ML17304A981

From kanterella
Jump to navigation Jump to search
Amend 42 to License NPF-41,revising Surveillance Requirement 4.1.3.1.2 to Allow Continued Operation of Unit Until End of Current Cycle W/O Conducting Any Further Exercise Tests of Control Element Assembly 64
ML17304A981
Person / Time
Site: Palo Verde 
Issue date: 01/13/1989
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17304A982 List:
References
NUDOCS 8901260099
Download: ML17304A981 (4)


Text

pe REgy a

4 0

C O

Vl gO

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ARIZONA PUBLIC SERVICE COMPANY ET AL.

DOCKET NO.

STN 50-528 PALO VERDE NUCLEAR GENERATING STATION UNIT NO. I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.42 License No.

NPF-41 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment, dated December 23,

1988, by the Arizona Public Service Company (APS) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison
Company, Public Service Company of New Mexico, Los Angeles Department of Mater and Power, and Southern California Public Authority

( licensees),

complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commmission's regulations and all applicable requirements have been".satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-41 is hereby amended to read as follows:

890i260099 890iis PDR ADOCK 05000528 P

PDC

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 42, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.

APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION George W

nighton irector Project irector V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

Change to the Technical Specifications Date of Issuance:

January 13, 1989

January 13, 1989 ENCLOSURE TO LICENSE AMENDMENT NENDHEHT NO.

42 TO FACILITY OPERATING LICENSE NO.

NPF-41 DOCKET NO.

STN 50-528 Peplace the following page of the Appendix A Technical Specifications with the enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

Also to be replaced is the following overleaf page to the amended page.

Amendment-Pa e

3/4 1-22 Overleaf-Pa e

3/4 1-21

~

L

~

~

~ I

~

~

~

~

~

~

~

~

~

~

~

~

~ ~

~

~

~

~

~ I

~

~

~

~

~ I

~

~

~

~

~

~

I

~

~

~

~

~

~

~ I I

~

I

~

I

~

I

~

~

I I ~

I

~

~

~

~

~

I I

I

~

~

~

I

~

~

~

~

~ ~

~

I

~

~

~ I

~

~

~

I

~

~

~

~ '

~

~

I I. I

~

~

~

~

I

~

~

~

~

~

I

~

~

~

~

~

~