ML17304B284

From kanterella
Jump to navigation Jump to search
Forwards Revised Reload Analysis Rept Changes for Cycle 3. Revised Pages Indicate That Cycle 2 Termination Burnup Assumed to Be Between 284 & 350 EFPD
ML17304B284
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/27/1989
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17304B285 List:
References
161-02064-WFC-K, 161-2064-WFC-K, NUDOCS 8906300230
Download: ML17304B284 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8906300230

'DOC.DATE: 89/06/27 NOTARIZED-NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

R

SUBJECT:

Forwards revised reload analysis rept changes for Cycle 3.

Changes reflect early shutdown of Cycle 2.

DISTR1BUTION CODE:

AOOID COPIES RECEIVED:LTR g ENCL Q SIZE:

TITLE: 'OR Submittal:

General Distribution~

II NOTES:Standardi'zed plant.

S 05000528 RECIPIENT ID CODE/NAME PD5 LA CHAN,T II INTERNAL: ACRS NRR/DEST/CEB 8H NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: LPDR

~ NSIC II NOTES COPIES LTTR ENCL 1

1 5

5 6

6 1

1 1

1 1

1 1

1 1

0 1

1 1

1 1'

1 l'.

RECIPIENT ID CODE/NAME PD5 'PD DAVIS,M NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11

/

NRC PDR COPIES LTTR ENCL 1,

1 5

5 1

1 1

1 1

1 1

1 0

1 1

1 1

NOXK 'IO ALL 'KIDS"'EXXFENTS:

PLEASE HELP US KO REDUCE ATE!

CGHZACT 'IHE DOCXlMEÃT CONZROL DESK, RXN P1-37 (EXT, 20079)

TO EZIIMZNATBKKR NAME ESCA DZPTBZBUTZQN LZSTS PDR IXXXlMEMX8VXJ DQHPT NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 34 ENCL 32 D

S C

~

~

Arizona Public Service Company P.o. BOX 53999

~

PHOENIX, ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIOENT NUCLEAR 161-02064-WFC/KLMC June 27, 1989 Docket No.

STN 50-528 Document Control Desk U.

S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D. C.

20555

Reference:

Letter to the NRC from D. B. Karner,

ANPP, dated January 18, 1989;I

Subject:

PVNGS Unit 1 Reload Analysis for Unit 1, Cycle 3 (161-01620)

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1

Revised Reload Analysis Report Change Pages Unit 1, Cycle 3

File:

89-E-056-026 Attached are the change pages for the Unit 1, Cycle 3 Reload Analysis Report (RAR) necessary to reflect the early shutdown of Cycle 2.

The revised pages (l-l, 2-1 and 5-1) indicate the Cycle 2 termination burnup is assumed to be between 284 EFPD and 350 EFPD.

In addition to the revisions required by the early

shutdown, page 4-2 has been revised to include the relationship between FATES3A and FATES3.

These revisions represent the only licensing related changes required for the Unit 1, Cycle 3 analysis due to the early shutdown of the unit.

At this time, no additional Unit 1, Cycle 3 Reload Technical Specification change requests are'xpected.

If you should have any questions concerning this

matter, please contact Mr. A. C. Rogers of my staff at (602) 371-4041.

Sincerely, WFC/KLMC//le Attachments cc:

G.

W. Knighton (all w/attachments)

M. J. Davis T. L. Chan T. J. Polich 8906300230 890627 PDR ADOCK 05000528 PDC po/

i'

~

~