ML17304A574

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Apr 1986 for Palo Verde Unit 1
ML17304A574
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/13/1988
From: Bloom T
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17304A570 List:
References
NUDOCS 8809290354
Download: ML17304A574 (2)


Text

SHUTDOWNS AND POWER REDUCTIONS APRIL 1986 DOCKET NO.

50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY T. J.

Bloom No.

Date Type1 Duration Hours Reason2 Method of Shutting System Component Down Reactor LER No.

Code4 Codes Cause and Corrective Action to Prevent Recurrence 2

03/07/86 S

720 1-86-018-00 SJ PMC Reactor trip on low S/G level.

The unit entered scheduled surveillance test outage.

F-Forced S-Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error H-Other (Explain) 880 F9 PDR

~o~~~ 8809' R

DOCS 05000 PNUU Hethod:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20X or Greater in the Past 24 Hours 9-Other-(Explain)

Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)

Exhibit H-Same Source

n 1

N