Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML17305B0681990-09-17017 September 1990 Forwards Response to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Exam Dates,Anticipated Number of Candidates & Requalification Exam Schedules for FY91-FY94 Also Encl ML17305B0491990-09-12012 September 1990 Forwards Palo Verde Nuclear Generating Station Unit 2 Steam Generator Eddy Current Exam,Second Refueling Outage Apr 1990. ML17305B0281990-08-27027 August 1990 Forwards fitness-for-duty Semiannual Performance Rept for Period of Jan-June 1990,per 10CFR26.71(d) ML17305B0111990-08-15015 August 1990 Responds to Request for Addl Info Re Emergency Lighting,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25. Availability Info Provided in Ref 2,most Appropriate Analysis of Lighting Sys Availability ML17305B0021990-08-0909 August 1990 Provides Update on Status of Record 546 post-restart Item, Per 900412 Ltr.Record Will Revise Procedures for Analyzing & Disseminating Incident Investigation,Operations & Maint Experience to Appropriate Dept ML17305A9871990-08-0303 August 1990 Forwards Rev 1 to Abb Impell Rept 01-1658-1815, Emergency Lighting Independent Review, Per Insp Repts 50-528/90-25, 50-529/90-25 & 50-530/90-25 ML17305A9791990-07-31031 July 1990 Forwards, Conceptual Design for Palo Verde Nuclear Generating Station for Diverse Auxiliary Feedwater Actuation Sys (Dafas) for Review.Schedule of Implementation as Indicated ML20056A4161990-07-31031 July 1990 Forwards Revised Security Plan Implementing Procedures.Encl Withheld (Ref 10CFR2.790) ML17305A9831990-07-27027 July 1990 Requests Temporary Waiver of Compliance from Limiting Condition for Operation 3.6.3 to Allow Corrective Maint to Be Performed on Main Feedwater Isolation Valves by Extending Allowed Outage Time to 12 H Instead of 4 H ML20055J2671990-07-25025 July 1990 Forwards Info Constituting Decommissioning Financial Assurance Certification Rept,Per 10CFR50.33(k)(2) & 50.75(b) ML17305A9771990-07-25025 July 1990 Forwards Status of Corrective Actions to Min Multiple Control Element Assembly Drop Events at Plant.Insp of Insulation Coils & Replacement of Defective Coils for Units 1 & 2 Completed ML20055J1711990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances for Plant,Per 10CFR50.75(b) & 50.33(k)(2) ML20055J1031990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances ML17305A9411990-07-20020 July 1990 Forwards Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. ML17305A9431990-07-17017 July 1990 Forwards Rev 1 to Palo Verde Nuclear Generating Station Annual Radiological Environ Operating Rept for 1987. Rev Results from Internal Review Bu Nuclear Safety Group & Audit Performed by Radiation Protection Stds ML17305A9601990-07-13013 July 1990 Forwards Preliminary Response Re Justification for Continued Operation of Fire Protection Sys Equipment,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25 ML17305A9331990-07-12012 July 1990 Discusses Util Compliance w/fitness-for-duty Program Implementation.Lab Specialists,Inc Audited & Monitored W/ Satisfactory Results.Ltr of Agreement Has Been in Place Since 900202 ML17305A9391990-07-0909 July 1990 Forwards Endorsement 44 to Maelu Policy MF-116 & Endorsement 62 to Nelia Policy NF-266 ML17305A9341990-07-0909 July 1990 Submits Results of 900514-18 NUREG-1220 Audit,Per NRC 900608 Request,Per Insp of Plant.Remaining Licensed Operators Found to Be in Conformance W/Medical Exam Requirements of 10CFR50.55 ML17305A9151990-06-29029 June 1990 Forwards Emergency Lighting Failure Data Update,Per 900621 Request ML17305A9061990-06-26026 June 1990 Suppls 891114 Response to Violations Noted in Insp Rept 50-528/89-16.Application for Amend