Forwards Enforcement Conference & Mgt Meeting Repts 50-528/91-51,50-529/91-51 & 50-530/91-51 on 911218.Purpose of Enforcement Conference to Discuss Circumstances & Apparent Violations Re Core Alterations W/O Supervision
ML17306A418
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/17/1992
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17306A419 List:
References
EA-91-182, NUDOCS 9202040119
Download: ML17306A418 (7)


See also: IR 05000528/1991051

Text

~gR RK~,fp-

~4

0

C

0

C

I

o

I

J

a

  • f

jy

v,

()+

/f <<<<**4

UNITED STATES

NUCLEAR REGULATORY COMNIISSION

REGION V

ll60 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIA$4596-5368

Docket Nos. 50-528,

50-529,

50-530

EA No.91-182

Arizona Public Service

Company

Post Office Box 53999,

Sta.

9012

. Phoenix,

AZ

85072-3999

Attn:

Hr. Milliam F.

Conway

Executive Vice President,

Nuclear

Gentlemen:

This refers to the enforcement

conference

and management

meeting held with

Arizona Public Service

Company at the Region

V office on December

18,

1991.

Subjects

discussed

during the meeting are described

in the enclosed

Neeting

Report.

The purpose of the enforcement

conference

was to discuss

the circumstances

and

apparent violations associated

with (1) conducting core alterations without

the supervision of a licensed

senior reactpr operator

and without'establishing

direct communications

between the control

room and the refueling station

and

(2) failing to adhere

to procedural

requirements for maintaini'ng required

refueling pool level, obtaining boron samples

and responding to a control

room

alarm indication.

Also addressed

were the findings of the Augmented

Inspection

Team as detai'led in report

No. 50-530/91-47,

regarding

the mobile

crane event of November

15,

1991.

These events

are indicative of a lack of formality in implementing'our

management

program for the oversight

and control of activities. It appears

in

these

instances

that your practices

did not ensure that the designated

personnel

could adequately

maintain control of the associated

work.

During the management

meeting that followed the enforcement

conference,

you

discussed

the status of your steam generator

loose pa'rt monitoring and fire

protection

improvement programs.

Summary of these discussions

are also

included in'the enclosed report.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosed

report will be placed in the

NRC Public Document

Room.

9202040119

920117

PDR

ADDCK 05000528

G

PDR

r'

Should you have

any questions

concerning this report,

we will be pleased

to

discus"

them with you.

Sincerely,

R.

P.

Zimmerman

Division of Reactor Safety

and Projects

Enclosures:

1.

Hanagement

Heeting Report 50-528,

529,

530/91-51

2.

Licensee

Presentation

Slides

cc w/ enclosures:

Hr. 0. Hark DeNichele,

APS

Hr. James

H. Levine,

APS

Hr. Jack

N. Bailey,

APS

Hr. E.

C. Simpson,

APS

~ Hr. S. Guthrie,

APS

Hr'. Thomas

R. Bradish,

APS

Hr. Robert

W.

Page,

APS

Hs.

Nancy C. Loftin, Esq.

(Snell

& Wilmer)

Hr. Al Gutterman,

Newman

& Moltzinger P.C.

Hr. James

A. Boeletto,

Esq., As'sist'ant

Counsel,

SCE Company

Hr. Charles

B. Brinkman, Combustion Engineering,

Inc.

'r. William A. Wright, Acting Director, Arizona Radiation

Reg.

Agency

Chairman,

Haricopa County Board of Supervisors

Hr. Steve

M; Olea, Chief Engineer,- Arizona Corporation

Commission

Ignacio

R. Troncoso,

El

Paso Electric Company

Roy P..Lessy,

Jr. Esq.,'.Akin,

Gump, Strauss,

Hauer

and Feld

Bradley

W. Jones,

Esq., Akin, Gump, Strauss,

Hauer

and Feld

Hr. Jack'.

Newman,

Esq.

(Newman

& Holtzinger)

i

'I

REGION V

RZimmerman

I/

/92

I 4

PKoltay

I/A /92

, gA-

/92

DKirsh

I ig

92

YES

NO

YES

NO

F

NO

YE

< NO

YES

0

YES

NO

YES

NO