Informs That Licensee Emergency Response Data Sys Implementation Plan Submitted 911028,provides Acceptable Basis for Implementation at Facility.Advises That Testing Phase of Implementation Involves Testing W/Nrc Contractor
ML17306A619
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/19/1992
From: Trammell C
Office of Nuclear Reactor Regulation
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 9204010123
Download: ML17306A619 (6)


Text

March 19, 1992 0

Docket Nos. 50-528/529/530 Hr. William F.

Conway Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999

Phoenix, AZ 85072-3999

Dear Hr. Conway:

The U.S. Nuclear Regulatory Commission (NRC) has reviewed the Emergency

Response

Data System (ERDS) implementation plan which you submitted in a letter dated October 28, 1991.

Based upon this review, the NRC has found that your implementation plan provides the basis for an acceptable implementation of EROS at your facility.

The staff has identified one minor question based upon the preliminary point ID list (Table 2).

Under the heading of Radioactivity Control, the radiation release information is presented in units of uci/cc.

The purpose of these ERDS data points would be to determine actual release rates in units of activity per unit time (i.e., uci/sec).

To that end, it would be appropriate to send flow rate data on these release paths if available on computer.

If not, the average flow rates for these paths would be appropriate entries in the unique system description for these data points in the Data Point Libraries which are scheduled to be delivered in March of 1992.

Be advised that the testing phase of EROS implementation involves all licensees testing with the NRC contractor, Halliburton NUS Environmental Corporation.

Since the contractor does not have unlimited resources for testing multiple ERDS links simultaneously, close coordination with the Halliburton NUS personnel in scheduling your EROS testing will be a key element in the successful completion of ERDS implementation.

The project manager at Halliburton NUS is Hr. Tony LaRosa, and he may be reached at (208) 524-9227.

If you have any questions or problems in implementing the ERDS program, please contact Mr. John Jolicoeur, the NRC ERDS project manager, at (301) 492-4155 or your NRR Project Manager.

9204010123 920319 PDR ADDCK 05000525 F

PDR cc:

-See next page Sincerely, Original signed by Charles M. Trammell, III, Project Manager Project Directorate V

Division of Reactor Projects III, IV, V

and Special Projects Office of Nuclear Reactor Regulation IRB:fggAEOD EWWQQ

~/g/92 DISTRIBUTION:

ELJordan, AEOD
DFRoss, AEOD JRJolicoeur, AEOD
RFPriebe, AEOD
HTaylor, OEDO DCS Local PDR PD V R/F IR:AEOO TRBARIBl:AEOO JJolicoeur:pw RFf4%be

</ti /92 z /y/92 D:D:AEOD RLSpessard

~of/92 C. Thongs'~

DOA R/F

Tguay, NRR IRB R/F SShankman, OEDO NRC PDR
JReese, RV CMTrammell, NRR

~ ()

<'V

I

V J

~

~p.S Rfgy c<

~o Op nO IIA 0 p**4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 19, 1992 Docket Nos. 50-528/529/530 Hr. Milliam F.

Conway Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999

Phoenix, AZ 85072-3999

Dear Hr. Conway:

The U.S. Nuclear Regulatory Commission (NRC) has reviewed the Emergency

Response

Data System (ERDS) implementation plan which you submitted in a letter dated October 28, 1991.

Based upon this review, the NRC has found that your implementation plan provides the basis for an acceptable implementation of ERDS at your facility.

The staff has identified one minor question based upon the preliminary point ID list (Table 2}.

Under the heading of Radioactivity Control, the radiation release information is presented in units of uci/cc.

The purpose of these EROS data points would be to determine actual release rates in units of activity per unit time (i.e., uci/sec).

To that end, it would be appropriate to send flow rate data on these release paths if available on computer.

If not, the average flow rates for these paths would be appropriate entries in the unique system description for these data points in the Data Point Libraries which are scheduled to be delivered in Harch 'of 1992.

Be advised that the testing phase of ERDS implementation involves all licensees testing with the NRC contractor, Halliburton NUS Environmental Corporation.

Since the contractor does not have unlimited resources for testing multiple ERDS links simultaneously, close coordination with the Halliburton NUS personnel in scheduling your ERDS testing will be a key element in the successful completion of ERDS implementation.

The project manager at Hallibur ton NUS is Hr. Tony LaRosa, and he may be reached at (208) 524-9227.

If you have any questions or problems in implementing the ERDS program, please contact Hr. John Jolicoeur, the NRC ERDS project manager, at (301) 492-4155 or your NRR Project Manager.

Sincerely, Charles H. Trammell, III, Project Hanager Project Directorate V

Division of Reactor Projects III, IV, V

and Special Projects Office of Nuclear Reactor Regulation cc:

See next page

I I

>I b

~

l J

I

Mr. William F.

Conway Ar1zona Public Service Company Palo Verde CC:

Nancy C. Loftin, Esq.

Corporate Secretary

& Counsel Ar1zona Publ1c Service Company P. 0.

Box 53999, Mail Stat1on 9068 Phoenix, Arizona 85072-3999 James A. Beoletto, Esq.

Southern California Edison Company P. 0.

Box 800

Rosemead, California 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission HC-03 Box 293-NR
Buckeye, Arizona 85326 Reg1onal Adm1nistrator, Reg1on V

U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Jack R.

Newman, Esq.

Newman

& Holtz1nger, P.C.

1615 L Street, N.W., Suite 1000 Washington, D.C.

20036 Curtis Hosk1ns Executive Vice Pres1dent and Chief Operating Officer Palo Verde Services 2025 N. 3rd Street, Su1te 220

Phoenix, Arizona 85004 Roy P.

Lessey, Jr.,

Esq.

Bradley W. Jones, Esq.

Arkin, Gump, Strauss, Hauer and Feld El Paso Electr1c Company 1333 New Hampshire Ave., Suite 400 Washington, D.C.

20036 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. William A. Wright, Act1ng Director Arizona Radiation Regulatory Agency 4814 South 40 Street

Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors 111 South Third Avenue
Phoenix, Ar1zona 85003

~

I g

4 I

I t

I I

(

f l

I I

t l

I

(