to License NPF-41 Will Be Submitted in Oct 1990 to Permit Lower Flow Rate for RCS & Shutdown Cooling Sys ML17305A9111990-06-25025 June 1990 Responds to Generic Ltr 90-04, Status of Implementation of Generic Safety Issues. ML17305A9081990-06-25025 June 1990 Forwards Schedule Reiterating Util Plans for Implementation of USIs A-9 & A-44 & Provides Current Forecast Refuel Dates ML17305A9051990-06-25025 June 1990 Forwards Endorsement 45 to Maelu Policy MF-116 & Endorsement 63 to Nelia Policy NF-266 ML17305A9121990-06-24024 June 1990 Forwards Discharge Test Voltage Curve,Per 900623 Request for Completion of Emergency Lighting Exide Power Supply Prior to Entry Into Mode 2 ML17305A9171990-06-24024 June 1990 Confirms Compliance W/Agreed Upon Course of Action for Restart of Facility as Outlined in 891224 Ltr & Completion of Items Contained in Restart List Provided as Attachment to 900111 Ltr ML17305A8961990-06-20020 June 1990 Responds to NRC 900521 Ltr Re Violations Noted in Insp Repts 50-528/90-12,50-529/90-12 & 50-530/90-12.Corrective Action: Wiring in PPS Cabinets & Cabinet Drawers Reworked in Accordance W/Approved Work Authorization Documents IR 05000528/19900021990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite ML17305A9041990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite ML17305A8891990-06-15015 June 1990 Informs NRC That post-restart Items Due Prior to Scheduled Restart Have Been Completed on Schedule W/Listed Exceptions ML17305A8871990-06-14014 June 1990 Advises That Fuel Pool Cooling & Cleanup Procedures Being Restructured,Per Response to Violations in Insp Repts 50-528/89-36 & 50-530/89-36 ML17305A8731990-06-0808 June 1990 Responds to Bulletin 88-005 Re Product Forms Other than Fittings & Flanges for Plant.Significant Number of Lugs Delivered to Plant.Util Should Be Notified,If NRC Previous Review of Records Has Identified Other Product Forms ML17305A9421990-06-0101 June 1990 Forwards Pinnacle West Response to State of Az Corp Commission Complaint Filed W/Us Securities & Exchange Commission on 900521,to Revoke Exemption from Public Utils Holding Co Act ML17305A8661990-05-31031 May 1990 Forwards Projected 1990 Cash Flow Statements ML17305A8391990-05-31031 May 1990 Forwards 1990 Reactor Containment Bldg Integrated Leak Rate Test,Final Rept. ML17305A8571990-05-31031 May 1990 Forwards Amended Pages of Feb,Mar & Apr 1990 Monthly Operating Repts for Palo Verde Nuclear Generating Station Unit 2 ML17305A8201990-05-23023 May 1990 Provides Status of Improvements to Eliminate Possibility of Multiple Control Element Assembly Drop Events.Licensee Developed Mod to Ground Fault Detection Sys to Assure Continuous Monitoring & Annunciation of Any Future Faults ML20043B6421990-05-19019 May 1990 Forwards Amend 26 to Security Plan.Amend Withheld (Ref 10CFR2.790(d) & 10CFR73.21) ML17305A7841990-05-15015 May 1990 Forwards Special Rept 2-SR-90-002 Re Steam Generator Tube Plugging Due to Inservice Insp Activities.Twenty Tubes Plugged in Steam Generator 1 & ninety-one Tubes Plugged in Steam Generator 2 ML17305A8721990-05-14014 May 1990 Forwards Arizona Corp Commission Complaint Filed W/Us Securities & Exchange Commission Seeking Revocation or Mod of Exemption of Pinnacle West Capital Corp.Complaint Wholly W/O Merit ML17305A7621990-05-11011 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Repts 50-528/90-03,50-529/90-03 & 50-530/90-03.Corrective Actions: Night Order Written for Guidance on Use of Instrumentation W/Maint Tag Present ML17305A7921990-05-0808 May 1990 Forwards Public Version of Rev 2 to EPIP-14, Dose Assessment. W/900523 Release Memo ML20043A0511990-05-0303 May 1990 Forwards Public Version of Revised Epips,Including Procedure Change Notice 11 to Rev 12 to EPIP-04 & Procedure Change Notice 1 to Rev 6 to EPIP-15 ML17305A7421990-05-0303 May 1990 Responds to 900330 Enforcement Conference Re Violations Noted in Insp Repts 50-528/90-04,50-529/90-13 & 50-530/90-13.Corrective Action:Special Locking Mechanisms Installed on Currently Posted Radiation Area Doors & Gates ML17305A8861990-04-30030 April 1990 Forwards EPIP Update,Including Rev 7 to EPIP 02,Rev 12 to EPIP 03 & Rev 9 to EPIP 20.W/o Encl ML17305A7381990-04-30030 April 1990 Forwards Annual Environ Operating Rept for 1989 & Annual Rept for Salt Deposition Monitoring Program 1989. ML17305A7131990-04-20020 April 1990 Responds to NRC 900321 Ltr Re Violations Noted in Insp Rept 50-530/90-08.Corrective Action:Plant Guideline Providing Addl Guidance Re Prioritization of Work Promulgated ML17305A6891990-04-16016 April 1990 Forwards Rev to Cycle 3 Reload Analysis Rept,Submitted 891024.Rev Reflects Early end-of-cycle Unit Shutdown & Replacement of Eight New Fuel Assemblies ML17305A7011990-04-12012 April 1990 Forwards Rev 3 to Palo Verde Nuclear Generating Station Post-Restart Actions, Per JB Martin 891224 Ltr ML17305A7081990-04-0909 April 1990 Forwards post-exam Security Agreements for Dk Hendrick, D Ensign,M Alavi & Author.Agreement Certifies That Signatories Will Not Divulge Info Re 900320 Exams 1990-09-17
[Table view] |
Text
gCCE~RATED DRKBUTION DEMO4S1%TION SYSTEM REGUIATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9001190405 DOC.DATE: 89/12/27 NOTARIZED: YES DOCKET I FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAYPW.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECZP.NAME RECIPIENT AFFILIATION
, Document Control Branch (Document Control Desk)
SUBJECT:
Forwards final response to NRC Bulletin 88-010 a Suppl 1, "Nonconforming Molded-Case Circuit Breakers."
DISTRIBUTION CODE: IE21D COPIES RECEIVED:LTR g ENCL /
TITLE: Bulletin Response 88-10 Nonconforming Molded Case Circuit SIZE:
Breakers.
NOTES: 05000528 Standardized plant. 05000529 g Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COP1ES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 1 1 CHANPT 1 1 DAVIS,M. 1 1 PETERSONPS. 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR DOEA/GCB 11 1 1 NRR GILLPA.S. 1 1 NRR GUILLENgJ 1 1 NRR POTAPOUSPU 1 1 NRR STONE,J.C. 1 1 NRR/DET/EMEB9H3 1 1 NRR/DOEA/OEAB11 1 1 NRR/DOEA/OGCB11 1 1 NRR/DREP/PEPB9D 1 1 NRR/DST 8E2 1 1 ILRB12 1 1 .NUDOCS-ABSTRACT 1 1
- 6 FILE 02 1 1 RES/DSIR/EIB 1 1 RGN5 LE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSZC 1 1 NOTES: 1 1 D
NAZE Zl3 ALL 'RIES" RECIPIENTS:
PLEASE HELP US IO KKQCB HASTE! CORIACT THE DOCUMEÃZ CXKZROL DESK, RGB Pl-37 (EXT. 20079) KO ELXHXKQR YOOR MME HKH DISTBZBUTZCII LISTS FOR DCCUMEHIS KXJ DGHPT NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 25
Arizona Public Service Company P.O. 8OX 53999 ~ PHOENIX. ARIZONA 85072-3999 WILLIAMF. CONWAY 161-02724-WFC/JMQ EXECUTIVEVICE PRESIDENT NUCLEAR December 27, 1989 Docket Nos. STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D. C. 20555
References:
(1) Letter from NRC to all Holders of Operating Licenses or Construction Permits for Nuclear Power Reactors dated November 22, 1988.
Subject:
NRC Bulletin 88-10, "Nonconforming Molded-Case Circuit Breakers (2) Letter from D. B. Karner, APS, (161-01808), to NRC dated March 30, 1989.
Subject:
Response to NRC Bulletin 88-10, "Nonconforming Molded-Case Circuit Breakers (3) Letter from NRC to NUMARC dated February 17, 1989.
Subject:
NRC Comments on NUMARC's Draft Clarification of NRC Bulletin 88-10 (4) Letter from NRC to all Holders of Operating Licenses or Construction Permits for Nuclear Power Reactors dated August 3, 1989.
Subject:
NRC Bulletin 88-10, "Supplement 1 Nonconforming Molded-Case Circuit Breakers"
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Response to NRC Bulletin 88-10 and Supplement 1, Nonconforming Molded Case Circuit Breakers File: 89-056-026 Attached is the PVNGS final response to NRC Bulletin 88-10.
If you have any questions on this matter, please call Mr. A. C. Rogers of my staff at (602) 340-4041.
Sincerely, 9001190405 S91227 PDR ADOCK 05000528 8 PNU
t II
Document Control Desk 161-02724-WFC/JMQ U. S. Nuclear Regulatory Commission December 27, 1989 Page 2 WFC/JMQ/jle Attachment CC'. B. Martin (all w/attachment)
M. J. Davis T. L. Chan T J Polich
~ 0 G. W. Knighton A. C. Gehr A. H. Gutterman
It H
I/
161-02724-WFC/JMg December 27, 1989 STATE OF ARIZONA )
) SS ~
COUNTY OF HARICOPA )
I, Vi. F. Conway, represent that I am Executive Vice President Nuclear, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true and correct.
W. F Conwa Sworn to before me this day of IQ~ ~,<~ iaaf, 1989.
Notary Public Hy Commission Expires:
Mf CQwMgg QPjgg Jggg 5 1ggy
I I
l
Res onse to NRC Bulletin 88-10 and Su lement 1:
Nonconformin Molded-Case Circuit Breakers The following summarizes the actions taken by APS for each of the Bulletin's "Actions Requested," Item Nos. (AI) 1 thru 8 of Bulletin 88-10.
1-Per this requested action item, the Molded Case Circuit Breakers (MCCBs) stored in the PVNGS warehouse, classified for use or potential use in safety related applications, were identified. The total number of CBs identified was 1309, thus exceeding the required minimum sample of 50 CBs. As a result, no installed CBs were required to be removed from the plant safety related systems to form the 50 CB minimum required sample. The traceability and/or acceptance status, as defined within the context of the Bulletin, was verified for 1240 CBs of the 1309 CBs identified. Of the 1240 CBs, 159 were received prior to August, 1983. This effort resulted in the traceability/acceptance of 94.73% of the CB (i.e., 1240) and the rejection of 5.27% of the CBs (i.e., 69).
Attachment 1 includes a complete listing of the non-traceable CBs with all the associated information (i.e., manufacturer, model number and the procurement chain when available).
2-This requested action item is considered not applicable to PVNGS since no installed CBs were recovered per AI 1. In addition, a justification for continued operation will not be required for the case of the non-traceable CB described in the response to AI 5 below.
'This CB was discovered during the current Unit 1 outage and will be removed prior to the start-up of the Unit 1.
3-Based on the 80% or more CB traceability to the Circuit Breaker Manufacturer (CBM),
this action item requires testing of the non-traceable CBs per the test criteria as set forth in the Bulletin. Per Reference 3 (paragraphs 4 and 5), the NRC intent for the testing of non-traceable CBs is to demonstrate the proper operability of these CBs in the case where proper replacements are not readily available. It is stated, however, that "The Staff will not require utilities to test stored non-traceable MCCBs but will require, in lieu of testing, all non-traceable breakers be considered failed within the context of the Bulletin." As a result, APS has opted not to perform any testing on the non-traceable CBs identified in the response to AI 1, but rather to remove the identified non-traceable CBs from PVNGS warehouse stock. In addition, per the stated NUMARC recommendation, APS will also quarantine the non-traceable CBs for the requested one year period.
4-This requested action item requires that if more than 10% of the non-traceable CBs fail the proposed Bulletin's tests, all molded-case CBs purchased between August 1, 1983 and August 1, 1988, be identified, traceability verified and all associated information identified (i.e., model number, manufacturer, installation application and procurement chain). In lieu of testing, PVNGS has considered that all non-traceable CBs failed the Bulletin's required tests.
PAGE 1'
I In response to this item, reference is again being made to the Staff's clarifications of Bulletin 88-10 (Reference 3). Per paragraph 4, "...Given the existing language of Bulletin 88-10, this requires utilities with even a small percentage of non-traceable breakers to proceed with AIs 4 and 5. The Staff will, on a case by case basis only, consider the circumstances of individual utilities with a very small number of non-traceable MCCBs.
Provided all non-traceable MCCBs can be accounted for and the circumstances contributing to the non-traceable stock do not suggest repeatable programmatic breakdowns of the utility procurement practices, the staff may relieve utilities from AI's 4 and 5 and instead requires only the removal from stock of the non-traceable MCCBs...."
Based on the above provision, APS has met the intent of this action item, based on the following justification and other actions taken in support of Bulletin 88-10 and Supplement 1:
a) The high percentage of traceable/acceptable CBs (i.e., 95%) stored in for safety related (SR) service totaling 1240 CBs, reflects a very high PVNGS'arehouse, confidence factor in the procurement, storage and application programs of safety related (SR) CBs at PVNGS.
b) APS assessed and accounted for the installed CBs, that were procured under non-traceable purchase orders, identified as a result of the PVNGS warehouse inspections (see AI 5).
c) The 5% (69) non-traceable CBs are divided into two categories; MRS (Material Returned to Stores) rejects (21 CBs) and supplier rejects (48 CBs).
The MRS CBs were returned to the warehouse stock, after being tested for acceptability per PVNGS test procedures, either from PVNGS original plant equipment or after being released from the warehouse for the plant's use.
Documentation relating the MRS CBs to a particular purchase order does not exist, thus deeming these CBs as non-traceable per the guidelines of Bulletin 88-10.
Forty two of the non-traceable CBs from the supplier rejects category were procured from three of PVNGS'ajor equipment suppliers of safety related equipment:
Combustion Engineering (CE, the NSSS supplier), Cooper (Safety Related Diesel Generator supplier) and Elgar (Inverter supplier). All of the non-traceable CBs were procured as class IE SR from an approved PVNGS vendor and with a certificate of compliance. The other six CBs that belong to the supplier rejects category were procured from a local distributor (J. E. Redmond) thru a regional distributor (MAG-TROL). Although both vendors produced traceability and procurement records for only selling new and factory originated CBs, their records were not kept for more than Gve years. Due to the procurement date of the six CBs (August, 1983) these CBs were deemed non-traceable, since no traceability documentation was found.
PAGE 2
The described circumstances and non-traceability cases definitely do not suggest repeatable programmatic breakdowns of PVNGS procurement practices. As stated earlier and during the performance of AI 1, it was clearly identified that a great majority of the CBs were traceable to the CBM.
d) As indicated in Reference 2, during the five years covering August 1, 1983, through August 1, 1988, there were only four Engineering Change Evaluations (ECEs) for commercial grade dedication of molded-case circuit breakers. In all of the four identified cases the molded-case CBs were traced back to the CBM. There was another commercial grade dedication case, however, that identified non-automatic type CBs, classified as molded-case switches which did not contain any overcurrent trip mechanisms. These switches were determined to be non-traceable and, although were not considered to be within the scope of the Bulletin, were addressed immediately upon discovery and replaced in all PVNGS'nits per PNVGS internal procedures, regulatory and reportability requirements.
5-This requested action requires the replacement of all non-traceable molded-case CBs installed in safety related systems with CBs that meet the traceability criteria of Bulletin 88-10. As a result of this action item, PVNGS has identified only two cases of non-traceable molded-case CBs, resultant from the warehouse inspections. In one case, two CBs, although classified for safety related applications, were issued for use in a non-safety related application as part of a PVNGS temporary modification. In the second case, two CBs were issued for use in a safety related application in Unit 1. As a result, a PVNGS work order has been issued to replace the installed CB during the current PVNGS Unit 1 outage. All the other non-traceable molded-case CBs, part of the purchase orders listed in Attachment 1, are accounted for and currently quarantined in the PVNGS warehouse, as previously indicated in the response to AI 1 above. This response also meets the NRC position "4" requirements of Bulletin 88-10, Supple-ment 1.
6-This requested action requires the documentation and maintenance of the generated information while performing the required actions for Bulletin 88-10 for a period of five years, As requested, PVNGS will be maintaining all the generated documentation in an auditable form.
7-This requested action requires that molded-case CBs installed after August 1, 1988, be procured and dedicated per the Bulletin's stated criteria. As a result of this requested action, PNVGS procurement and dedication practices for molded-case CBs are being revised to meet or exceed the criteria delineated in Bulletin 88-10 (delineated in Section 4 of the attached report). In addition, per the response to AI 5 above, non-traceable molded-case CBs were identified and replaced.
PAGE 3
I l
8-This requested action item is for addressees who cannot meet the schedule for responding to the Bulletin by April 1, 1989, to provide and justify to the NRC their proposed alternative schedule. As a result, per Reference 2, APS requested an extension for submitting the final Bulletin's response by December 31, 1989.
Based on the above actions taken, the intent and requirements of NRC Bulletin 88-10 and Supplement 1 have been met. Per Bulletin 88-10 and Supplement 1 reporting requirements, APS confirms that only molded-case CBs that meet the requirements of AI 7 above, are being maintained as stored spares for future use in safety related applications.
In addition, the information pertaining to the non-traceable CBs is being provided as part of the Attachment 1. APS also confirms that items 1 thru 7 of the Bulletin's requested actions have been satisfactorily addressed and/or completed.
PAGE 4
1' ATTACHMENT 1 NRC BULLETIN 88-10 SAFETY RELATED MOLDED CASE CIRCUIT BREAKERS NON-TRACEABLE REJECTION
SUMMARY
Purchase Order/
Glass/ Material ANPP Item Receiving PKG¹ 4441- STY gauss t DESCRIPTION REJECTION BASIS 086 9 5 60117307/ AM2-A3A-10-2 C-E could not provide 861006895 HEINEMANN traceability to the CBM No S/N* (Reference C-E Letter Ext 89-144, dated 09/01/89) 004C 11 1 MRS23709 THED126015 Material returned from GE 15A, 2POLE unit and returned to stock.
S/N N3709000046 Traceability to purchase order could not be esta-blished.
004C 11 1 MRS24548 THED126015 Unable to locate MRS copy.
GE 15A, 2POLE S/N N3709000005 050 11 1 MRS18347 THED126015 Material returned from GE 15A, 2POLE unit and returned to stock.
S/N N4609100004 Traceablity to purchase order could not be esta-blished.
021 14 1 F174639/ AM2-A3A-15-2 C-E could not provide 206948 HEINEMANN traceability to the CBM (For QSPD System) (reference C-E Letter No S/N Ext-89-144, dated 09/01/89) 008 14 1 13NM001A/ AM2-A3A-15-2 C-E could not provide 177470 HEINEMANN traceability to the CBM (for QSPD System) (reference C-E letter No S/N Ext-89-144, dated 09/Ol/89) 077 14 4 60110023/ AM2-A3A-15-2 C-E could not provide 860814432 ,HEINEMANN traceability to the CBM (for QSPD System) (reference C-E letter No S/N Ext-89-144, dated (09/01/89)
1 Purchase Order/
Class/ Materia1 ANPP Item Requiring PKG¹ '441- QTY Receuest DESCRIPTION REJECTION BASIS 050 34 2 MRS18347 THED126090 Material returned from GE 90A, 2POLE unit and returned to stock.
S/N's Traceability to purchase N6762390048 order could not be esta-N6762390052 blished.
069 71 4 33700299/ THJK426FOOO Elgar's supplier GESCO 860776212 GE cannot supply traceability No S/N to GE (Reference Elgar letter dated 10/18/89) 067 71 6 33700255/ THJK426FOOO Elgar's supplier GESCO 85047745 GE cannot supply traceability No S/N to GE (Reference Elgar letter dated 10/18/89) 053 123 2 NO PO CD2-A3-DU Breaker stored without HEINEMANN traceability to a PO or 15A, 240VAC MRS.
No S/N 101 123 3 60140015/ CD2-A3-DU C-E could not provide 871201038 HEINEMANN traceability to the CBM No S/N (reference C-E letter Ext-89-144, Dated 09/Ol/89) 013 123 1 F169196/ CD2-A3-DU C-E could not provide 205405 HEINEMANN traceability to the CBM No S/N (Reference C-E letter Ext-89-144, dated 09/Ol/89) 041 140 1 F180818/ 2-01E-028-038 Cooper could not provide 218328 HEINEMANN traceability to the CBM S/N 8612-2 027 141 1 F176575/ TED124070 Source Surveillance (Cooper) 204135 GE 70A, 2POLE - unable to establish S/N 128770 traceability to the CBM.
(Reference letter 028-01814 WPP/MDF) 028 141 1 F176577/ 2-01E-028-030 Source Surveillance (Cooper) 204135 GE 70A, 2POLE unable to establish S/N 128771 traceability to t:he CBM.
(Reference letter 028-01814 WPP/MDF)
fl I
Purchase Order Class/ Material/
ANPP Item Requiring PKG¹ 4441- QTY Roue et DESCRIPTION REJECTION BASIS 049 141 1 MRS18315 TED124070 Material returned from unit GE 70A, 2POLE and returned to stock.
No S/N Traceability to purchase order could not be esta-blished.
027 142 1 F176575/ 2-01E-028-026 Source surveillance (Cooper) 208809 HEINEMANN unable to establish 5A, 1POLE traceability to the CBM.
No S/N (Reference letter 028-01814 WPP/MDF) 028 142 1 F176577/ 2-01E-028-026 Source surveillance (Cooper) 205422 HEINEMANN unable to establish 5A, 1POLE traceability to the CBM.
No S/N (Reference letter 028-01814 WPP/MDF) 028 143 1 F176577/ 2-01E-028-017 Source surveillance (Cooper) 204134 HEINEMANN unable to establish 1163A traceability to the CBM.
No S/N (Reference letter 028-01814
- WPP/MDF) 097 143 6 60133325/ 2-01E-028-017 Source surveillance (Cooper) 861018400 HEINEMANN unable to establish 1163A traceability to the CBM.
(Reference letter 028-01814
'o S/N
- WPP/MDF) 027 143 1 F176575/ 2-01E-028-017 Source surveillance (Cooper) 204135 HEINEMANN unable to establish 1163A traceability to the CBM.
No S/N (Reference letter 028-01814 WPP/MDF) 050 240 1 MRS18347 THED113CB020 Material returned from unit GE 20A, 1POLE and returned to stock.
S/N N4651300010 Traceability to purchase order could not be esta-blished.
046 260 1 MRS18303 THED136015N Material returned from unit GE 15A, 1POLE and returned to stock.
S/N N780T280003 Traceability to purchase order could not be esta-blished.
II I
J Il
Purchase Order/
Class/ Material ANPP Item Requiring PKG¹ 4441- QTY ~Re eeet DESCRIPTION REJECTION BASIS 100 484 3 60139040/ N852-103-08 Elgar's supplier GESCO 871162288 GE cannot supply traceability No S/N to GE (Reference Elgar letter dated 10/18/89) 054 564 3 33400041/ TEC36015S J. E. Redmond's supplier, 830229361 GE 15A, 3POLE Magtrol unable to provide No S/N traceability to the CBM.
Both suppliers maintain their PO records for a period of 5 years; PO was issued in 1983.=
054 568 3 33400041/ TEC36050S J. E. Redmond's supplier, 830229361 GE 50A, 3POLE Magtrol unable to provide No S/N traceability to the CBM.
Both suppliers maintain their PO records for a period of 5 years; PO was issued in 1983.
051 576 1 MRS23745 THED136050 Material returned from unit GE 50A, 3POLE and returned to stock.
No S/N Traceabili.ty to purchase order could not be esta-blished.
052 576 1 MRS24625 THED136050 Material returned from unit GE 50A, 3POLE and returned to stock.
S/N N890T410007 Traceability to purchase order could not be esta-blished.
046 576 1 MRS18303 THED136050 Material returned from unit GE 50A, 3POLE and returned to stock.
No S/N Traceability to purchase order could not be esta-blished.
048 577 2 MRS18314 THED136070 Material returned from unit GE 70AI 3POLE and returned to stock.
QTY 1 No S/N Traceabili.ty to purchase S/N N1095970010 order could not be esta-blished.
t Purchase Order/
Class/ Material ANPP Item Requiring PKG¹ 4441- QTY ~Re eeet DESCRIPTION REJECTION BASIS 006 600 1 13MM018/ 55519 ITEM 9 Source surveillance (Cooper) 191962 WESTINGHOUSE unable to establish EB1015 traceability to the CBM.
No S/N (Reference letter 028-01814 WPP/MDF) 002A 604 2 MRS18311 THFK236070 Unable to locate MRS copy GE 70A, 3POLE No S/N 006 615 1 MRS18303 THED136070N Material returned from unit GE 70A, 3POLE and returned to stock.
S/N N890T410016 Traceability to purchase order could not be esta-blished.
047 616 3 MRS18310 THFK236125 Material returned from unit GE 125A, 3POLE and returned to stock.
Qty 1 No S/N Traceability to purchase order could not be esta-blished.