ML17304A703

From kanterella
Jump to navigation Jump to search
Informs of Schedule Change for SPDS Audit Open Items for 890615 Completion.Simulator Revalidation Rescheduled for Third Quarter of 1989
ML17304A703
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/31/1988
From: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
161-01447-DBK-P, 161-1447-DBK-P, NUDOCS 8811080294
Download: ML17304A703 (4)


Text

AC-ElZRATED -

D3SIRJBUTI ON DE MOBSCURA,TION SYFI'EM REGULAT+ INFORMATION DISTRIBUTIONYSTEM (RIDE)

ACCESSION 'NBR:8811080294 DOC.DATE: 88/10/31 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION KARNERFD.B.

Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs of scheduled completion of safety parameter display sys audit open items.

DISTRIBUTION CODE:

A003D COFZES RECEIVED:LTR I ENCL O SIZE:

TITLE: OR/Licensing Submittal:

Suppl 1 to NUREG-0737(Generic Ltr NOTES:Standardized plant.

Standardized plant.

Standardized plant.

D 82-33)

S 05000528 05000529

'05000530 A.

RECIPIENT ID CODE/NAME PD5 LA CHAN,T INTERNAL: ARM/DAF/LFMB NUDOCS-ABSTRACT RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

.1 1

RECIPIENT ID CODE/NAME PD5 PD DAVIS,M NRR/DLPQ HFB 10 EG FILE 01 NRC PDR COPIES LTTR ENCL NOTES:

R I

0 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL

II

'gl p

~P'I

Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX, ARIZONA85072-2034 161-01447-DBK/PGN October 31, 1988 Docket Nos.

STN 50-528/529/530 Document Control Desk U.S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.

20555

Reference:

Letter from E. E. Van Brunt, Jr.

(ANPP) to NRC, dated 12/24/87 (161-00722).

Subject:

SPDS Audit Open Items

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Sa'fety Parameter Display System (SPDS) Audit Open Items File:

88-A-056-026 The referenced letter provided ANPP's response to the SPDS audit findings.

All open items, wi'th the exception of the simulator revalidation, were scheduled'or completion by December, 1988.

The revalidation of the SPDS in the simulator was scheduled for completion by the second quarter of 1989.

Due to the implementation of new procedures for control of software generation and modifications and changes in responsibility for the simulator upgrade project, this schedule is no longer accurate.

The SPDS audit open items, with the exception of the simulator revalidation, are currently scheduled to be complete by June 15, 1989.

The simulator revalidation is scheduled for the third quarter of 1989.

If you have any questions, please call Mr. A. C. Rogers at (602) 371-4041.

D. B. Kame Executive Vice President DBK/PGN/pvk cc:

G.

W. Knighton T. L. Chan M. J. Davis J.

B. Martin T. J. Polich 881 l080294 88103i PDR ADOCK 05000528 P

PNU

Il 0

I