ML17305A687
| ML17305A687 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/23/1990 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17305A688 | List: |
| References | |
| 161-03022-WFC-N, 161-3022-WFC-N, GL-81-27, NUDOCS 9004230185 | |
| Download: ML17305A687 (6) | |
Text
DXSTRXBUTXON CODE:
DFOXD COPXES RECEXUED:LTR
/
ENCL I
SXZE: 74//
TITLE: Direct Flow Distribution:
50 Docket (PDR Avail)
NOTES:
Standardized plant.
Standardized plant.
05000528 05000529 05000530 D
p srmsvzoN OzMo>s
~ZO>
SYSTEM A
REGULA RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)
ACCESSION NBR:9004230185 DOC.DATE: 90/03/23 NOTARIZED: NO DOC FACIL:STN-5
.STN-50-528 Palo Verde Nuclear Station, Unit =1, Arizona Publi
. 05000528 DOCKET STN~50-'529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,N.F.
A izona Public Service Co. (formerly Arizona Nuclear Power r'ECIP.NAMERECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Public version of Procedure Change Notice 3 to Rev 6 to EPIP-33, "Offsite Assistance."
RECIPIENT ID CODE/NAME INTERNAL: NUDOCS-ABSTRACT EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL 1
1 1
1 1
1 1
1 EG FILE NRC PDR Ol RECIPIENT ID CODE/NAME COPIES LTTR ENCL 1
1 1
1 NOIR 'IO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REZQCB HASTE-'OMPACT IHE DO(XMEÃZ COVIN)L DESKF RXIN Pl-37 (EXT. 20079)
TO EKiMBQZR VAR KkK PBCK DISTRIBUTION LISTB FOR DOClÃEMZ8 YOU DGHFT NEED)
S D
D S
N..3ER OF COPIES REQUIRED:
LTTR 6
ENCL 6
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX, ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVE VICE PRESIDENT NUCI.EAR 161-03022-WFC/NEM'arch 23, 1990
'Docket Nos.
STN 50-528/529/530
,Document Control Desk U. S. Nucle'ar Regulatory Commission Mail Station Pl-37 Washington, D.
C.
20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3
Emergency Plan Implementing Procedure Update File:
90-002'-493; 90-056-026 PVNGS Emer enc P
In accordance with 10 CFR 50, Appendix E please fi d tt h d i
f I
n a
ac e
cop es o
updated mergency Plan Implementing Procedures (EPIPs).
Procedures included with this transmittal are indicated on the attached list.
By copy, of this letter we are forwarding two sets of the revised EPIP h,
e s tote.
eg on V Office.
A copy of revised EPIPs i's routinely provided to the Resident Inspector as an update to controlled procedures assigned to the NRC Resident Inspectors'ffice.
If you have any questions, please contact Gary Clyde at (602) 340-4252.
Sincerely, WFC/NEM/jle Attachments cc:
J.
B. Martin T. L. Chan S.
R. Peterson A. C. Gehr D. H. Coe K. M. Prendergast (w/a)
(2 copies of Procedures)
(w/a)
(w/a)
(w/a}
(w/a')
(w/a) (l copy Procedure) 9004230185-;900323
'DR
- ADOCK 05OOOS28 l
-'NU
I~
iJ v
N 4
i~
c<
"4r 8 Rfa r
+
UNITED STATES' NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 April 16, 1990 50-528/529/530
.Palo Verde MEMORANDUM 'FOR:
FROM:
SUBJECT:
The Division of determined that Chief, Document Management
- Branch, TIDC Director, Division of Rules and Records, ADM REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION Rules and Records has reviewed the attached document and'as
.it may now be made publicly available.
gP ~
gy Donnie H. Grims.ley, Director Division.of Rules. and Rec rds Office of Administration
Attachment:
As stated
I~
I
~0 j4)
~ ~
1