ML17305A490

From kanterella
Jump to navigation Jump to search
Forwards Rev to Section 3 of Cycle 3 Reload Analysis Rept. Rev Reflects Replacement of Eight New Fuel Assemblies
ML17305A490
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/25/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17305A491 List:
References
161-02812-WFC-A, 161-2812-WFC-A, NUDOCS 9002050369
Download: ML17305A490 (6)


Text

ACCELERATEDgDISTIUBUTION DEMOQ~TPWTION SYSH28 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9002050369 DOC.DATE: 90/01/25 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards rev to Section 3 of facility,Cycle 3 reload analysis, rept.

DISTRIBUTION CODE:

IE26D COPIES RECEIVED: LTR

( ENCL g SIZE:

TITLE: Startup Report/Refueling Report (per Tech Specs)

NOTES 05000528 RECIPIENT ID CODE/NAME PD5 LA CHAN,T COPIES LTTR ENCL 1

0 2

2'ECIPIENT ID CODE/NAME PD5 PD

'DAVIS,M.

COPIES LTTR ENCL 1

1 2

2 INTERNAL: ACRS CHA-REG FILE EXTERNAL: LPDR NSIC NOTES ON 0

5 5

1,1 1

1 1

1 1

1 1

1 IRM TECH ADV NUDOCS-ABSTRACT RGN5 FILE 01 NRC PDR 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 19

Arizona Public Service Company P.O. BOX 53999

~

PHOENIX, ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIOENT NUCLEAR 161-02812-WFC/ACR/KLMC January 25, 1990 Docket No.

STN 50-528 Document Control Desk U.

S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.

C.

20555

References:

1) 2)

3) 4)

5)

Letter to the NRC from D. B. Karner, ANPP, dated January 18, 1989;

Subject:

Reload Analysis Report for Unit 1, Cycle 3 (161-01620).

Letter to the NRC from D. B. Karner, ANPP, dated April 19, 1989;

Subject:

Reload Analysis Report for Unit 1, Cycle 3 (161-01858).

Letter to the NRC from W. F. Conway, APS, dated June 27, 1989;

Subject:

Revised Reload Analysis Report Change Pages

- Unit 1, Cycle 3 (161-02064)..

Letter to the NRC from W. F.

Conway, APS, dated August 25, 1989;

Subject:

Revised Section 7 of Reload Analysis Report for Unit 1, Cycle 3 (161-02219).

Letter to the NRC from W.

F.

Conway, APS, dated September 11, 1989;

Subject:

Revision to Section 8 of Reload Analysis Report for Unit 1, Cycle 3 (161-02294).

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Revision to Section 3 of Reload Analysis Report

- Unit 1, Cycle 3

File: 90-E-056-026 Attached is a revision to Section 3.0 of the Unit 1, Cycle 3 Reload Analysis

Report, which was originally transmi;tted in Reference 1.

The revised pages reflect the replacement of eight (8) new fuel assembli.es.

The replacement of these assemblies was required due to damage to a Cycle 3, new fuel assembly.

The replacement fuel assemblies are essentially identical to the original, Cycle 3 assemblies.

Applicable'ortions of the safety.analysis were re-performed, explicitly considering, the new replacement fuel assembly characteristics.

The safety analysis results remained bounded by those results reported in the Unit 1, 'Cycle 3 Reload Analysis Report (Reference

1) and subsequent revisions.

P002II~i0365'00125 pDR ADOCK 05000

<2:=:

p PDI"

il 0

~ '.

Document Control Desk U.

S. Nuclear Regulatory Commission Page 2

161-02812-WFC/ACR/KLMC January 25, 1990 Ifyou should have any questions concerning this matter, contact Mr. A. C. Rogers at (602) 340-4041.

Sincerely, WFC/ACR/KLMC Attachment cc:

T. L. Chan (all with Attachment)

ST R. Peterson J.

B. Martin D.

=

Coe