ML17305A654
| ML17305A654 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/26/1990 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 161-03026-WFC-G, 161-3026-WFC-G, NUDOCS 9004130030 | |
| Download: ML17305A654 (4) | |
Text
ACCELERATED DISTRIBUTION DEMONSHRATION SYSTEM
~
e REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9004130030 DOC.DATE: 90/03/26 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power R
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
'I
SUBJECT:
Confirms that meteorological sys calibr test program 6 subj to QA program.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR TITLE: OR Submittal:
General Distribution NOTES Standardized plant.
Standardized plant.
ENCL 0 STZE:
,S
/
05000528
.05000529 05000530 D
part of surveillance RECIPIENT ID CODE/NAME PD5 LA PETERSON,S.
INTERNAL: ACRS NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC/LFFILE 01 EXTERNAL: LPDR NSIC NOTES QPk
/LEAP COPIES LTTR E CL RECIPIENT ID CODE/NAME PD5 PD CHAN,T NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7 E NUDOCS-'ABSTRACT OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 D
R D
gLQ.P l s 4l l5 NOTE TO ALL"RIDS" RECIPIEWIS:
PLEASE HELP US TO REDUCE WASTETH CONTACT THE.DOCUMENI'OhHROLDESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENIS YOU DON'T NEEDI I3$
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
. ~
ENCL
/
A-D S
iQ C
p I's
<.1 6
tp
~ ',
>i f$>
~ i,.
~ II I
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX, ARIZONA850724999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAII 161-03026-WFC/GS March 26, 1990 Docket Nos.
STN 50-528/529/530 Document Control Desk U.
S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.
C.
20555
Reference:
ANPP Letter 161-01668-DBK/BJA Dated February 1,
1989
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2,
and 3
Quality Requirements for Meteorological Tower Equipment File:
90-A-056-026; 90-A-005-419.05 The referenced letter was submitted to transmit a proposed clarification to the meteorological tower equipment quality assurance program description contained in the Safety Analysis Report for Palo Verde.
The letter was submitted pursuant to 10 CFR 50.54(a)(3).
The clarification specified that meteorological system calibration is subject to the APS quality assurance program.
Other activities, as listed in the letter, will not be subject to the quality assurance program.
This is in accordance with Regulatory Guide 1.97, Revision 2 requirements which specify that Category 3 instrumentation (which includes the meteorological tower) be "high quality commercial grade," with no requirements for QA program controls.
The purpose of this letter is to confirm that meteorological system calibration is a part of the PVNGS Surveillance Test program as required by Technical Specification Section 4.3.3.4 and therefore, it is subject to the quality assurance program.
Since retests for corrective maintenance are also performed under the same surveillance requirement, they are indirectly covered under the quality assurance program as we'l.
If you have any further questions concerning this matter, please call Mr. A. C. Rogers of my staff at (602) 371-4041.
Sincerely, WFC/GS/tab cc:
T. L. Chan S.
R. Peterson J.
B. Martin D.
H.
Coe A. H. Gutterman 90041=0030 900326 PDR AGOCK 05000528 P
PDC L
+i gV/8 I
il
~0 a"
s a
j, L g