ML17304B126

From kanterella
Jump to navigation Jump to search
Forwards Revised Reload Analysis Rept for Unit 1,Cycle 3
ML17304B126
Person / Time
Site: Palo Verde 
Issue date: 04/19/1989
From: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
161-01858-DBK-S, 161-1858-DBK-S, NUDOCS 8904270337
Download: ML17304B126 (30)


Text

q~ ~C'CELERATED D1~BUTION DEMONSTR+lOY SYFTEg.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8904270337 DOC.DATE: 89/04/19 NOTARIZED:

NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH.NAME AUTHOR AFFILIATION KARNER,D.B.

Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document"Control Desk)

SUBJECT:

Forwards revised reload analysis rept for Unit 1,Cycle 3.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL

-SIZE:

TITLE: OR Submittal:

General Distribution NOTES:Standardized plant.

D 05000528 8

RECIPIENT

'ID CODE/NAME PD5 LA CHAN'jT INTERNAL: ACRS NRR/DEST/CEB 8H NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNA'L: LPDR NSIC NOTES COPIES LTTR ENCL 1

1 5

5 6

6 1

1 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M NRR/DEST/ADS 7E NRR/DES T/ES B 8 D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 OC B

G F E

01.

NRC PDR COPIES LTTR ENCL 1

1 5

5 1

1 1

1 1

1 1

1 1

0 1

1 1

1 R

I S

h NOIE 'IO ALL "RIDS" RECIPIENTS:

PIZASE HELP US Io REDUCE WASTE!

CORI'ACT 'IHE DOCUMEMI'XNZROLDESK ROOM Pl-37 (EXT. 20079)

KO ELIMINATE YOUR NAME PBOH DZSTRZBVZXGN LXSTS FOR DOCUMEMIS YOU DClN'T NEZDf'OTAL NUMBER 'OF COPIES REQUIRED:

LTTR 34 ENCL 32

~ '

c Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX. ARIZONA85072-2034 161-01858 -DBK/SW Apri1 19, 1989 Docket Nos.

STN 50-.528 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Mail Station Pl-137 Washington, D. C.

20555

Reference:

161-01620-DBK/BJA, dated January 18, 1989

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1

Reload Analysis Report for Unit 1, Cycle 3

File:

89-056-026

Attached, for your information, is the revised Reload Analysis Report which supports Cycle 3 operation of PVNGS Unit 1.

The attached pages supercede those previously transmitted in the Reference.

In addition, clean graphs are provided for the PVNGS Unit 1:,

Cycle 3 Technical Speci'fications changes.

The changes include addition of final references and corrected typographical errors.

Very truly yours, D. B. Karner Executive Vice President DBK/SW/51e Attachment cc:

G.

W. Knighton T. L. Chan T. J. Polich A. C. Gehr (all w/attachment)

S904270337'9041'9 PDR ADOCK 0500052S P

PDC y~O/

I/g

~i

'a 0(Ill mO fA z

1.00 FIGURE 3.1-4 CEA INSERTION LIMITS vs. THERMAL POWER (COLSS OUT OF SERVICE) 0.90 Col D

lO 5

0.80 O

0.70 0.60 0.50 I~

0.40 0z0 0.30 0.20

~I-Og Z

~

taO g

()I- 0 I

IL TRANSIENT INSERT ION LIMIT 0.10 0.00 BANK 5 150 120 90 60 30 BANK 3 BANK 1 0

150 120 90 60 30 0

150 120 90 60 30 0

BANK 4 BANK 2 150 120 90 60 30 0

l 150

) 120 90 60 30 0

CEA WITHDRAWAL(INCHES)

0 0

~ 4

\\

100 90 80 70 z

O 60 l~

I K

50

'0 x:

40 N~

30 REGION OF, UNACCEPTABLE OPERATION 5

~ U ll 20 10 020'30 40 50 REGION OF ACCEPTABLE OPERATION 60

'0 80 90 100 PERCENT OF RATED THERMAL POWER FIGURE 3.2-1A AZIMUTHALPOWER TILT LIMITvs. THERMAL POWER (COLSS IN SERVICE)

PALO VERDE - UNIT 1 3/4 2-4a

0 t

I

2.5 COLSS OUT OF SERVICE DNBR LIMITLINE 2.4 ACCEPTABLE OPERATION 2.3 MINIMUM1 CEAC OPERABLE IX ClK 2.2 O

g2 Q

2e1 O

(-0.2, 2.15)

(0.2, 2.15) 2.0 UNACCEPTABLE OPERATION 1.9 1.8-0.3

-0.2

-0.1 0.0 CORE AVERAGE ASI 0.1 0.2 0.3 FIGURE 3.2-2 DNBR MARGIN OPERATING LIMITBASED ON CORE PROTECTION CAI CULATORS (COLSS OUT OF SERVICE, CEAC'S OPERABLE)

PALO VERDE - UNIT 1 3/4 2-7

~

~

~ q>

(

< ~

,4

~

gl 1

I Jh

2.5

,COLSS OUT OF SERVICE DNBR LIMITLINE ACCEPTABLE OPERATION 2.4 CEAC'S INOPERABLE (0.05, 2.40)

(0.2, 2.40) 2.3 K

RO 2.2 K

O O

2.1

(-0.2, 2.20)

UNACCEPTABLE OPERATION 2.0 1.9-0.3

-0.2

-0.1 0.0 0.1 0.2 0.3 CORE AVERAGE ASI FIGURE 3.2-2a DNBR MARGIN OPERATING LIMITBASED ON CORE PROTECTION CALCULATORS (COLSS OUT OF SERVICE, CEAC'S INOPERABLE)

PALO VERDE - UNIT 1 3/4 2-7a

~l

/.

~

+

)I h

~ >C

~w