ACCELERATED DISTRIBUTION DEMONS r1 ION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9110170040 DOC.DATE: 91/10/10 NOTARIZED: NO DOCKET g
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
D
SUBJECT:
Forwards proposed operator licensing,requalification exam generic fundamental exam schedules,per Generic Ltr 91-12, "Operator Licensing Exam Schedule."
S DISTRIBUTION CODE:
A007D COPIES RECEIVED:LTR ENCL J SIZE: K TITLE: Response to Generic Letter 90-07: Operator Licensing National Exam Sc /
NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
05000528 A
05000529 05000530 RECIPIENT ID CODE/NAME TRAMMELL,C INTERNAL: NRR/DLP
- Oj B REG EXTERNAL:
RC PDR NOTES:
COPIES LTTR ENCL 2
2 2
2 1
1 1
1 1
1 RECIPIENT ID CODE/NAME THOMPSON,M NRR/DOEA NSIC COPIES LTTR ENCL 2
2 1
1 1
1 D
R D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASfE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
~
~
Arizona Public Service Company P.O, BOX 53999
~
PHOENIX, ARIZONA85072-3999
~
WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-04199-WFC/GEC October 10, 1991 Docket Nos.
STN 50-528/529/530 U.
S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-37 Washington, D.
C.
20555
Reference:
Letter from the U. S, Nuclear Regulatory Commission, J.
W. Roe, to W.
F.
- Conway, Arizona Public Service
- Company, dated October 11, 1990; "Response to letter dated September 17, 1990 (161-03478-WFC/GEC)"
Dear Sirs:
Sub) ect:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2,
and 3
Operator Licensing National Examination Schedule (Generic Letter 91-12)
File:
91-005-419.06 The information requested from Arizona Public Service Company (APS) in response to Generic Letter 91-12 is enclosed.
Our response provides an update of the examination dates and the anticipated number of candidates from PVNGS to be examined (Enclosure
- 1) and the proposed requalification examination schedules (Enclosure
- 2) for fiscal years 1992 through 1995.
Enclosure 3 provides an estimate of the number of candidates from PVNGS who will participate in the Generic Fundamentals Examination Schedule (GFES) during the 1992 fiscal year.
The dates for the 1992 operator licensing examination, provided in Enclosure 1,
differ from those assigned in Generic Letter 89-03.
In the referenced letter the NRC approved a request by APS to deviate from the National Exam Schedule and conduct the 1992 examination in June rather than March.
As requested in the Generic Letter, this information is being forwarded to the Chief, Operator Licensing Branch by copy of this letter.
Please call Gary Clyde at (602) 340-4252 with any questions.
Sincerely, WFC/GEC/gec Enclosures 9110170040 91%010 PDP ADOCK 05000528 V
'DR
4
~
t 161-04199-MFC/GEC" October 10, 1991 Document Control Desk U.
S. Nuclear Regulatory Commission
Response
to Generic Letter 91-12 Page Two cc:
R.
M. Gallo J.
B. Martin D. F. Kirsch L. F. Miller D. H.
Coe A. C. Gehr A. H.
Gutterman'all w/enclosures)
161-04199-WFC/GEC October 10, 1991 Enclosure 1
PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT FACILITY Palo Verde Nuclear Generatin Station NRC REGION 1.
Assigned Date (GL 89-03)
¹RO FY 1992 (10/1/91-9/30/92) 6/15/92 6/22/92 6//29 92 (1) 22 FY 1993 (10/1/92-9/30/93) 9/06/93 9//13 93 12 FY 1994 (10/1/93-9/30/94)
FY 1995 (10/1/94-9/30/95) 3/20/95
~327 93 12
¹SRO Instant
¹SRO Upgrade
¹SRO Limited 2.
Assigned Date (GL 89-03)
¹RO
¹SRO Instant
¹SRO Upgrade
¹SRO Limited NOTE (1):
The dates for the 1992 operator licensing examination differ from those assigned in Generic Letter 89.-03.
In a letter from the U.
S. Nuclear Regulatory Commission, J.
W. Roe, to W. F.
Conway, Arizona Public Service Company (APS), dated October 11,
- 1990, the NRC approved a request by APS to deviate from the National Exam Schedule and conduct the 1992 examination in June rather than March.
'I C
~ )
161-04199-MFC/GEC October 10, 1991 Enclosure 2
PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT FACILITY Palo Verde Nuclear Generatin Station NRC REGION 1
~ Date
- 2. Date
- 3. Date
- 4. Date
- 5. Date FY 1992 (10/1/91-9/30/92) 9 14-18 92 9 21-25 92 9 28-10 2 92 FY 1993 (10/1/92-9/30/93) 3 15-19 93 3 22-26 93 3 29-4 2 93 FY 1994 (10/1/93-9/30/94) 3 14-18 94 3 21-25 94 3 28-4 1 93 FY 1995 (10/1/94-9/30/95) 9 11-15 95 9 18-22 95 9 25-29 95
~ ~ ~
~
161-04199-MFC/CEC October 10, 1991 Enclosure 3
PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FORMAT FACILITY Palo Verde Nuclear Generatin Station NRC REGION Estimated Number of,. ",
Candidates OCTOBER 1991 0
FEBRUARY 1992 0
JUNE 1992 12 The Generic Fundamental Examination Schedule (GFES) is administered three times a year, on'he Wednesday following the first Sunday in February,
- June, and October.