ML17306A615

From kanterella
Jump to navigation Jump to search
Forwards Recorded Calculation SA-ALL-NCR-92-003-00, Subgroup 4,5 & 22 CEA Slip Analysis for Reactor Power Cutback Timer. Calculation Withheld (Ref 10CFR2.790)
ML17306A615
Person / Time
Site: Palo Verde  
Issue date: 03/24/1992
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17306A616 List:
References
161-04696-WFC-N, 161-4696-WFC-N, NUDOCS 9203310295
Download: ML17306A615 (6)


Text

D

/

05000528 05000529 A

05000530 NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

jELERATED DISTRIBUTION DEMONSTPWTION SYSTEM

~I REGULATO~ INFORMATION DISTRIBUTION~STEM (RIDS)

ESSION NBR:9203310295 DOC.DATE: 92/03/24 NOTARIZED: YES DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAYFW.F.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Recorded Calculation SA-ALL-NCR-92-003-00, "Subgroup 4,5

& 22 CEA Slip Analysis for Reactor Power Cutback Timer." Calculation withheld (ref 10CFR2.790).

DISTRIBUTION CODE:

AP01D COPIES RECEIVED:LTR g ENCL Q SIZE:

TITLE: Proprietary Review Distribution Operating Reactor RECIPIENT ID CODE/NAME PD5 LA TRAMMELLFC COPIES LTTR ENCL 1

1 3

3 RECIPIENT ID CODE/NAME PD5 PD THOMPSONFM COPIES LTTR ENCL 1,

1 3

3 D

INTERNAL: ACRS OGC/HDS1 EXTERNAL: NRC PDR NOTES:

6 6

1 0

1 0~

1 1

AEOD/ OA G FIL 01 1

1 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAS'ONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIPIDFOR DOCUMENTS YOU DON'T NEED!

A D

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL 17

L T

Arizona Public Service Company P.O. BOX 53999

~

PHOENIX. ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-04696-WFC/NLT March 24, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Transmittal of Subgroup 4, 5, and 22 CEA Slip Analysis for Reactor Power Cutback Timer File: 92-056-026 92-001-703 Pursuant to the request of Mr. D. H. Coe, NRC Region V Senior Resident Inspector, Arizona Public Service Company (APS) hereby provides the "Subgroup 4, 5, and 22 CEA Slip Analysis for Reactor Power Cutback Timer" as Enclosure 1 to this letter.

This analysis provides the justification for reintroducing the Core Protection Calculator/Control Element Assembly (CEA) Calculator cutback timer forthe PVNGS units based on previously calculated reload analysis.

The calculation looks at possible two consecutive four-finger slips in the "legal" banks (currently banks four and five) and determines rod worths and distortion factors.

Based on the limiting distortion factor, a safety analysis evaluation concludes that the four-finger CEA drop event bounds the two consecutive slips and hence is less limiting.

The APS recorded calculation is considered by Combustion Engineering, Inc. (CE) to be proprietary information.

Please find as Enclosure 2, the CE affidavit pursuant to 10 CFR 2.790.

VZO33>Oa9S 92Oia4 PDR ADOCK 05000MB P

PDR

L E

161-04696-WFC/NLT March 24, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Transmittal of CEA Slip Analysis for Reactor Power Cutback Timer Page 2 lf you have any questions, please contact Michael E. Powell at'(602) 340-4981.

Sincerely, WFC/MEP/NLT

Enclosures:

1.

APS Recorded Calculation SA-ALL-NCR-92-003-00, Analysis for Reactor Power Cutback Timer 2.

CE's Affidavitfor the APS Recorded Calculation SA-ALL-NCR-92-003-00, Analysis for Reactor Power Cutback Timer cc:

J. B. Martin D. H. Coe A. C. Gehr A. H. Gutterman

~

E lI