Forwards Insp Repts 50-528/92-04,50-529/92-04 & 50-530/92-04 on 920113-17 & 0204-05.No Violations or Deviations Noted. NRC Concerned W/Lack of Sys Engineering Involvement in Processing of Limited Design Change Packages
ML17306A499
Person / Time
Site: Palo Verde  
Issue date: 02/21/1992
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17306A500 List:
References
NUDOCS 9203060037
Download: ML17306A499 (3)


See also: IR 05000528/1992004

Text

+~*y4

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CALIFORNIA94596-5368

Fgg

g, g 1992

Docket Nos.

50-528,

50-529,

50-530

Arizona Public Service

Company

P.O.

Box 53999, Station

9012

Phoenix,

Arizona

85072-3999

Attention:

Mr.

W.

F.

Conway

Executive Vice President,

Nuclear

Subject:

NRC INSPECTION OF

PALO VERDE UNITS 1, 2,

AND 3

This letter refers to the inspection

conducted

by Messrs.

W. J.

Wagner and

H.

A. Freeman,

of this office, on-site January

13-17,

1992,

and in-office

February 4-5, 1992, of activities authorized

by

NRC License

Numbers

NPF-41,

NPF-51,

NPF-74,

and to discussions

of our findings held with your staff at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with-

personnel,

and observations

by the inspectors.

As a result of our inspection, it was identified that there is

a lack

of system engineering

involvement in the processing

of limited design

change

packages

and material

non-conformance

reports dispositioned

as "Other,"

"Rework," or "Scrap."

Also, failure data trending information is not being

provided in a timely- manner to system engineers

on problems concerning their

systems.

Similar problems regarding the lack of system engineering

involvement in

problems with their systems

were identified in previous

NRC inspections.

We consider the system engineers

to have

a significant role in the assurance

of quality and safety of the plants.

Therefore,

we will continue to evaluate

your resolution of this issue through future inspections.

No violations or deviations

were identified within the scope of this

inspection.

P2OSO&OO>

o ooO528

7 q20221

PDR

ADOCK o

PDFI

8

I

DEol

bcc w/enclosure:

Docket File

J. Hartin

B. Faulkenberry

R.

Zimmerman

Resident

Inspector

Project Inspector