ML17305B550
| ML17305B550 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/21/1991 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17305B551 | List: |
| References | |
| 161-03961-WFC-J, 161-3961-WFC-J, NUDOCS 9105310006 | |
| Download: ML17305B550 (6) | |
Text
FQHD 1
REGULRY INFORMATION DISTRIBUTI SYSTEM (RIDE)
ACCgfSION NBR:910 FACIL:STN-50-528 STN-50.-529 STN-50-530 AUTH.NAME CONWAY,W.F.
RECIP.NAME 5310006 DOC.DATE: 91/05/21 NOTARIZED:
NO DOCKET Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTHOR AFFILIATION Arizona Public Service Co. (formerly Arizona Nuclear Power RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits Rev 6 to salt deposition 6 impact monitoring plan for PVNGS.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR / ENCL /
SIZE: g +
g TITLE: OR Submittal:
General Distribution NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
x 05000528 05000529 M 05000530 RECIPIENT ID CODE/NAME PD5 LA TRAMMELL,C INTERNAL: ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB8H3 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR NOTES:
COPIES LTTR ENCL 1
1 2
2 6
6 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M NRR/DET/ECMB 9H NRR/DOEA/OTSB11
'NRR/DST/SELB 8D NRR/DST/SRXB 8E OC B
EG 01 NSIC COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
0 1
1 1
1 gQ.'/5 R/DEi EsG8 M
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 27 ENCL 25
t, II I ~
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX, ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-03961-WFC/JRP May 21, 1991 Docket Nos.
STN 50-528/529/530 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Mail Station Pl-37 Washington, D.
C.
20555
Dear Sirs:
Subj ect:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2,
and 3
Proposed Change to the Salt Deposition and Impact Monitoring Plan File: 91-001-001-8; 91-056-026" Pursuant to the requirements of Facility Operating License Nos.
NPF 41, NPF 51, and NPF 74, Appendix B, Environmental Protection Plan (Non-Radiological) Section 4.2.2.,
enclosed for your review and approval is proposed Revision 6 to the Salt Deposition and Impact Monitoring Plan for PVNGS.
The purpose of the Salt Deposition and Impact Monitoring Plan is to assess the impacts of cooling tower salt drift on soils, native vegetation and agricultural crops in the PVNGS vicinity.
The monitoring program associated with the plan was implemented prior to the commercial operation of Unit 1, and was required for a minimum of three full years after the commercial operation of all three PVNGS Units, or until such time that,PVNGS can demonstrate to the satisfaction of the NRC that the objectives of the study have been fulfilled.
Since January 28,
- 1986, (commercial operation, Unit 1)
PVNGS has monitored salt drift emissions from the operation of the mechanical draft cooling towers to determine the environmental impact.
This information has been transmitted annually to the NRC Staff.
Between March 1989 and April 1990, the Palo Verde Units experienced outages of various durations which resulted in reduced mechanical draft cooling tower usage.
Therefore, APS has decided to continue the monitoring of salt drift emissions for an additional year, beyond the required three full year period.
9105310006 9i052i PDR ADQCK 05000528
, P PDR g&
I h
t II ll
161-03961-WFC/JRP May 21, 1991 U.
S. Nuclear Regulatory Commission Document Control Desk Page Two APS and NUS Corporation have reviewed the results to date of salt deposition monitoring and have determined that program modifications are appropriate.
Enclosed with this letter, is the NUS report entitled "A Study of the ANPP Drift Deposition Monitoring Program After Four Years of PVNGS Operation."
Section 5.0 of the NUS report describes the proposed program modifications.
The proposed modifications would result in a positive economic impact on the organization, while maintaining a program adequate to detect any environmental impact of cooling tower operation.
These proposed modifications are reflected in the proposed Revision 6 to the Salt Deposition and Impact Monitoring Plan for PVNGS, and,will be implemented following NRC approval.
If you should have any questions, please call Michael E. Powell of my staff at (602) 340-4981.
Sincerely, WFC/JRP/pmm Enclosure cc:
C.
M.
J.
B.
D.
H.
A. H.
A.
C.
Trammell Martin Coe Gutterman Gehr
C t