ML17305B417
| ML17305B417 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/26/1991 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17305B418 | List: |
| References | |
| 161-03838-WFC-G, 161-3838-WFC-G, NUDOCS 9104010298 | |
| Download: ML17305B417 (14) | |
Text
.'ACCELERATED DISTRIBUTION DEMONS TION SYSTEM REGULATORY'-INFORMATION DISTRIBUTION SYSTEM (RIDS)
,ACCESSION NBR:9104010298 DOC.DATE: 91/03/26 NOTARIZED:
NO DOCKET' FACIL:STN-50-528 Palo Verde Nuclear Station, Unit, 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3,, Arizona Publi 05000550:
AUTH.NAME AUTHOR AFFILIATION
,.CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power R
RECIP.NAME RECIPIENT AFFILIATION Office of Nuclear Reactor Regulation, Director (Post 870411
SUBJECT:
Forwards "Palo Verde Nuclear Generating Station Simulator D
1991 Certification Submittal."
DISTRIBUTION CODE:
A005D COPIES RECEIVED:LTR TITLE: Simulator Facility Certification
'NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
S
/
05000528 05000529 A
05000530 D
ENCL g SIZE: ~k 5G".
RECIPIENT ID CODE/NAME INTERNA CENTRA EXTERNAL: NRC PDR NOTES COPIES LTTR ENCL 1
1 1
1 1
1 RECIPIENT ID CODE/NAME NRR/DLPQ/LOLB10 COPIES LTTR ENCL 1
1 D
1 S
D S
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION.
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 4
ENCL 4
S
0
\\
r 4
I,
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX. ARIZONA85072<999 10 CFR 55. 45 (b)
WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-03838-WFC/GEC March 26, 1991 Docket Nos.
STN 50-528/529/530 Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2,
and 3
Simulation Facility Certification File:
91-056-026 Arizona Public Service Company (APS),
in accordance with 10 CFR 55.45(b)(2)(iii).,
hereby
- certifies.
the PVNGS Unit l.
Simulator as a
Plant-Referenced Simulator pursuant to 10 CFR 55.45(b)(l)(ii).
A completed, signed NRC Form
- 474, "Simulation Facility Certification," is attached for each PVNGS Unit and one copy of the Certification Submittal, which constitutes the supporting documentation, is also attached.
The Certification Submittal includes a
Certification Package Overview as well as detailed information concerning Certification exemptions and justification, performance test abstracts and a
schedule for periodic test performance, Simulator capabilities and environment, Simulator discrepancies, and differences between the Simulator and the individual PVNGS Units.
APS will comply with the requirement. in 10 CFR 55.45(b)(5)(ii) that licensees "Submit, every four years on the anniversary of the certification, a report to the Commission which identifies any uncorrected performance test failures, and submit a schedule for correction of such performance test failures, if any."
Appropriate controls have been instituted to ensure compliance with this requirement.
In addition, 10 CFR 55.45(b)(5)(iv) requires "...a schedule for the conduct of approximately 25 percent of the performance tests per year for the subsequent four years."
This schedule is included in Section 8 of the attachment.
910401029S 9i0326
'PDR AGOCK 08000828 p
Il J
'A p~:GlV LZ UlN l6.
HOIST%"lA038 80l,QV~~J VV'OAH
",) ~~'vsn
Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Simulation Facility Certification Page Two 161-03838-WFC/GEC March 26, 1991 Xf you have any questions or require further information, please contact Michael E. Powell at (602) 340-4981.
Sincerely, WFC/GEC/gec Attachments cc:
Document Control Desk J.
B. Martin D. F. Kirsch L. F. Miller D. H.
Coe A. C.
Gehr A. H. Gutterman (w/attachment)
(w/attachment)
(w/attachment)
(w/attachment)
(w/attachment)
t
~ Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Simulation Facility Certification.
Page Three 161-03838-WFC/GHC March 26, 1991 bcc: J.
