ML17304A627

From kanterella
Jump to navigation Jump to search
Forwards Suppl 2 to Palo Verde Nuclear Generating Station Unit 3 Startup Rept.
ML17304A627
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/05/1988
From: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17304A628 List:
References
161-01358-DBK-P, 161-1358-DBK-P, NUDOCS 8810120239
Download: ML17304A627 (3)


Text

ACCELEEATED DARIBUTION DEMONS'ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8810120239 DOC.DATE: 88/10/05 NOTARIZED: NO -

DOCKET g FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME'UTHOR AFFILIATION KARNER,D.B. Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Suppl 2 to "Palo Verde Nuclear Generating Station Unit 3 Startup Rept."

DISTRIBUTION CODE: IE26D COPIES RECEIVED: LTR r ENCL I SIZE:

TITLE: Startup Report/Refueling Report (per Tech Specs)

NOTES:Standardized'lant. 05000530 S

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 1 1 LICITRA,E 2 2 DAVIS,M 2 2 A INTERNAL: ACRS 5 5 ARM TECH ADV 1 1 NRR CHATTERTON 1 1 NUDOCS-ABSTRACT 1 1 1 1 RES/DSIR DEPY 1 1 GN5 F LE 01 1 1 RGN2/DRSS/EPRPB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES 1 1 D

A .'>>

D)

S .

TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 21 V

Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX. ARIZONA85072-2034 161-01358-DBK/PGN October 5, 1988 Docket No. STN 50-530 Document Control Desk U.S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C. 20555

Reference:

1. Letter from E. E. Van Brunt, Jr., ANPP, dated April 6,, 1988 (161-00926).

Subject:

Unit 3 Startup Report.

2. Letter from E. 'E. Van Brunt, Jr., ANPP, dated July 1, 1988 (161-01148).

Subject:

, Unit 3 Startup Report Supplement 1.

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Startup Report Supplement 2 File! 88-001-404; 88-G-056-026 Attached please find thirty-six (36) copies of Supplement 2 to the Startup Report (reference 1) prepared and submitted pursuant to Specification 6.9.1.'3 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station Unit 3 Operating License. Supplement 2 covers the item that was open at the time Supplement l of the Startup Report (reference 2) was submitted, which is the CPC Verification and COLSS Verification.

This submittal closes out the PVNGS Unit 3 Startup Report. If you have any questions, please contact me.

Very truly yours, D. B. Karner Executive Vice President DBK/PGN/pvk Attachment CC ~ G. W. Knighton (all w/a)

T. L. Chan J. B. Martin (2 copies)

T. J. Polich A. C. Gehr INPO Records Center S8iOi20239 881005 05000530 PDR ADOCK P PDC

i+i