ML17304B181

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages to Final Reload Analysis Rept for Facility Cycle 2,submitted on 881227.Pages Reflect Correction to Section 12 of Reload Analysis Rept
ML17304B181
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/11/1989
From: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17304B182 List:
References
161-01919-DBK-J, 161-1919-DBK-J, NUDOCS 8905240022
Download: ML17304B181 (4)


Text

4CC~iLZPATED DI~BUTION DEMONSTRglON SYSI'EM

~ ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8905240022 DOC.DATE: 89/05/11 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3,, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION KARNER,D.B. Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards revised pages to final reload analysis rept for facility Cycle 2,submitted on 881227.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:Standardized. plant. 05000530 g RECIPIENT 'COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 DAVIS,M.J. 5 5 DAVIS,M 5 5 INTERNAL: ACRS 6 6 NRR/DEST/ADS '7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 D NRR/DEST/ICSB 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSB 11 1 1 S NUDOCS-ABSTRACT 1 1 OC LFMB 1 0 OGC/HDS1 "1 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1.

NOTES 1 1 D

S h

D NOTE 'Lo ALL "RIDS" RECXPIENIS ~

~CT 'IHE DOCUMEMI'OVIBOL DESK,

~

PLEASE HELP US 1Q REDUCE WASTE!

ROOM P1-37 (EXT. 20079) IO ZLIlQKLTE YOUR HME FRY DZSTIKBUTIGN FOR DCCUMEMIS YOU DQNiT NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 34 ENCL 32

ig I

~

Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX, ARIZONA55072-2034 161-01919-DBK/JRP May 11, 1989 Docket No. STN 50-530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D. C. 20555

Reference:

APS Letter from D. B. Karner to USNRC; 161-01575-DBK/PGN, dated December 27, 1988

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Corrections to Reload Analysis Report for Unit 3 Cycle 2 File:, 89-G-056-026 Attached are revised pages (4-3 and 4-4) to the final PVNGS Unit 3 Reload Analysis Report (RAR) transmitted in the reference. These pages reflect corrections to references listed in Section 12 of the RAR. Additionally, a sentence was added to Section 4.3 explaining the relationship between FATES 3 and FATES 3A. Should you have any questions please call.

Very truly yours, D. B. Karner Executive Vice President DBK/JRP/jle Attachments cc: G. W. Knighton H. J. Davis J. B. Hartin T. J. Polich Pol 8905240022 8$ '0511 PDR ADOCK 05000530 PDC

F 4~