M. Levine J.
N. Bailey W. F. Quinn M. E. Powell R. A. Bernier E.
G. Firth D.
C.
Brown E.
E.
Van Brunt Document Source Library (6125)
(1966)
(1502)
(1515)
(1515)
(6155)
(6153)
(1922)
(6715)
(w/attachment)
(w/attachment)
(w/attachment)
, ~ ~
NRC FORM 474, 1140) 10 CFR 55.45(b),
65.4 and 65$
U.S. NUCLEAR REGULATORYCOMMISSION SIMULATION FACILITY CERTIFICATION APPROVED BY OMBr NO. 3)504)138 EXPIRES: 9404)2 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST:
120 HRS. FORWARD COMMENTS REGARDING BURDEN ESl'IMATE TO THE INFOR.
MATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714),
U.S.
NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO THE PAPERWORK REDUCTION PROIECT (3150-0138), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.
INSTRUCTIONS. This form Is to be filed for Initial cert(fication, recertification (ifrequired), and for any change to a simulation facilityperformance testing plan made after initial submittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal.
FACILITY Palo Verde Nuclear Generating Station, Unit 1 DOCKET NUMBER M. 528 LICENSEE Arizona Public Service Company DATE 3/26/91 This is to certify that:
1.
The above named facilitylicensee Is using a simulation facilityconsisting solely of a plant-referenced simulator that meets the requirements of 10 CFR 55.45.
2.
Documentation is available for NRC review In accordance with 10 CF R 55.45(b).
3.
This simulation facilitymeets the guidance contained in ANSI/ANS3.5, 1985, as endorsed by NRC Regulatory Guide 1.149.
Ifthere are anyexceptions to the certification Of this item, check here ~
and describe fullyon additional pages as necessary.
NAME(or other ident/fioat/on J AND LOCATIONOF SIMULATIONFACILITY Palo Verde Nuclear Generating Station Unit 1 Simulator SIMULATIONFACILITYPERFORMANCE TEST ABSTRACTS ATTACHED.(Forperfonnance tests conducredin the peridd end/ng with the dare ofthis cen/f/cation J DESCRIPTION OF PERFORMANCE TESTING COMPLETED (Attach add/(iona/page(sJ as necessary, end ident/fy rhe nem description be/ng continued J IP Refer to the attachment to this Simulation Facility Certification SIMULATIONFACILITYPERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct ofapproximate/y 25% ofperformance rests per yasr forthe four year period commenc/ng with the dare ofthis cert/fication./
DESCR(iITION OF PERFORMANCE TESTING TO BE CONDUCTED. (Attach addit/one/page(s/ as necessary, and /dent/fy the /rem descriprion being continued/
Refer to the attachment to this Simulation Facility Certification PERFORMANCE TESTING PLAN CHANGE. (Forany mod/f/cation to a perfonnance testing plan submitted one prev/ous carr//ication/
DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (A(tech addniona/page(s/
as necessary, and ident/fy the irem description being continued/
NOT APPLICABLE R E CERT( F ICATION (Descr/be correct/ve act/ons taken, attach resu/rs ofcomp/ared perfonnance rest/ng in accordance w/th 10 CFR g 55 45(bi(5J/vJ, Attach addi(/ona/ page(s/ es necessary, end Identify the item descript/on be/ng cont/nued J NOT APPLICABLE Any false statement or omission In this document, including attachments, may be subject to civiland almlnal sanctions.
I certify under penalty of perjury that the information in this document and attachments is true and correct.
SIGNATURE AUTHORIZED RE ESENTATIVE TITLE Executive Vice President, Nuclear DATE
~y~a/p In accordancewlth10 CFR (j 55.5, Com ns, this form shall be submitted to the NRC as follows:-
BY MAILADDRESSED TO:
Oi or, ffice of Nudaar Reactor Reguiat(on BY DELIVERYIN PERSON U
N r Regulatory Commission TO THE NRC OFFICE AT:
W gton, DC 20655 NRC FORM 474 (140)
One White Flint North 11655 Rockville Pike Rockville, MD
J I
I
NRC FORM 474 f140) 10 CFR 65 45fb),
65.4 and 645 v
U.S. NUCLEAR REGULATORYCOMMISSION SIWlULATION FACILITY CERTIFICATION APPROVED BY0MB: NO.31604)138 EXPIRFS: 8004)2 ESTIMATED BUADEN PER
RESPONSE
TO COMPLY WITH THIS INFORMATION COLLECTION AEQUESTs 120 HRS. FORWARD COMMENTS REGARDING'URDEN ESTIMATE TO THE INFOR-MATION AND RECORDS MANAGEMENT BRANCH IMNBB 77'l4),
U.S.
NUCLEAR REGULATOAY COMMISSION, WASHINGTON, DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT l3150.
0138), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.
INsTRUGTloNs. This form is to be filed for initialcertification, recerlification (ifrequired), and for any change to a simulation facilityperformance testing plan made after initial submittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal.
FACILITY f'alo verde Nuclear Generating Station, Unit 2 DOCKET NUMBER so-529 LICENSEE Arizona Public Service Company DATE 3/26/91 This Is to certify that:
1.
The above named facility licensee Is using a simulation facilityconsisting solely of a plant referenced simulator that meets the requirements of 10 CFR 55.45.
2.
Documentation is available for NRC review in accordance with 10 CFR 55.45(b).
This simulation facility meets the guidance contained in ANSI/ANS3.5, 1985, as endorsed by NRC Regulatory Guide 1.149.
Ifthere are any exceptions to the certification of this item, check here ~
and describe fullyon additional pages as necessary.
NAME(or otheridantificationJ AND LOCATIONOF SIMULATIONFACILITY Palo Verde Nuclear Generating Station Unit 1 Simulator SIMULATIONFACILITYPERFORMANCE TEST ABSTRACTS ATTACHED.(Forperformance tesrs conducted In the period ending wirh the date ofthis certificationJ DESCRIPTION OF PERFORMANCE TESTING COMPLETED (Attachadditiona/page(slasnecessary,and/dentlfytheitemdascriptionbalngcontinuedJ, Refer to the attachment to this Simulation Facility Certification SIMULATIONFACILITYPERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct ofappmximately 25% ofperformance tests per year forthe four year period commencing with the date ofthis certlficationJ DESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED. (Attach additional page(sl as necessary, and kfentifythe irsm dascr/pt/on being contlnuedJ Refer to the attachment to this Simulation Facility Certification PERFORMANCE TESTING PLAN CHANGE. (For any mod/fleet/on to a performance testing plan submitted on 4 previous cert/ficatlon/
DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Attach additional page(sJ as necessary, and identify the item descr/pl/on being continuedI NOT APPLICABLE RECERTIFICATION (Describe correct/reactions taken, attach resulrs ofcompleted perfonnance test/ng in accordance with 10 CFR g 55 45(bJ(5/lvJ.
Attach additional page(sJ as necessary. and Identifythe item description being continued.l NOT APPLICABLE Any false statement or omission In this document, Including attachments, may be subject to civiland criminal sanctions.
I certify under penalty of perjury that the information in this document and attachments Is true and correct.
