Provides Status Update of Nonconformance Rept Program Implementation,Per Insp Repts 50-528/89-18,50-529/89-18 & 50-530/89-18.Lead Director Approval for Nonconformance Rept Program Obtained on 890801 W/Implementation Date of 891001
ML17304B437
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/05/1989
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-01399-WFC, 102-1399-WFC, NUDOCS 8909130131
Download: ML17304B437 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8909130131 DOC.DATE: 89/09/05 NOTARIZED: NO DOCKET 4s FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1; Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529'STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F. 'rizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides status update of nonconformance rept program implementation,per IRs 50-528,50-529

& 50-530/89-18.

DISTRIBUTION CODE:

ZE01D COPIES RECEIVED:LTR ENCL tz SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Standardized plant.

Standardized plant.

RECIPIENT ID CODE/NAME PD5 PD DAVIS,M.

INTERNAL: ACRS AEOD/DEIIB

" DEDRO NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB 10 NRR/PMAS/ILRB12

~I RMAN,J 02 RGN5 FILE 01 EXTERNAL: LPDR NSIC NOTES:

COPIES LTTR ENCL 1

1, 1

1 1

1 RECIPIENT ID CODE/NAME CHAN,T AEOD AEOD/TPAD LOIS,ERASMIA NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D NRC PDR COPIES LTTR ENC+

1 1

1 05000528 05000529 05000530 D

D '/

Q I(

]

D 8:

h NOXE TO ALL KIDS PLEASE HELP US 'IO RECCE RASTE.'XNZKCT 'IHE DOCUMEÃZ CGNGRL DESK, RXN Pl-37 (EXT. 20079)

%0 EliZMZNATE KSR NAME HKN DISTRIBUTICH LISTS MR DOCXRKHIS VXJ DON'T NEZDf OTAL NUMBER OF COPIES REQUIRED:

LTTR 28 ENCL

~

~

WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAII Arizona Public Service Company P.O. BOX 53999

~

PHOENIX. ARIZONA85072-3999 102-01399-WFC/TDS September 5,

1989 t

U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Letter from W. F. Conway to U. S. Nuclear Regulatory Commission (102-01289-WFC/TDS/JJN) dated June 5,

1989

Dear Sirs:

Subj ect:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2,

and 3

Docket No.

STN 50-528 (License No. NPF-41)

STN 50-529 (License No. NPF-51)

STN-50-530 (License No. NPF-74)

Reply to Inspection Report 528/89-18, 529/89-18, 530/89-18 File; 89-019-026 I

The referenced letter discussed the proposed implementation of a Nonconformance Report (NCR) program and provided an expected completion date for implementation by August 1989.

This letter is being provided to update the current status of the program implementation.

During final review of the program by the Plant Review Board (PRB), the on-site review group, on July 28, 1989 it was directed that additional training be provided to APS personnel beyond that normally given for procedure/program revisions.

The basis for that direction was the significance of the scope change from the existing program.

The PRB approved the NCR procedure on July 28, 1989 pending a sixty (60) day training period.

The lead director's approval for the NCR program was obtained on August,1, 1989 with an implementation date of October 1, 1989.

If you have any questions concerning this matter, please contact me.

Very truly yours, WFC/TDS/kj cc: