|
---|
Category:ARCHIVE RECORDS
MONTHYEARML17313B0901996-02-13013 February 1996 Rev 0 to Calculation of Bonnet Fluid Temp for MOV SI-604/609. ML17312A7841995-12-0101 December 1995 Rsb 5-1 SD Cooling Analysis for 102% Stretch Power Using Descent Code Pvngs,Units 1,2 & 3. ML17310B2541994-04-12012 April 1994 Risk Impact of Extending TS LCO for EDG B. ML17310A6771993-09-0909 September 1993 Rev 1 to Calculation, Auxiliary Spray Line Thermal Stratification. ML17311A4471993-01-28028 January 1993 Seismic Study of Bldg. ML20079M9531991-11-11011 November 1991 Responds to NUMARC Survey in Support of NRC License Renewal Rulemaking Covering Aquatic Resources,Socioeconomic Questions & Waste Mgt Questions ML17306A1791990-12-0707 December 1990 Calculation 13-NC-SQ-200, Sample Line Plateout. ML17305A7001990-03-0606 March 1990 Package of 4 Preexam Security Agreements Made Prior to Requalification Exam Scheduled for 900320 & 21 ML20114D9641990-02-25025 February 1990 Package Consisting of Plant Lighting Sys Evaluation, Summation of Sys Engineer Walkdown Unit One & Emergency Lighting Action Plan ML17304A7611988-10-11011 October 1988 EC Sys & Control Room Temp Rise Study,Quality Class:Q Safety-Related. ML17304A7631988-09-28028 September 1988 Control Room Heat Load Calculation. ML17304A7621988-09-20020 September 1988 Bearing Temps Calculation for AFA-P01,EWA/B-P01 & SIA/B-P01 Motors Subjected to Elevated Room Temps. ML17304A7741988-06-22022 June 1988 Transient Temp Study for Electrical Penetration Rooms, Quality Class Q:Safety-Related. ML17304A7691988-05-10010 May 1988 Transient Temp Study for Auxiliary Feedwater B Pump Room. ML17304A7701988-04-0404 April 1988 Transient Temp Study for HPSI Pump Room. ML17304A7711988-04-0404 April 1988 Transient Temp Study for Containment Spray Pump Room. ML17303A8201988-03-0202 March 1988 Proposed License Condition for Reactor Coolant Pump Vibration Monitoring Program ML20149H9011987-10-0808 October 1987 Package Consisting of Repts of Licensee Telcons to Region V Re Incidents on 871007 & 1221 ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20214L1061987-05-22022 May 1987 Package Consisting of Undated LER Sequence & Coding & Search Sys Data Run,Data from NRC ES7 Actuation Data Base & Handwritten Staff Notes Re LER 87-071 ML20210T0571987-02-12012 February 1987 Package of Two Documents,Consisting of Viewgraph Detailing 860514 Disruption of Offsite Power Lines & Map of Palo Verde Region ML20214E2781986-05-16016 May 1986 Partially Withheld Record of 860516 Telcon Re FBI Investigation of Facility Power Lines.Partially Withheld Record of 860519 Telcon Also Encl IA-86-774, Partially Withheld Record of 860516 Telcon Re FBI Investigation of Facility Power Lines.Partially Withheld Record of 860519 Telcon Also Encl1986-05-16016 May 1986 Partially Withheld Record of 860516 Telcon Re FBI Investigation of Facility Power Lines.Partially Withheld Record of 860519 Telcon Also Encl ML17299B0771986-01-21021 January 1986 Record of Telcon W/Nrc on 860121 Re Annual FSAR Update Exemption Request ML20136E5911985-10-30030 October 1985 Viewgraphs Discussing 850912 Reactor Trip,Safety Injection & Loss of Pressurizer Auxiliary Spray Sys & Outlining Agenda for 851008 Pressurizer Auxiliary Spray Design Review & post-trip Review Rept.Related Info Encl ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams ML20112E7801984-11-30030 November 1984 Technical Audit Conducted During Oct-Nov 1984 ML20085M8481983-08-12012 August 1983 Press Release Re Delay in Fuel Loading Due to Defective Reactor Coolant Pumps.Unit 1 Fuel Load Date Extended to Late Dec 1984 ML20080T5521983-07-14014 July 1983 Press Release Discussing Coalition Demands on Independent Investigation Into Safety Problems at Facilities.Local & Natl Organizations Requesting NRC to Order Independent Investigation of Worker Allegations of Faulty Const ML20066F3111982-07-13013 July 1982 News Release Announcing Results of Facility Const Cost & Schedule Analysis ML17297B6141982-07-0202 July 1982 Revised Page 16 to Slide Presentation Entitled, Tentative Feature Selection. ML20101U2081982-06-29029 June 1982 Slide Presentation Entitled Independent QA Evaluation of Palo Verde Nuclear Generating Station Units 1,2 & 3. Related Documents Encl ML20079F0931982-02-17017 February 1982 Newspaper Article Re Higher Const Costs at Arizona Nuclear Project ML17297A9151981-06-18018 June 1981 Vol III of 810617-18 Slide Presentation Re Independent Design Review of Instrumentation & Control Sys Before Instrumentation & Control Sys Review Board ML20065G7251975-06-26026 June 1975 Power Cable Ampacities 1996-02-13
[Table view] Category:PACKAGE OF NONCODED MATERIAL
