"ACCE'LERATED D1~BUT1OY DEMONS~0.'i SYSTEM REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8902230150 DOC.DATE: 89/01/31 NOTARIZED: NO DOCKET FACXL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION BORST,S.G.
Arizona Nuclear Power Project (formerly Arizona Public Serv HAYNES,J.G.
Arizona Nuclear Power Project (formerly Arizona Public Servp RECXP.NAME RECIPIENT AFFILIATION I
SUBJECT:
Monthly p
repts for Jan 1989 for Palo Verde Units 1, 2
& 3. /890215 DISTRIBUTION CODE:
4D COPIES RECEIVED: LTR
't ENCL C SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES:Standardized plant.
Standardized plant.
Standardized plant.
RECIPIENT XD CODE/NAME PD5 LA CHAN,T DAVIS,M.J.
INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR/D E RPB 10 R~ILE EXTERNAL: EG&G SIMPSON, F LPDR NSIC NOTES:
COPIES LTTR ENCL 1
0 1
0 1
0 10 10 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 5
5 1
0 1
1 2
2 1
1 1
1 1
1 1-1 1
1 05000528 05000529k.
05000530 D
h NOTE '10 ALL "RIDS" RECIPIENIS'IZASE HELP US 10 REDUCE %ASTE.'MKC1'IHE DOCHM&I'QÃI'ROLDESK, ROOM Pl-37 (EXT. 20079) K) ELIMINATEKRR NME FROM DISTEKBUTIGN LISTS FOR DOCUME2GS YOU DON'T NEED/
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 35 ENCL 31
1
~I
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 02 13 89 COMPLETED BY S G
Borst TELEPHONE 602 371-4092 OPERATING STATUS 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 1 Reporting Period:
Januar 1989 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0 Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A 11 12 13 14 15 16 17 18 19.
20.
21.
22 23.
24.
Hours in Reporting Period Number of Hours Reactor Was Crit:ical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next Refuelin Outa e
- 04 08 89 This Month 44 0
744 0
Yr.-to-Date 744 0
44 0 Cumulat:ive 26 400 0
16 484 1
0 0 44 0
0 0 744 0
0 0 16 048 9
0 0 2 775 471.0 9 4 016 0
924 288 3
100 0
100.0%
101 0 0 2 775 471 0
974 016 0
924 288 3
100 0
100.0 101 7
0 0 56 141 394,0 20 203 416.0 18 920 903 0
60 8
60 8
58 56 4 26 5
0 Oa 6 Months (Type, Date, and Duration of Each):
75 Da s 25 If Shutdown At End of Report Period, Estimated Date of Startup:
smaze-oizp ay@131 PDR ADOCK 05000528 PDC Forecast INITIALCRITICALITY
~05 85 INITIALELECTRICITY
~06 85 COMMERCIAL OPERATION 11 85 Achieved 05/525 85 06 10 85 01 28 86 0409A/2264A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 02 13 89 COMPLETED BY S.
G. Borst TELEPHONE 602 371-4092 MONTH: JANUARY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1 266 1 265 17 18 1 261 1 261 1 260 19 1 259 1 257 20 1 257 1 259 1 247 1 262 1 265 22 23 1 259 1 259 1 264 24 1 256 1 263 1 258 10 1 263 26 1 259 1 262 27 1 259 12 1 262 28 1 259 13 1 246 29 1 261 14 1 012 30 1 259 1 030 31 1 259 16 1 210
A\\
~
REFUELING INFORMATION DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 02 13 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 1.
Scheduled date for next refueling shutdown.
04/08/89 2.
Scheduled date for restart following refueling.
06/21/89 3.
Will refueling or resumption of operation thereafter require a
Technical Specification change or other license amendment2
- Yes, as a minimum it will include the following:
3/4 1.3.6, 3/4 2.3, 3/4 2.4.
4.
Scheduled date for submitting proposed licensing action and supporting information.
Submitted on Ol/12/89.
5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, new operating procedures'he fuel vendor for the next reload will be Combustion Engineering.
6.
The number of fuel assemblies a)
In the core.
241 b)
In the spent fuel storage pool.
7.
Licensed spent fuel storage capacity.
80 1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and full core discharge capability).
P
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 02 13 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 01/31 2400 JANUARY 1989 01/01 0000 01/13 2110 01/16 1537 Reactor power is at 100%.
Reactor power reduced to 80% for surveillance testing.
Reactor power is at 100%.
Reactor power is at 100%.
l
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-528 UNIT NAME PVNGS-1 COMPLETED BY S.
G. Boz'st No.
Date Typei Duration Hours Method of Shutting System Component Reason Down Reactor LER No.
Code Code Cause and Corrective Action to Prevent Recurrence No Reactor Shutdowns or Significant Power Reductions Occurred During the Month.
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain) 8-Maintenance or Test C-Refuel ing D-Regulatory Restriction E-Operator Training 4 License Examination F-Administrative G-Operational Error H-Other (Explain) Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain)
Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)
Exhibit H-Same Source
t
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 02 13 89 COMPLETED BY S G
Borst TELEPHONE 602 371-4092 OPERATING STATUS 2.
3.
4.
5.
6.
7.
8.
9
~
10 11.
12.
13.
14.
15.
16.
17
'8
'9.
20.
21.
22.
23
'4
'5 Unit Name:
Palo Verde Nuclear Generatin Station Unit 2 Reporting Period:
Januar 1989 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
1270 Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A This Month Yr.-to-Date Cumulative 20 784.0 15 769 1
744 0 Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next None 744. 0 744 0 744.0 0 0 0 0 0 0 744.0 744 0 15 484 0 0 0.0 0 0 2 800 843.0 2 800 843.0 56 727 620.0 19 844 790 0
18 603 154 0 976 320 0
976 320.0 919 101.1 100.0a 100 0
919 101 1
100.0a 74 5
4 5 100 0 101 2
101 2
73 3
70.5%
97 3s 97.3a Og 6 Months (Type, Date, and Duration of Each):
5.2%
If Shutdown At End of Report Period, Estimated Date of Startup:
N A Achieved
~04 18 86 Forecast
~03 86 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 06 86 05 20 86
~11 86 09/919 86 I
il (I
I e
~
I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 02 13 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 MONTH'ANUARY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1 245 1 245 17 18 1 215 1 246 1 243 19 1 244 1 239 1 234 1 229 20 22 1 241 1 242 1 246 1 101 23 1 247 1 248 24 1 244 10 1
46 1 244 25 26 1 246 1 245 12 1 244 1 24 27 28 1 243 1 246 13 1 246 29 1 245 14 1 246 30 1 245 15 1 246 31 1 244 16 1 230
/
REFUELING INFORMATION DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 02 13 89 COMPLETED BY S G
Borst TELEPHONE 602 371-4092 1.
Scheduled date for next refueling shutdown.
09/15/89 2.
Scheduled date for restart following refueling.
11/12/89 3.
Will refueling or resumption of operation thereafter require a
Technical Specification change or other license amendments To be determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
07/89 5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, new operating procedures.
To be determined 6.
The number of fuel assemblies a)
In the core.
241 b)
In the spent fuel storage pools 108 7.
Licensed spent fuel storage capacity.
1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel assuming present capacity.
storage pool 2004 (18 Month reloads and full core discharge capability).
I I
,1 I
4'
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 02 13 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 JANUARY 1989 01/01 01/07 01/07 01/16 01/17 01/31 0000 0100 1600 2233 0400 2400 Unit in Mode 1 - Reactor Power 100%.
Reactor power reduced to 75% to support surveillance testing.
Reactor power is at 100%.
Commenced boration due to D.C. electrical system investigation.
Reactor power at 100%.
Reactor power at 1008.
4
~
~
ll
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY S.
G. Bot'st-No.
Date Typei Duration Hours Method of Shutting System Component Reason Down Reactor LER No.
Code Code Cause and Corrective Action to Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training
& License Examination F-Administrative G-Operational Error H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain) 4 Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)
Exhibit H-Same Source
C,
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 02 13 89 COMPLETED BY S.
G Borst TELEPHONE 602 3 1-4092 OPERATING STATUS 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 3 Reporting Period: 'anuar 1989 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
1270 Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A This Month Yr.-to-Date Cumulative 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy'enerated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next Refuelin Outa e
- 03 04 89 44.0 744 0
9 360.0 385 1
385 1
8 586.8 0 0 340 0 0 340 0 0 8 552 0
0 0 0.0 0.0 1 393 430.0 469 080 0 434 189 0
50 3a 50 3
1 393 430 0
469 080 0
434 189 0 50 3
50 3
31 706 168 0
11 116 280 0 10 469 664.0 91 4 91.4s 4
8 4
8 91 6
88 1
8.7a 6 Months (Type, Date, and Duration of Each):
75 Da s
- 25. If Shutdown At End of Report Period, Estimated Date of Startup:
N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast Achieved
~07 87
~10 25 8
~07 87 11/128 87
~09 87 01/108 88
1 It
~
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 02 13 89 COMPLETED BY orst TELEPHONE 602 371-4092 MONTH: JANUARY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1 260 1 258 17 18 1 255 19 1 252 20 1 252 21 21 183 22 23 24 1 189 1 264 25 1 261 10 26 1 196 27 1 200 28 1 264 13 29 1 266 14 30 1 262 15 31 1 264 16
1
REFUELING INFORMATION DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 02 13 89 COMPLETED BY S.
G Borst TELEPHONE 602 371-4092 1.
Scheduled date for next refueling shutdown.
03/04/89 2.
Scheduled date for restart following refueling.
05/17/89 3.
Will refueling or resumption of operation thereafter require a
Technical Specification change or other license amendments
- Yes, these are expected to include the following:
2.1.1.1, 3/4 1.1.2, 3/4 1.1.3, 3/4 1.3.1, 3/4 1.3.6, 3/4 2.1, 3/4 2.3, 3/4 2.4, 3/4 2.5, 3/4 2.8, 3/4 3.1, 3/4 3.2.
4.
Scheduled date for submitting proposed licensing action and supporting information.
Submitted on 12/14/88 5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, new operating procedures.
The fuel vendor for the next reload will be Combustion Engineering.
6.
The number of fuel assemblies a)
In the core.
241 b)
In the spent fuel storage pool.
7.
Licensed spent fuel storage capacity.
1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
I
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 02 13 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 JANUARY 1989 01/01 01/06 01/06 01/21 01/21 01/21 01/23 01/26 01/27 01/31 0000 0540 0638 0530 1045 1538 1427 1207 1457 2400 Reactor power is at 100%.
Main turbine tripped due to Diesel Generator problems.
Reactor tripped.
Reactor critical.
Entered Mode 1
Turbine synchronized to grid.
Reactor at 100$ power.
Reactor power reduced for azimuthal tilt control.
Reactor power at approximately 100%.
Reactor power at 100%.
V
,I fg I
ji I
$1, 4.
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-530.
UNIT NAME PVNGS-3 DATE=
COMPLETED BY S.
G. Borst No.
Date Type1 Duration Hours Reason2 Method of Shutting System Down Reactor LER No.
Code4 Component Code~
Cause and Corrective Action to Prevent Recurrence 89.01 01/06 379 89-004 EK DG During routine testing of the "A" EDG on January 4,
- 1989, the exhaust rocker arm for the 8L cylinder failed resulting in an EDG trip.
The remaining rocker arms on the "A" EDG were inspected and another crack was identified on the exhaust rocker arm for the 9R cylinder.
The rocker arms for the remaining Palo Verde Units 1, 2, and 3 -EDG s have been inspected and no other deficiencies were noted.
Long-term corrective action will be developed in association with the original equipment manufacturer (Cooper-Bessemer).
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error H-Other (Explain)
Hethod:
1-Hanual 2-Hanual Scram 3-Automatic Scram 4-Continuation from Previous Honth 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instruct ions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)
Exhibit H-Same Source
t'
Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 254-00093-JGH/SGB February 15, 1989 Docket Nos.
STN 50-528/529/530 Document Control Desk U.
S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.
20555
Dear Sirs:
Subj ect:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Monthly Operating Reports for January 1989 File'8-024-404 88-056-026 Attached are the Monthly Operating Reports for January 1989 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A
(Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3
Operating Licenses.
By copy of this
- letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.
If you have any questions, please contact Mr. S.
G. Borst, at (602) 371-4092.
Very truly yours, J.
G. Haynes Vice President Nuclear Production JGH/SGB/dim Attachments cc:
M. J. Davis J.
B. Martin T. J. Polich J.
A. Amenta INPO Records Center (all w/attachments)