AUCULjKAID ulb LKLUUILUN uULYLUNblKAlju& 5Y5lUM
~
~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
~
~
~
~
~
~
~
~
ESSION NBR: 9104260137 DOC. DATE: 91/04/17 NOTARIZED:
NO DOCKET SCIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document, Control Branch (Document Control Desk)
R
SUBJECT:
Provides update corrective steps stated in 910102 ltr re addendum to response to notice of violation of Insp Rept 50-529/90-45'.No further rev of retest manual required for event.-
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR Q ENCL t7 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Standardized plant.
. /
05000529 A
RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M INTERNAL". ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S t
NRR/DOEA/OEAB NRR/DRIS/DIR NRR/PMAS/ILRB12 0
REG F LE 02 EXTERNAL EG&G/BRYCE g J ~ H ~
NSIC NOTES COPIES LTTR ENCL RECIPIENT ID CODE/NAME TRAMMELL,C AEOD AEOD/TPAB NRR MORISSEAUiD NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS1 RGN5 FILE 01 NRC PDR COPIES LTTR ENCL D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAIVEFROM DISTRIBUTION t
LISTS FOR DOCUMENTS YOU DON'T NEED!
>TAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL D
D
'S
WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR Arizona Public Service Company P.O. BOX 53999
~
PHOENIX, ARIZONA85072<999 P
102-02016-WFC/TRB/JJN April 17, 1991 U.
S. Nuclear Regulatory Commission Attention:
- Document Control Desk Mail Station:
Pl-37 Washington, DC 20555
Reference:
Letter from W. F.
- Conway, Executive Vice President Nuclear, A'rizona Public Service, to U.
S. Nuclear Regulatory Commission, dated January 2,
1991
Dear Sirs:
Subj ect:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1, 2, and 3
Docket No.
STN 50-528 (License No. NPF-41)
Docket No.
STN 50-529 (License No. NPF-51)
Docket No.
STN 50-530 (License No. NPF-74)
Addendum to Reply to Notice of Violation 50-529/90-45-01 File:
91-070-026 This letter is provided to update the corrective steps stated in the referenced letter.
APS has revised the Valve Motor Operator Monitoring and Test Program.(73PR-9ZZ04)'o add an appendix to identify the appropriate retest for Motor Operated Butterfly Valves (MOBVs).
(This appendix excludes
'OBVs that already have associated Local Leak Rate Tests.)
APS has reviewed the retest manual and has determined that sufficient guidance is contained within the procedure.
Specifically, Appendix A provides that motor operated valves be retested to verify position after rework or replacement of the motor operator.
Appendix C requires that 73PR-9ZZ04, Valve Motor Operator Monitoring and Test Program, be referenced for all retests involving MOVs.
Therefore, no further revision of the retest manual is required for this event.
Should you have any questions regarding this response, please contact me.
Very truly yours, WFC/TRB/JJN cc: