ML17304A975

From kanterella
Jump to navigation Jump to search
Forwards Reload Analysis Rept for Palo Verde Nuclear Generating Station Unit 1,Cycle 3
ML17304A975
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/18/1989
From: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17304A976 List:
References
161-01620-DBK-B, 161-1620-DBK-B, NUDOCS 8901260083
Download: ML17304A975 (4)


Text

<ACCELERATED DlKBUTlON DEMONSTEQN SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8901260083 DOC.DATE: 89/01/18 NOTARIZED: NO DOCKET' FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528.

AUTH.NAME AUTHOR AFFILIATION KARNER,D.B.

Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

S st 4aqi

SUBJECT:

Forwards "Reload Analysis Rept for palo Verde Nuclear Generating Station Unit 1,Cycle 3."

R DISTRIBUTION CODE:

IE26D COPIES RECEIVED:LTR l ENCL SIZE: +F3 TITLE: Startup Report/Refueling Report (per Tech Specs NOTES:Standardized plant.

05000528 8

h

'ECIPIENT ID CODE/NAME PD5 LA CHAN,T INTERNAL: ACRS N

CHATTERTON G FE 02 CHARS PRPB

'EXTERNAL:.LPDR

. NSIC NOTES COPIES LTTR ENCL 1

0 2

2 5

5 1

1 1

1 1

1 1

.: 1 1

1 1

1

'ECIPIENT ID CODE/NAME PD5 PD DAVIS,M ARM TECH ADV NUDOCS-ABSTRACT RGN5 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 A

NOTE 10 ALL "RIDS" RECIPIENIS:

PZZ'ASE HELP US 'ZO RlKKKZ HASTE!

CXÃZACT 'THE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 20079)

TO EZZMINATE YOUR K@K FBGM DISTRIBUTION ILISTS H)R DOCKlMENIS YOU DClNIT NEED)

S A

D S

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

,21 ENOL 20

il

~I

Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX. ARIZONA85072-2034 161-01620-DBK/BJA January 18, 1989

'Docket No.

STN 50-528 Document Control Desk U.S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.

20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1

Reload Anal'ysis Report. for Unit "1, Cycle 3

File:

89-E-056-026

Attached, for your informatiori, 5s the Reload Analysis Report (PAR) which supports Cyc1e 3 operation of PVNGS Unit 1.,

The RAR describes the Cycle 3 core parameters for Unit 1.

Additionally, the RAR supports the proposed Technical Specification changes for Unit 1, Cycle 3.

The Technical Specification change requests are being submitted under a separate cover letter.

If you have any questions on this matter, please contact Mr. A.

C.

Rogers at (602)

~ 371-4041.

Very truly yours, D. B. Karner Executive Vice President DBK/BJA/pvk Attachment cc:

G.

W. Knighton T. L. Chan J.

B. Martin T. J. Polich A. C. Gehr (all w/a) 3901260033 390113 PDR ADOCK 05000523

'P PDC

4>

gl