ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9012270035 DOC.DATE: 90/12/21 NOTARXZED: NO DOCKET g
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPXENT AFFILIATION MARTIN,J.B.
Region 5 (Post 820201) t
SUBJECT:
Submits progress update in response to Insp Repts 50-528/89-12,50-529/89-12
& 50-530/89-12 re verification restoration of EE-580 sys data base. Restoration will be completed by 910815.
DISTRIBUTION CODE: IEOID COPIES RECEIVED: LTR g ENCL CP SIZE:
TXTLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
D A
05000528 05000529 05000530 D
RECIPIENT ID CODE/NAME PD5 "PD TRAMMELL,C.
~
~
RNAL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA/OEAB NRR/DRIS/DIR NRR/PMAS/XLRB12 OE DIR R
02 EXTERNAL: EG&G/BRYCE,J.H.
NSIC NOTES COPIES LTTR ENCL 11' RECXPIENT ID CODE/NAME TRAMMELL,C AEOD AEOD/TPAB NRR MORISSEAUED NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS1 RGN5 FILE 01 NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
AL NUMBER OF COPIES REQUXRED:
LTTR 26 ENCL D
D S
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX, ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 102-.01933-WFC/TRB/PJC December 21, 1990 Mr. John B, Martin, Regional Administrator U.
S. Nuclear Regulatory Commission, Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368
References:
1)
Letter from W. F.
Conway, Executive Vice President, Nuclear, Arizona Public Service to J.
B. Martin, Regional Administrator, Region V, NRC, dated October 20, 19&9 2)
Letter from R.
P.
Zimmerman, Director, Division of Reactor Safety and
- Projects, Region V, NRC to WE F.
Conway, Executive Vice President, Nuclear, Arizona Public Service, dated September 20, 1989
Dear Sir:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3
Docket No.
STN 50-528 (License No. NPF-41)
STN 50-529 (License No. NPF-51)
STN 50-530 (License No. NPF-74)
Response
to Inspection Report 89-12, Progress Update File:
90-019-026 Reference 1 provided a description of APS'ction plan and commitments to complete the verification/restoration of the EE-580 system data"base.
At that time, approximately 6000 discrepancies remained.
During the review and evaluation phase of the Action Plan, it became apparent that a large number of those discrepancies had been dispositioned through the normal course of EE-580 data handling (e.g.,
DCP closeout by the System Engineering Department).
These early review/evaluation results indicated that at least 74% of the 6000 discrepancies had already been dispositioned.
Thi,s progress is attributed to the improvements made to the procedures governing the EE-580 data base and to personnel adherence to that procedural process.
Completion of the review and evaluation phase of the Action Plan was not expected until October, 1991; however, based upon the findings described, Engineering management determined that a revised course of action would facilitate resolution of EE-580 data base concerns.
A review of EE-580 data for all three units is being conducted to verify the exact number of discrepancies that have been resolved within the normal work process and to ascertain the number of discrepancies which still exist.
We expect to complete this review by the end of December, 1990 and document the results by
'>P>2270P35 yP122~
PDR ADOcf (j~ppp PEiR
Letter to John B. Martin Page 2 of 2 February 1, 1991.
To date, the review has confirmed our estimate that a
minimal number of outstanding items'remain (i.e., ( 2% of the original 100,000 discrepancies);
therefore, restoration and documented confirmation of the EE-580 data base will be completed by August 15, 1991, which will be several months earlier than previously anticipated.
Should any significant deficiencies be identified, those items will be resolved individually with appropriate analyses and walkdowns as necessary.
Valkdowns, if required, will be conducted in conjunction with the next refueling outage for the affected unit(s).
Should you have questions regarding this information, please contact me.