ACCELE RATEO 2""IRIBUTION DEMONS/ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8909060244 DOC.DATE: 89/08/29 NOTARIZED:
NO DOCKET F
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528
~
STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION TROSKLOSKI,W.
Ofc of Enforcement (Post 870413)
LIEBERMAN,J.
Ofc of Enforcement (Post 870413)
RECIP.NAME 'ECIPXENT AFFILIATION
SUBJECT:
EN-89-082:during Sept 1989,NOV
& proposed imposition of CP in amount of $250,000 will be issued to licensee.
based on DISTRIBUTION CODE:
XE33D COPIES RECEIVED:LTR
(
ENCL SIZE:
TITLE! Enforcement Notice (EN)
NOTES: Standardized plant.
Standardized plant.
05000528 05000529 05000530 D RECXPIENT ID CODE/NAME INTERNAL: AEOD/DOA DEDRO NRR/DREP/EPB 10 NUDOCS-ABSTRACT OE FILE 01 RGN2/DRSS/EPRPB EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL RECIPIENT ID CODE/NAME AEOD/DSP/TPAB NRR/DOEA/EAB 11 NRR/PMAS/ILRB12 H DI EG-EZLE NRC PDR COPXES LTTR ENCL
/
h TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL 15
August 29, 1989 EN 89-82 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFGRCEMEJJT ACTION Licensee:
Arizona Nuclear Power Project (EA 89-88)
(Palo Verde)
Docket tJos.
50-528, 50-529 and 50-530
Subject:
PROPOSED IMPOSITIO!J OF CIVIL PENALTY - $250,000 QCJ This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of Two Hundred Fifty Thousand Dollars
($250,000) will be issued on or about September 1989 to Arizona Nuclear Power Project.
This action is based on violations identified by an AIT investigation of the March 3, 1989 Unit 3 reactor trip, safety injection and loss of rior-class IE electrical power.
The violations were grouped into three Severity Level III problems.
The first addressed inadequate corrective actions and dealt mainly with the atmospheric dump valves.
The base civil penalty was escalated 100%
for the added significance resulting from the duration of these violations.
The second problem concerned operator and training issues for which no escalation or mitigation is appropriate.
The third problem was inadequate emergency lighting and the civil penialty was escalated 100
- 50% escalation because the NRC identified the violations, 100% escalation for the duration of the installation, testing and maintenance violations, and 50% mitigation because the corrective actions were extensive.
It should be noted that the licensee has not been specifically informed of the enforcement action.
The schedule of issuance and notification is:
Mailing of Notice September 1,
1989 Telephone Notification of Licensee September 1,
1989 The State of Arizona will be notified.
The licensee has thirty days from the date of the Notice in which to respond.
Following NRC evaluation of the response, the civi 1 penalty may be remitted, mitigated, or imposed by Order.
Contact:
W. Troskloski, OE 23281 Q. Lieberman, OE, 20741 Distribution arNN Chairman Carr Comm. Roberts Comm.
Rogers Comm. Curtiss SECY ACRS CA GPA
,~gg~(ggq)2pp 8./C>~~29 POP I~<l=
pDC pg-89-<
OWFN 3:>4 EDO DEDR DEDS OE NMSS NRR OI SP OGC MMBB ~3:g.
RM AEOD Regional Offices RI 3'P~
RIV 3.'>s RII 3:ss RV 3.'zs RIII 3:~
MAIL ADM: Doc. Mgt. Br.
PDR RES OIG PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL PUBLICLY ANNOUNCED 6