Requests That Simulator Exam Scheduled for Mar 1991 & Mar 1992 Be Administered in June 1991 & June 1992 Due to Upgrade Project of Control Room Simulator,Per Generic Ltr 89-03
ML17305B081
Person / Time
Site: Palo Verde  
Issue date: 09/17/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Murley T
Office of Nuclear Reactor Regulation
References
161-03478-WFC-G, 161-3478-WFC-G, GL-89-03, GL-89-3, GL-90-07, GL-90-7, NUDOCS 9010010263
Download: ML17305B081 (6)


Text

ACCELERATED DISTRIBUTION DEMONST/TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9010010263 DOC.DATE: 90/09/17 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,.W.F.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.'NAME RECIPIENT AFFILIATION MURLEY,T.E.

Office of Nuclear Reactor Regulation, Director (Post 870411

SUBJECT:

Requests change to natl exam schedule dates identified in GL 89-03 for plant during FY 1991

& 1992.

DISTRIBUTION CODE:

A007D COPIES RECEIVED:LTR Q ENCL 0 SIZE:

S TITLE: Response to Generic Letter 90-07: Operator Licensing National Exam Sc /

NOTES:STANDARDIZED PLANT 05000528 Standardized plant.

05000529 A

Standardized plant.

05000530 D

RECIPIENT ID CODE/NAME PETERSON,S.

INTERNAL:

~LRQ LB REG FILE EXTERNAL: NRC PDR NOTES COPIES LTTR ENCL RECIPIENT ID CODE/NAME TRAMMELL,C.

NRR/DOEA NSIC COPIES LTTR ENCL D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL D

D

0 0

4 il

Arizona Public Service Company P.O. BOX 53999

~

PHOENIX, ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIOENT NUCLEAR 161-C847$ 4K/GK SeptEmber 17, 1990 Docket Nos.

STN 50-528/529/530 U.

S. Nuclear Regulatory Commission Attn: Dr. Thomas E. Murley

Director, Office of Nuclear Reactor Regulation Mail Station 12 G18 Washington, D.

C.

20555

Reference:

Letter from W. F.

Conway (APS) to J.

B. Martin (NRC Region V) dated May 22, 1990;

Subject:

Palo Verde Control Room Simulator Upgrade Project

- Status Update

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2,

and 3

Request for Change to National Examination Schedule Dates for 1991 and 1992 File:

90-005-419.06 This letter is being submitted to request a change to the National Examination Schedule dates identified in Generic Letter 89-03 for the Palo Verde. Plant during fiscal years 1991 and 1992.

The enclosure to Generic Letter 89-03 assigned annual replacement examination dates of March and September for Palo Verde and the generic letter provided guidance regarding requests for rescheduling.

A recent evaluation of the simulator upgrade and training schedules has prompted the need for this submittal.

Proposed changes to the exam dates have been discussed with cognizant personnel in Region V.

During September 1989, Arizona Public Service Company (APS) awarded a contract to upgrade the Palo Verde Control Room Simulator.

The schedule and progress of the upgrade project has been discussed with the NRC Staff and has been reported in correspondence to the NRC (most recently in the above referenced letter).

In order to maintain a

schedule that will facilitate the attainment of certification of the Palo Verde Simulator by March 26, 1991, extensive simulator time has been allocated to the simulator upgrade project.

This has resulted in reduced time available for licensed operator simulator training.

Adequate simulator training time has been made avail'able to satisfy licensed operator requalification requirements;

however, the" demands on simulator time have adversely impacted the scheduling of simulator training for new operator license candidates.

License operator candidates currently in the license pathway wi,ll not have satisfied all prerequisite simulator training requirements to support the March 1991 and March 1992 assigned examination dates.

These licensed operator candidates will, however, have satisfied all prerequisite training 9010010263 90091'7 PDR'DOCK 0500052S I

V PDC I[0

II 4>

L

Dr. Thomas E. Murley U.

S. Nuclear Regulatory Commission Page 2

l61-Q347$ 447/GEC Septenlxr 17, 1990 requirements to support June 1991 and June 1992 examination dates.

To support a return to six shift rotation at the earliest possible time, APS requeststhat examinations be administeredin June 1991 and June 1992 rather than deferring the examinations until September,1991 and September 1992, respectively.

APS requests

that, based-upon, the above information,,

the next Palo Verde replacement operator license examination be scheduled for June 3',

1991 and the subsequent examination be scheduled for'June 15, 1992.

These proposed dates have been included in our response to Generic Letter 90-07.

The proposed June 1991 date has been discussed wi'th Mr. L. F. Miller of, the Region V office and found to be acceptable.

If you have any questions or require additional information, please contact Gary Clyde at (602) 340-4252.

Sincerely, WFC/GEC/gec CC: