ML17305A261
| ML17305A261 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/19/1989 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17305A262 | List: |
| References | |
| NUDOCS 8910040041 | |
| Download: ML17305A261 (18) | |
Text
gP8 REMI
~
v' 0
~ L
<< lg P
0 40 Y/+~
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ARIZONA PUBLIC SERVICE COMPANY ET AL.
DOCKET NO.
STN 50-528 PALO VERDE NUCLEAR GENERATING STATION UNIT NO. I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
44 License No.
NPF-41 1.
The Nuclear Regulatory Commission (the ComIission) has found that:
A.
The application for amendment, dated January 12, 1989 by the Arizona Public Service Company (APS) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison
- Company, Public Service Company of New Mexico, Los Angeles Department of Water and
- Power, and Southern California Public Power Authority ( licensees),
complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of Act, and the regulations of the ComIission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-41 is hereby amended to read as follows:
'p 00400'~
PDR ADPC~ 085'Owly 000S28 PDC y
a
~ I
~
a i
)
I.'r S II 3)i.
n)I
\\
a
~ \\a
~
~
I
,ra
~
raI, ! J.
I
.a "11
~ a I
~
ai I <<C a
a a
I'
~
I ~
))- if..
r
'I ~ f r
~ ~
~
a Ii l','
aa I I'f
'I
~
~
= ~
lv I
r I
~ aa"
' 'r a
a
) I' I
j a
a r a ~
~ ~I aa I
aa7 Ia I
f <<
I
) b)17 I
~ "a)
I al 'aIJ I
r C n
~ I ~
I a
)
) ~ J ~
a 01 v
JI
)a JaI a)>>
a Jl:I I I I!
J
>> f a)r' allOv c;'I
= fa) I I...l a ~
I I I
g
~
'a C
~
J CI
~
=-
a a'a,.'~
I>>
I
.J,
~
.') I ~'I~ 'Iaaaa a a)I a I)r 2,) "i
~
I a
)
I.
~ aaa: 'II
,s (2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 44, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the faci lity in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION George W
Knighton - irector Project Directorate V
Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
Changes to the Technical Specifications Date of Issuance:
September 19, 1989
I ~
I ~ t t 11.
'h v AI
~
I
~,wt
~
~
ENCLOSURE TO LICENSE AMENDMENT AMENDMENT NO.
44 TO FACILITY OPERATING LICENSE NO.
NPF-41 DOCKET NO.
STN 50-528 S
Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change.
Also to be replaced are the following overleaf pages to the amended pages.
Amendment Pa es 3/4 1-2a 3/4 1-17 3/4 1-18 3/4 1-20 3/4 1-31 3/4 1-32 3/4 2-4a 3/4 2-7 3/4 2-7a Overleaf Pa es 3/4 1-19
I I
y
~
I kt I
t "j
sr I,
(500, 6.5) 5 hC bC LU 4
z IX 2
3 OQ I
x M
REGION OF ACCEPTABLE OPERATION (350, 4.0)
REGION OF UNACCEPTABLE OPERATION 100 200 300 400 500 600 COLD LEG TEMPERATURE t F)
FIGURE 3.4-1A SHUTDOWN MARGIN vs. COLD LEG TEMPERATURE PALO VERDE - UNIT 1
3/4 1-2a AMENDMENT NO.
44
I t
t t
TABLE 3.1-2 RE UIRED MONITORING PRE UENCIES FOR BACKUP BORON DILUTION DETECTION AS A FUNCTION OF OPERA ING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR 0.98 )
K ff ) 0.97 OPERATIONAL MODE Number of 0 eratin Char in Pum s
0 1
4 not on SCS 5 not on SCS 4 8 5 on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 2.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 8 hours 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 8 hours 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1 hour 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ONA ONA 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA-Notes:
SCS = Shutdown Cooling System ONA = Operation not allowed PALO VERDE - UNIT 1 3/4 1-17 AMENDMENT NO. 44
TABLE 3.1-3 RE UIRED MONITORING FRE UENCIES FOR BACKUP BORON DILUTION DE ECT ON AS UNC ON OF OPERA ING CHARGING PU PS AN LANT 0 ONAL MOD S FO
.9
)
K ff )
6 eff OPERATIONAL MODE Number of 0 eratin Char in Pum s
0 1
2 3
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
- 3. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
- 1. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
- 0. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 not on SCS 5 not on SCS 4 8 5 on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 8 hours 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1 hour 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ONA Notes:
SCS = Shutdown Cooling System ONA = Operation not allowed PALO VERDE - UNIT 1 3l4 1"18 AMENDMENT N0.44
TABLE 3.1-4 RE UIRED MONITORING FRE UENCIES FOR BACKUP BORON DILUTION DETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR 0. 96 K ff > 0. 95 OPERATIONAL MODE Number of 0 eratin Char in Pum s
0 1
4 not on SCS 5 not on SCS 4
8 5 on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 5 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 5 hours 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 5 hours 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 2 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1 hour 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1 hour ONA Notes:
SCS = Shutdown Cooling System ONA = Operation not allowed PALO VERDE - UNIT 1 3/4 1-19 AMENDMENT NQ. 23
TABLE 3.1-5 RE UIRED MONITORING FRE UENCIES FOR BACKUP BORON DILUTION DE ECT ON AS UNC ION 0
R NG CHARGING PU S
AND PLANT 'OP RAT ONAL MODES OR ff ( 0.9 V
OPERATIONAL MODE Number of 0 eratin Char in Pum s
0 1
4 not on SCS 5 not on SCS 4
8 5 on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 6 hours 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2 hours 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 8 hours 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 3 hours 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />
- 1. hour 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 2 hours Note:
SCS = Shutdown Cooling System PALO VERDE - UNIT 1 3/4 1-20 AMENDMENT NO. 44
I CD Kl CD m
1.0 FIGURE 3.1-3 CEA INSERTION LIMITS vs. THERMAL POWER (COLSS IN SERVICE) 0.9 0.8 K
LLl 0.7 X
0.6 KI-Q 0.5 I
CC 0
0.4 X0 0.3 IX KI or~
0 mi P-Nl<
K (g 0
0 I
TRANSIENT INSERTION LIMIT CD m
CD 0.2 0.1 0.0 150 BANK 5 120 90 60 30 O
O.
0 U
BANK 3 BANK 1 0
150 120 90 60 30 0
150 120 90 60 30 0
BANK 4 BANK 2 150 120 90 60 30 0
150 120 90 60 30 0
CEA WITHDRAWAL(INCHES)'
m C7m 1.00 FIGURE 3.1-4 CEA INSERTION LIMITS vs. THERMAL POWER (COLSS OUT OF SERVICE) 0.90 0.80 0
0.70 0.60 I
0.50 V
0.40 0
à O
0.30 O
a 0.20
~l-Og LU~
X TRANSIENT INSERTION LIMIT 0.10 0.00 BANK 5 150 120 90 60 30 BANK 3 0
150 120 90 60 30
. 0 BANK 1 150 120 90 60 30 0
BANK 4 BANK 2 150 12Q 90 60 30 0
150 12Q 90 60 30 0
CEA WITHDRAWAL(INCHES)
100 90 80 70 X
6o l~
IX 50 x
40 N~
3O REGION OF UNACCEPTABLE OPERATION 20 10 20 30 40 REGION OF ACCEPTABLE OPERATION 50 60 70 PERCENT OF RATED THERMAL POWER 80 90 100 FIGURE 3.2-1A AZIMUTHALPOWER TILT LIMITvs. THERMAL POWER (COLSS IN SERVICE)
PALO VERDE - UNIT 1
3/4 2-4a AMENDMENT NO. 44
2.5 COLSS OUT OF SERVICE DNBR LIMITLINE 2.4 ACCEPTABLE OPERATION 2.3 MINIMUM1 CEAC OPERABLE K
Cl 2.2 Q
g2 2.1 V
(-0.2, 2.15)
(0.2, 2,15) 2.0 UNACCEPTABLE OPERATION 1.9 1.8-0,3
-0.2
-0.1 0.0 0.1 0.2 0.3 CORE AVERAGE ASI FIGURE 3.2-2 DNBR MARGIN OPERATING LIMITBASEO ON CORE PROTECTION CALCULATORS (COLSS OUT OF SERVICE, CEAC'S OPERABLE)
PALO VERDE - UNIT 1 3/4 2-7 AMENDMENT NO.
44
2.5 COLSS OUT OF SERVICE DNBR LIMITLINE 2.4 ACCEPTABLE OPERATION CEAC'S INOPERABLE (0.051 2.40)
(0.2, 2.40) 2.3 KD 202 K
O 0V 2.1
(-0.2, 2.20)
UNACCEPTABLE OPERATION 2.0 1.9-0.3
-0.2
-0.1 0.0 0.1 0.2 0.3 CORE AVERAGE ASI FIGURE 3.2-2a DNBR MARGIN OPERATING LIMITBASED ON CORE PROTECTION CALCULATORS (COLSS OUT OF SERVICE, CEAC'S INOPERABLE)
PALO VERDE - UNIT 1
'/4 2>>7a AMENDMENT NO. 44