ML17306A284
| ML17306A284 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/27/1991 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-02083-WFC-T, 102-2083-WFC-T, NUDOCS 9112060258 | |
| Download: ML17306A284 (8) | |
Text
ACCELERATED DIS UTION DEMONS TION SYSTEM r'
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9112060258 DOC.DATE: 91/11/27 NOTARIZED: NO DOCKET g
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Discusses rescheduling of emergency operating procedure upgrade program to 920601,per 911106 mgt meeting in Region V
ofc.Final training on new EOPs will be conducted on 920227-0330.
R D
DISTRIBUTION CODE:
A045D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
- Plans, Implement'g NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
/
rocedures, C A 05000528 05000529 D
05000530 D
RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: NRC PDR NOTES:
COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME TRAMMELL,C NRR/DREP/~gB9 D R
Kf~
NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE> CONTACT THE DOCUMENT CONTROL DESK ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
[I I
H
r
~
~
Arizona Public Service Company P.O, BOX 53999
~
PHOENIX, ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 102-02083-WFC/XRB/PJC November 27, 1991 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station: P1-37 Washington, D. C. 20555
Reference:
Letter No. 102-01946-WFC/TRB/JJN, dated January 3, 1991, from W.
F. Conway, Executive Vice President, Nuclear, Arizona Public Service Company to U. S. Nuclear Regulatory Commission, Document Control Desk.
Gentlemen:
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION (PVNGS)
UNITS 1, 2, AND 3 EMERGENCY OPERATING PROCEDURES File: 91-056-026 On November 6, 1991, representatives of APS and NRC held a management meeting at the NRC Region V offices in Walnut Creek, California. During the course of the meeting, APS discussed the Emergency Operating Procedure (EOP) Upgrade Project and the need to reschedule the implementation date for the upgraded EOPs to June 1, 1992.
The upgraded procedures improve readability, useability, and provide more specific direction for actions.
Initial training on the upgraded EOPs resulted in numerous comments and questions from Operations personnel, including the suggestion that additional time for training would be beneficial.
The extended schedule will enable APS to evaluate and resolve operator comments prior to final training and to ensure sufficient training time is provided.
The revised schedule for completion of the EOP Upgrade Project is provided as Attachment 1.
As indicated in the revised schedule, the evaluation and incorporation of operator comments will continue through the present requalification training cycle (NLR08, 11/12/91 - 1/10/92).
Once operator comments have been incorporated, the upgraded EOPs will be revalidated.
Upon completion of the revalidation, the new EOPs will be submitted for the required review and approval process which includes the Procedure 9ii2p$02 p5ppp5'2/i 9iii27 PQR
/DOCK poR P.
NRC Document Control Desk Page 2 102-02083/WFC/TRB/P JC November 27, 1991 Review Group (PRG).
Final training on the new EOPs will be conducted during training cycles NLR10 (2/27/92 - 3/30/92) and NLR11 (3/30/92 - 5/11/92).
Approximately three weeks will be available for final comment resolution and any needed additional training prior to the June 1, 1992, implementation date.
5 Operations management evaluated the concern that the training process being used for the upgraded EOPs could potentially compromise the ability of operating crews to implement the current EOPs.
It was found that the operators are well-versed in the current EOPs and are well aware that the current EOPs are still in effect.
Additionally, since the new EOPs are primarily a philosophy change, as opposed to a revision in strategy, the new EOPs do not cause the operators to take different actions from the present EOPs.
However, to preclude any possible confusion, training that willidentify the differences between the current and the upgraded EOPs will be conducted during the present training cycle (NLR08), and during the 1992 cycles, as deemed necessary, until the new EOPs are ready for implementation.
As a further measure to effect a smooth transition to the new EOPs, a task team, composed of members from several APS organizations, was formed to evaluate the current and upgraded EOPs to ensure that the concepts and methods for maintaining safety system functions remain essentially unchanged.
The evaluation is targeted for completion by the end of 1991.
Quality Assurance will monitor both this evaluation and the overall EOP transition process.
Should you have any questions concerning the revised EOP schedule, please contact me.
Very truly yours, Attachment WFC/TRB/PJC/dmn cc:
J. B. Martin D, H. Coe
C i ~
~ ~~
NRC Document Control Desk 102-02083/WFC/TRB/P JC November 27, 1991 ATTACHMENT1 REVISED EOP UPGRADE COMPLETION SCHEDULE Mltestones 11/12/91 - 1/1 0/92 Project Task Continue evaluation and incorporation of operator comments on revised EOPs.
Begin initial operator training on new Functional Recovery Procedure.
01/1 0/92 - 2/1 7/92 02/1/92 - 3/30/92 Revalidate revised Emergency Operations (EO) and Recovery Operations (RO) procedures.
Submit for Procedure Review Group review and approval.
Train operators on approved (new) EOs and ROs.
Revalidate revised Functional Recovery Procedure.
Submit for Procedure Review Group review and approval.
03/30/92 - 5/1 1/92 Train operators on approved (new)
Functional Recovery Procedure.
Evaluate operators on approved (new) EOPs.
05/1 1/92 - 5/30/92 Final comment resolution and contingency training.
06/01/92 Implement new EOPs.