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOiii Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
OTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL
C
JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION RECEIVED NRC REGION V Arizona Public'Service Company pyg App I (
AH g: ~8 PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX. ARIZONA85072-2034 102-02134-JML/TRB/DAJ Apri 1 10, 1992 IVlr. J. B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368
Dear Mr. Martin:
Reference:
Request for Temporary Waiver of Compliance (TWOC),
Revision 2
submitted March 15, 1992, to Mr. John B. Martin, Regional Administrator, Region V, NRC, from Mr. W. F. Conway, Executive Vice President, Nuclear, Arizona Public Service (Letter No. 161-04665-WFC/NLT)
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Docket No.
STN 50-529 (License No. NPF-51)
Essential Cooling Water Heat Exchanger Plugged Tubes File: 92-019-026 This letter is being submitted to provide follow-up information regarding the number of tubes plugged during repairs to the Train A Essential Cooling Water System (ECWS) heat exchanger for which the referenced TWOC was submitted.
ln the referenced iWOC, it was indicated that as of 9:00 a.m. MST on March 15, 1992, work remaining to be completed included plugging seventy-one tubes which had indication of potential defects when eddy current inspected.
This status was based upon best available information at that time.
Subsequent final review of the work performed and compilation of the data shows that eighty-eight tubes were plugged.
This is less than the maximum number of tubes (128) which can be plugged per the manufacturer's recommendations.
Of the eighty-eight tubes plugged, fourteen were plugged due to visual confirmation of leakage, six were plugged due to potential damage incurred when one tube was removed for root cause analysis, and sixty-eight tubes were plugged due to indications of potential defects.
Eddy current inspection was performed on 101 tubes along their full length and on all tubes up to their first support plate.
The confirmed leaks and tube defects were found in the tube area up to the first support plate.
During eddy current inspection, sixty-eight tubes were found to have potential defects and were plugged at management's direction prior to engineering final analysis of the eddy current results.
This decision was made to minimize the out-of-service time for the heat exchanger while remaining within the design of the heat exchanger as stated in the manufacturer's technical manual.
Letter to J. B. Martin
'Page 2 102-02134JMUTRB/DAJ April 10,1992 Subsequent engineering analysis of the eddy current results determined that thirty-eight of the sixty-eight tubes would have required plugging due to defects.
If you have any questions, please contact Mr. D. Alan Johnson at (602) 393-5203.
Very truly yours JML/TRB/DAJ/dmn cc:
C. M. Trammell D. H. Coe A. H. Gutterman W. A. Wright