ML17306A297

From kanterella
Jump to navigation Jump to search
Submits Special Rept 2-SR-003:on 911125,inservice Insp of Steam Generators Completed.Insp Resulted in Plugging of 15 Tubes in Steam Generator 1 & 26 Tubes in Steam Generator 2. Complete Inservice Insp Results Will Be Sent by 921125
ML17306A297
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/04/1991
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
192-00761-JML-T, 192-761-JML-T, NUDOCS 9112110028
Download: ML17306A297 (6)


Text

FORD 1

REGULRT(O INFORMATION DISTRIBUTIONOCSTEM (RIDE)

ACCESSION NBR:9112110028 DOC.DATE: 91/12/04 NOTARIZED: NO DOCKET FAC.'ID':bTN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUIH.NAME AUTHOR AFFILIATION LEVINE,J.M.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits Special Rept 2-SR-003:on 911125,inservice insp of steam generators completed.?nsp resulted in plugging of 15 tubes in Steam Generator 1

a 26 tubes in Steam Generator 2.

Complete inservice insp results will be sent by 921125.

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR L ENCL L SIZE:

TITLE: OR Submittal: Znservice Inspection/Testing/Relief from ASME Code X

NOTES:Standardized plant.

05000529 x)

RECIPIENT ZD CODE/NAME PD5 LA TRAMMELL,C INTERNAL: ACRS NRR/DET/EMEB 7E

- ~CPM RE ILE 01 EXTERNAL: EGQG BROWNFB NRC PDR NOTES:

COPIES LTTR ENCL 1

0 2

2 6

6 1

1 1

0 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EGGG RANSOME,C NSIC COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

0 1

1 1

1 1

1

58. CeV, OI Igij7ei5 CAi-de glue

+O gWCa<eC'Cg a Cud z..

X7 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 21

0

'l

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034

~

PMOENIX. ARIZONA85072-2034 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 192-00761-JML/TRB/RKR December 4,

1991 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station Pl-37 Washington, D.C.

20555

Dear Sirs:

Subj ect:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No.

STN 50-529 (License No. NPF-51)

Special Report 2-SR-91-003

'ile'1-020-404 Attached please find Special Report 2-SR-91-003 prepared and submitted pursuant to Technical Specifications 4.4.4.5 and 6.9.2.

This report discusses steam generator tube plugging in Unit 2 ~

We are forwarding a copy of the Special Report to the Regional Administrator of the Region V office.

If you have any questions, please contact T. R. Bradish, Compliance

Manager, at (602) 393-2521.

Very truly yours, JML/TRB/RKR/nk Attachment cc:

W. F.

Conway J.

B. Martin D. H.

Coe (all with attachment)

I(g

'? 1!.=-".'002S Pl1204 PI3R ADOCt 0.>000='29 PDFI

~i 4

C Il

PALO VERDE NUCLEAR GENERATING STATION Steam Generator Tube Plugging License No. NPF-51 Docket No.

STN 50-529 Special Report 2-SR-91-003 This special report is provided pursuant to Palo Verde Unit 2 Technical Specifications 4.4.4.5(a) and 6.9.2 to report the number of steam generator tubes plugged as a result of inservice inspection activities.

On November 25, 1991, Unit 2 was in a refueling outage with the core off-loaded to the Spent Fuel Pool when an inservice inspection of both steam generators was completed.

The inspection resulted in the plugging of 15 tubes in Steam Generator No.

1 and 26 tubes in Steam Generator No. 2.

Pursuant to Technical Specification 4.4.4.5(b),

the complete results of the steam generator tube inservice inspection will be submitted by November 25, 1992.

~ 4

~