MONTHYEARML20079M9531991-11-11011 November 1991 Responds to NUMARC Survey in Support of NRC License Renewal Rulemaking Covering Aquatic Resources,Socioeconomic Questions & Waste Mgt Questions ML17305A7001990-03-0606 March 1990 Package of 4 Preexam Security Agreements Made Prior to Requalification Exam Scheduled for 900320 & 21 ML20114D9641990-02-25025 February 1990 Package Consisting of Plant Lighting Sys Evaluation, Summation of Sys Engineer Walkdown Unit One & Emergency Lighting Action Plan ML17303A8201988-03-0202 March 1988 Proposed License Condition for Reactor Coolant Pump Vibration Monitoring Program ML20149H9011987-10-0808 October 1987 Package Consisting of Repts of Licensee Telcons to Region V Re Incidents on 871007 & 1221 ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20214L1061987-05-22022 May 1987 Package Consisting of Undated LER Sequence & Coding & Search Sys Data Run,Data from NRC ES7 Actuation Data Base & Handwritten Staff Notes Re LER 87-071 ML20210T0571987-02-12012 February 1987 Package of Two Documents,Consisting of Viewgraph Detailing 860514 Disruption of Offsite Power Lines & Map of Palo Verde Region ML20136E5911985-10-30030 October 1985 Viewgraphs Discussing 850912 Reactor Trip,Safety Injection & Loss of Pressurizer Auxiliary Spray Sys & Outlining Agenda for 851008 Pressurizer Auxiliary Spray Design Review & post-trip Review Rept.Related Info Encl ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams 1991-11-11
[Table view] |
Text
ACCEKZRATFM DISTRIBUTION DEMON)TRATION SYSHEM t
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9004230641 DOC.DATE: 90/03/06 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILXATION Arizona Public Service Co. (formerly Arizona Nuclea r Power R RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Package of 4 pre-exam security agreements prior to D requalification exam scheduled for 900320 & 21.
DISTRXBUTION CODE: IE42D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Operator Licensing Examination Reports NOTES: 05000528 A Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPXENT CQPXES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD 1 1 PETERSON,S. 1 1 CHAN,T" 1 1 INTERNAL: ACRS 2 2 AEOD/DSP/TPAB 1 1 NRR SHANKMAN,S 1 1 NRR/DLPQ/LHFB11 1 1 NRR D jLGLQ~O "1 1 NUDOCS-ABSTRACT 1 1 FILE 02 1 1 RGN5 FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSXC 1 1 NOTES: 1 1 A
D NOTE TO ALL "RIDS" RECIPIERIS'LEA%
HELP US TO REDUCE WAS%I CONI'ACT THE DOCUMEIC'OWIROL DESK, ROOM Pl-37 (EXT. 20079) TO ELMINA'IEYOUR NAME FROM DISIRIBUTION LISTS FOR DOCUMENIS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 16
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P O BOX 52034 ~ PHOENIX, ARIZONA 85072 2034 PRE-EXAMINATION SECURITY AGREEMENT I Daniel Ensign agree that I will not knowingly divulge any information concerning the requalification examination scheduled for March 20th and 21st, 1990 to any unauthorized persons. I understand that I am to restrict participation in operator instruction involving those operators or senior operators scheduled to be administered the above requalification examination commencing 60'ays prior to the examination.
Signature/Date
- Duration to be determined by the Chief Examiner 9pp306 P~23Pb4 pgPPP528 PXIR ADOCK PDC
II Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P 0 BOX 52034 ~ PHOENIX ARIZONA 85022-2034 PRE-EXAMINATION SECURITY AGREEMENT I I agree that I will not, knowingly divulge any information concerning the requalification examination scheduled for March 20th and 21st, 1990 to any unauthorized persons. I understand that I am to restrict participation in operator instruction involving those operators or senior operators scheduled to be administered the above requalification examination commencing 60'ays prior to the examination.
Signature/Date
- Duration to be determined by the Chief Examiner
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P 0 BOX 52034 ~ PHOENIX ARIZONA 85072.2034 PRE-EXAMINATION SECURITY AGREEMENT I Diane K. Hendrick agree that I will not knowingly divulge any information concerning the recpxalification examination scheduled for March 20th and 21st, 1990 to any unauthorized persons. I understand that I am to restrict participation in operator instruction involving those operators or senior operators scheduled to be administered the above requalification examination commencing 60'ays prior to the examination.
Signat re/D e
- Duration to be determined by the Chief Examiner
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P 0 BOX 52034 ~ PHOENIX. ARIZONA 850T2-2034 PRE-EXAMINATION SECURITY AGREEMENT I Thomas C. Cannon Jr. agree that I will not knowingly divulge any information concerning the requalification examination scheduled for March 20th and 21st, 1990 to any unauthorized persons. I understand that I am to restrict participation in operator instruction involving those operators or senior operators scheduled to be administered the above requalification examination commencing 60 ays prior to the examination.
Signature/Date
- Duration to be determined by the Chief Examiner
t,