ML17304A991

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 5 to EPIP-24,Rev 6 to EPIP-31 & Revs 5,6 & 7 to EPIP-33.W/undated Release Memo
ML17304A991
Person / Time
Site: Palo Verde  
Issue date: 01/08/1989
From: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17304A992 List:
References
161-01601-DBK-P, 161-1601-DBK-P, NUDOCS 8901310111
Download: ML17304A991 (6)


Text

VIBRATED K BUTION DEMONS'TION SYPH'ZM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8901310111 DOC.DATE: 89/01/08 NOTARIZED: NO DOCKET' FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 'Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION KARNER,D.B.

Arizona Nuclear Power Project (formerly Arizona Public Serv +

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards public version of revised EPIPs,including Rev 6 to EP-24,Rev 6 to EP-31 6 Rev 6 to EP-33.

DISTRIBUTION CODE:

DFOID COPIES RECEIVED:LTR XENCL~

SIZE: 2 R TITLE: Direct Flow Distribution: 50 Docket (PDR Avail)

NOTES:Standardized plant.

Standardized plant.

Standardized plant.

RECIPIENT ID CODE/NAME INTERNAL: NUDOCS-ABSTRACT EXTERNAL: LPDR NSIC NOTES COPIES LTTR ENCL 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME COPIES LTTR ENCL NRC PDR 01 1

3.'1 05000528 05000529 A 05000530 D

h NOTE 'IO ALL RIDS" RECIPZERIS:

PLEASE HELP US TO REIXJCE WASTE.'GNI'ACT 'IHE DOQ3MENT CONTROL DESK, ROOM P1-37 (EXT. 20079)

TO EIZKBCQE K)UR NME FMM DZSTRIBUTIGN IZSTS FOR DO(XIMEKXS YOU DGN'T NEEDS TOTAL NUMBER OF COPIES REQUIRED:

LTTR 6

ENCL 6

!I J

II ll l,

%P Arizona Nuclear Power Project P.O, BOX 52034

~

PHOENIX. ARIZONA55072-2034 161-01601-DBK/PGN January 8, 1989 Docket Nos.

STN 50-528/529/530 Document Control Desk U.

S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.

20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Emergency Plan Implementing Procedure Update File:

89-002-493; 89-056-026'n accordance with 10 CFR 50, Appendix E, ANPP is submitting updated Emergency Plan Implementing Procedures (EPIPs) which are marked with an, "X" in the Attachment.

If you have any questions or require -additional information, do not hesitate to call.

.Very truly yours, D; B. Karner Executive Vice President DBK/PGN/dim Attachments cc:

J.

B

~ Martin T. L. Chan M. J.

Davis A. C. Gehr T. J. Polich G. A. Brown Document Control Desk (w/a)

(w/a)

(w/a)

(w/a)

(w/a)

(w/Copy 6 and Copy 9)

(w/Copy 7 and Copy 8) l j

r r% g-~

~

~S90i3i0iii 890i08 PDR ADOCK 05000528 F

PDC

0

p,8 RECy

+4 0

Op 0

DQ

+~

~0

+p *y 4 t

UNITEDSTATES t NUCLEAR REGULATORY COMMISSION'ASHINGTON, D. C.'0555 Docket No. 50-528 Palo Verde MEMORANDUM FOR'ROM:

SUBJECT:

The Division of determined that Chief, Document Management

Branch, TIDC Director, Division of Rules and Records, ADM REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION Rules and Records has reviewed the attached document and has it may now be made publicly available..

gy gA ~My Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Attachment:

As stated

. le

0

~I