SIGNATURE AUTHORIZED REPRE NTATIVE TITLE Executive Vice President, Nuclear
"~/~g/rp/
In accordanc>> with 10 CF
() 55J), Commun t
ns, this form shall be submitted to the NRC as follows:
~
BYMAILADDRESSED TO:
- Director, ffl of Nudear Reactor Regulation BY DELIVERYIN PERSON One White Flint North UA. Nu agu)ately Commission TO THE NRCOFFICE AT:
11555 Rockville Pike Washington, DC 20555 Rockville, MD NAC FORM 474 I14)0)
~ I
'tf h
NRC FORM 474~
I)4)0) 10 CF R 65.45tu),
55.4 sad 65'5 U.S. NUCLEAR REGULATORYCOMMISSION SIMULATION FACILITY CERTIFICATION APPROVED BYOMBr NO. 31500138 EXPIRES: 8004j2 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WITH THIS INFORMATION COLLECT)ON BEQUEST: 120 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFOR-MATION AND RECORDS MANAGEMENT BRANCH IMNBB 7714),
Ug. NUCLEAR REGULATORY COMMISSION. WASHINGTON, OC
- 20556, AND TO THE PAPERWORK REDUCTION PROJECT (3150.
0138), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.
INSTRUCTIONS. This form N to be filed for Initialcertification, recertification (ifrequired), and for any change to a simulation facilityperformance testing plan made after initial submittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal.
FACILITY Palo Verde Nuclear Generating Station, Unit 3 LICENSEE Arizona Public Service Company DOCKET NUMBER I-530 DATE 3/26/91 This is to certify that:
1.
The above named facility licensee Is using a simulation facilityconsisting solely of a plant.referenced simulator that meets the requirements of 10 CFR 55.45.
2.
Documentation is available for NRC review ln accordance with 10 CF R 55.45(b).
3.
This simulation facility meets the guidance contained In ANSI/ANS3 5, 1985, as endorsed by NRC Regulatory Guide 1.149.
Ifthere are anyexceptions to the certificationof this item, check here bKI and describe fullyon additional pages as necessary.
NAME(or other /dent/f/cet/onJ AND LOCATIONOF SIMULATIONFACILITY Palo Verde Nuclear Generating Station Unit 1 Simulator SIMULATIONFACILITYPERFORMANCE TEST ABSTRACTS ATTACHED.(Forperfonnance tesrs conducted /n the period ending with the dere ofthis carr/f/cation J DESCRIPTION OF PERFORMANCE TESTING COMPLETED (Arrech addirionai page(sJ as necessary, and /denrify rhe hem descript/on being cont/nuedJ Refer to the attachment to this Simulation Facility Certification SIMULATIONFACILITYPERFORMANCE TESTING SCHEDULE ATTACHED. (For rhe conduct ofeppmximere/y 25% ofperformance resrs per year forthe four year period commenc/ng with the dare ofth/s cert((/car/on.J DESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED. (Attach addirionai page(si as necessary, and ident/fy rhe item description being continued J Refer to the attachment to this Simulation Facility Certification PERFORMANCE TESTING PLAN CHANGE. (For any mod/f/csr/on ro a performance testing pien subm/rred on 4 prevIous cerr/f/car/onJ DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Arrech addit/one/page(s/as necessary, end ident/fy the item descrip/on be/ng continued J NOT APPLICABLE R ECERTIFICATION (Describe correct/ve act/ons taken, attach results ofcomp/ared perfonnance test/ng in accordance with 10 CFR tj 55 45(bJ(5/ivJ.
Attach addir/onai page(sJ as necessary, and /dent/fy the iten descr/pr/on being continued.J NOT APPLICABLE Any false statement or omiss)on In this document, Including attachments, may be subject to civiland criminal sanctions.
I certify under penalty of perjury that the information in thb document and attachments Is true and correct.
SIGNATURE AUTHORIZED REPRES ATIVE TITLE Executive Vice President, Nuclear i/~g/Pf In accordance with 10 CFR 65$, Communlcati, form shall be submitted to the NRC as follows:
=
BY MAlLADDRESSED TO:
Director, 0 rce f Nuc)ear Reactor Regu)ation BY DELIVERYIN PERSON One White Flint North US. Nud~ r Su)story Commission TO THE NRC OFF ICE AT:
11555 Rockvllle Pike Wash)ngro, C 20655 Rockville, MD NRC FORM 474 I146)
0
~
~I
> ~ V