Text
l t
NRC MONTHLY OPERATING REPORT REVISED DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A. Chavet OPERATING STATUS 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 1 Reporting Period:
October 1991 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A 12 13 14 15 17 18 19 20 21 22 23
- "-
- ,:',,Bourse~'9;xi":Repbx ti,ng',,:::Pex"o'ups""'Reac'toi::-%as"':'Cr'&ti c'a'lk'"':"::':-::"""::l:::::::'"':':'-::::-"':':-:i"'":
',.:.ROactox:;:::R@serYe::::,8llU'tdown';:.::.:8Ãirs:.:.':.,";:.
".'.:.Hours".;::Cenecatioi,:,:;".wa'8';:::Gn',>>:,:Lin
- .,Crojj,Th'erm'a',1'.:',:,'Rne
"::,6'ro'ss',.-.",..8l'e'c:'r'i'c'allilEnerj'yj,';i:
Ci'n'er'at'ed'i:.;':.::,'(MR/,.)'.)'-:"
- -:,:';'-.:,'Ãet:,:-":,'Elec,@jan'c'al..>Eiierg'j:'-:'.C'enera't'e'6-::i::(MWH)'"::,'::+:
- .:,',;.Vnitghyai3,'ab~ility)Pactm:::(e)::"::..A';:;:.':.:":::4,",;4~
- -::"':;:.':UiYfk:;Caja'ii%y.:.:'iPHc't'o'i':::~:(Vkxng'.,:,:NDC.,:,::Set)g:,'.':::.;:j
.gi.Vni,,',t;:",":,'Porcd!...Outa'g@,::, R'ate,:::;:(;%.):.
744 650.6 0.0 639.2 0.0 824,000 773 277 85.9s 85.9s 85.1s 81.8a 14.1s (ij'Yr',""':,'-:',co.'~98'te~
7,296 6,134.9 0.0 6,104.5 0.0 22,947,275 7,959,800 7,498,352 83.7%
83.7a 84.2s 80.9$
3.5%
':N(j",.:.5;Qg:5:":ga(g mg>:(:~
'"j~'~C11mu1 at.kve,".."'"'0,472 27,595.1 0.0 26,858.1 0.0 98,341,376 34,132,400 32,011,004
- 53. 2't
- 53. 2%
51.9S 49.9s 21.1$
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e
Februar 1 1992 70 da s
25.
If Shutdown At End of Report Period, Estimated Date of Start-up:
N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast
~05 85
~06 85 ll 85 Achieved 05/525 85 06/610 85 01 28 86
9112120164 911211 PDR ADOCK 05000528
]
R PDI~