ML17305B606
| ML17305B606 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/10/1991 |
| From: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| References | |
| NUDOCS 9106240092 | |
| Download: ML17305B606 (6) | |
Text
~p,S 4E0y(~r0 cv '%
$ )
I 0
.~4'+*i>>
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Y 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 Docket Nos. 50-528/529/530 Arizona Public Service Company P. 0.
Box 53999, Sta.
9012
- Phoenix, Arizona 85072-3999 JUN ~ 0 199)I Attention:
MIr. William F.
Conway Executive Vice President, Nuclear
Subject:
OPERATOR TRAINING PROGRAM CONCERNS This letter is to express the NRC's concern.-related to your licensed operator training program.
During the period of May 20-24,
- 1991, NRC examiners validated the testing materials for the June, 1991 initial operator licensing examination, at your Palo Verde Nuclear Generating
- Station, Units 1, 2, and 3.
This effort was coordinat d with licensed senior reactor operators and senior. training personnel from your s'taff, to ensure the technical accuracy and applicability of the testing materials, covering plant specific job performance skills, knowledges, a'nd abilities, required by licensed operators.
The examiners observed that some of the training materials were inadequate, in that they were not current with existing plant operating procedures.
Also, preparation of scenarios required for a comprehensive examination was somewhat impeded due to an apparent limited selection of availyble malfunctions and override capabilities on your simulator.
These observations appear to reflect a continuation of training program weaknesses which have been observed previously.
The details of these issues were discussed.in a meeting between your training staff and the Chief Examiner, Mr. T. Meadows, on May 25, 1991.
In a subsequent conversation on May 30, 1991, the concern was raised to the attention of Mr. Levine of your staff by Mr. Perkins of this office.
We think that it is important"to resolve any remaining training or simulator problems promptly and well before your Requalification Program Evaluation scheduled for September 9-27, 1991.
We understand that the status of the APS training program and simulator will be discussed in conjunction with NRC's expectations at a meeting with Region V to be scheduled for late June or early July of this year.
We look forward t that discussion.
J.
B. Martin Regional Administrator 910b240092 910b10 PDR ADOCK 05000528 V
~
~
P
CC:
R.
Zimaerman K. Perkins D. Kirsch L. Miller T. Meadows R. Gallo, OLB/NRR J.,Roe, DLPQ/NRR
t'
RV/jk EST C
PY Es
./
o JUN ~ 0 1RNj k
EST C
PY 0
ST C
PY RE EST C
PY
/
NO S /
NO Y
S /
LMILLER 5/g 91
) ~ %a+, 1l g'k KIRSCH~
5g/ /91 PERKINS MART g/8//91 4/f/91 gt'&
e/s//y/'O PDR YES /
NO r ~ rrrrr
I