UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 ARIZONA PUBLIC SERVICE COMPANY ET AL.
DOCKET NO.
STN 50-528 PALO VERDE NUCLEAR GENERATING STATION UNIT NO. I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
35 License No. NPF-41 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment, dated May 9, 1988, by the Arizona Public Service Company (APS) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric
- Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority (licensees),
complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Comnission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by a change to the Technical Specifications as indicated in the enclosure to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-41 is hereby amended to read as follows:
S808090152 8S0729 PDR
'ADOCK 0500052S P
~
I
~
3.
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
35, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of the date of issuance.
The changes in the Technical Specifications are to become effective within 30 days of issuance of the amendment.
In the period between issuance of amendment and the effective date of the new Technical Specifications, the licensees shall adhere to the Technical Specifications existing at the time.
The period of time during changeover shall be minimized.
FOR THE NUCLEAR REGULATORY COMMISSION
Enclosure:
Changes to the Technical Specifications Date of Issuance:
July 29> 1988 George
. Knighton irector Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects
ENCLOSURE TO LICENSE AMENDMENT AMENDMENT NO. 35 TO FACILITY OPERATING LICENSE NO. NPF-41 DOCKET NO.
STN 50-528 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
Also to be replaced is the following overleaf page to the amended page.
Amendment Pa e
3/4 6-21 Overleaf Pa e
3/4 6-22
TABLE 3.6-1 VALVE NUMBER PENETRATION NUMBER FUNCTION MAXIMUM ACTUATION TIME (SECONDS)
RDA-UY 023 9
RDB-UV 024 9
RDB-UV 407 9
SGB-HV 200 ll SGB-HV 201 12 SIA-UY 708 23 HCB-UV 044 25A HCA"UV 045 25A HCA-UV 046 25B r
HCB-UV 047 25B GAA-UV 002 29 GAA-UV 001 30 A.
CONTAINMENT ISOLATION (CIAS)
Containment radwaste sump pump to LRS holdup tank Containment radwaste sump pump to LRS holdup tank Containment radwaste sump post-accident sampling system Downcomer feedwater chemical
, injection Downcomer feedwater chemical injection Containment recirc sump to post-accident sampling system Containment air radioactivity monitor (inlet)
Containment air radioactivity monitor (inlet)
Containment air radioactivity monitor (outlet)
Containment air radioactivity monitor (outlet)
Nz to steam generator and reactor drain tank Nz to SI tanks 30 10 10 iNot Type C Tested PALO VERDE - UNIT 1 3/4 6-21 AMENDMENT NO. 35
TABLE 3. 6-1 (Conti nued) nlrr VALVE NUMBER PENETRATION NUMBER FUNCTION MAXIMUM ACTUATION TIME (SECONDS)
HPA-UV 001 35 HPA-UV 003 35 HPA-UV 024 35 HPB-UV 002 36 HPA-UV 005.
38 HPB-UV 004 36 HPA-UV 023 38 HPB-UV 006 39 CHA-UV 516 40 CHB-UV 523 40 CHB-UV 924 40 SSB-UV 201 42A A.
CONTAItNENT ISOLATION (CIAS)
(Continued)
Containment to hydrogen recombiner 12 Contafrment to hydrogen recoebfner 12 Ha control system Contafnoent to hydrogen recombiner 12 Containment to hydrogen recoabiner 12 H~ recombfner return to containment 12 (inlet)
Ha control system H> recowbfner return to containment 12 (inlet)
Letdown line from RC loop 2B to regenerative heat exchanger and letdown heat exchanger Letdown lfne froe RC loop 2B to regeneratfve heat exchanger and letdown heat exchanger Letdown line to post-accident sampling system Pressurfzer lfqufd sample line 5
SSA-UV 204 SSO-UV 202 SSA-UV 205 42B Pressurfzer liquid sample line Pressurizer steam ipace sample line Pressurizer steaa space sample line 5
SSB-UV 200 42C SSA-UV 203 42C Hot leg sample.lkne Hot leg sample line PALO VERGE - UNIT 1 3/4 6-22 AMENDMENT NO. 27
~g RfIII pe
~
p
'+
O~*0O I
Vr
~ w+
+~
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 ARIZONA PUBLIC SERVICE COMPANY ET AL.
DOCKET NO.
STN 50-529 PALO VERDE NUCLEAR GENERATING STATION UNIT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 22 License No.
NPF-51 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment, dated May 9, 1988, by the Arizona Public Service Company (APS) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric
- Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority (licensees),
complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comoission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by a change to the Technical Specifications as indicated in the enclosure to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-51 is hereby amended to read as follows:
O.
3.
(2)
Technical S ecifications and Environmental Protectior, Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
22, and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of the date of issuance.
The changes in the Technical Specifications are to become effective within 30 days of issuance of the amendment.
In the period between issuance of amendment and the effective date of the new Technical Specifications, the licensees shall adhere to the Technical Specifications existing at the time.
The period of time during changeover shall be minimized.
FOR THE NUCLEAR REGULATORY COMMISSION
Enclosure:
Changes to the Technical Specifications Date of Issuance:
July 29> l9BB George
. Knighton irector Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects
l li,
) ~
ENCLOSURE TO LICENSE AMENDMENT AMENDMENT NO.
'TO FACILITY OPERATING LICENSE NO. NPF-51 DOCKET NO.
STN 50-529 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised page is. identified by Amendment number and contains vertical lines indicating the area of change.
Also to be replaced is the following overleaf page to the amended page.
Amendment Pa e
3/4 6-21 Overleaf Pa e
3/4 6-22
J 4
~ ~
I 1
\\ l
TABLE 3.6-1 CONTAINMENT ISOLATION VALVES VALVE NUMBER PENETRATION NUHBER FUNCTION HAXIHUH ACTUATION TIME (SECONDS)
RDA-UV 023 9
RDB-UV 024 9
RDB-UV 407 9
SGB-HV 200 11 SGB-HV 201 12 SIA-UV 708 23 HCB-UV 044 25A HCA"UV 045.
25A HCA-UV 046 25B HCB-UV 047 25B GAA"UV 002 29 GAA-UY 001 30 A.
CONTAINMENT ISOLATION (CIAS)
I \\
Containment radwaste sump pump to 30 LRS holdup tank Containment radwaste sump pump to 5
LRS holdup tank Containment radwaste sump post-accident sampling system Downcomer feedwater chemical injection Downcomer feedwater chemical injection Containment recirc sump to post-accident sampling system Containment air radioactivity monitor (inlet)
Containment air radioactivity monitor,(inlet)
Containment air radioactivity monitor (outlet)
Containment air radioactivity monitor (outlet)
Nq to steam generator and reactor 10 drain tank Nq to SI tanks PNot Type C tested.
PALO VERDE " UNIT 2 3/4 6-21 AMENDMENT NO. 22
TABLE 3.6-1 (Continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER PENETRATION NUMBER FUNCTION NAXINUM ACTUATION TINE (SECONDS)
HPA-UV 001 35 HPA-UV 003 35 HPA"UY 024 35 HPB"UV 002 36 HPA-UV 005 38 HPB-UV 004 36 HPA-UV 023 38 HPB-UV 006 39 CHA-UV 516 40 CHB-UV 523 40 CHB-UV 924 40 SSB-UV 201 42A SSA-UV 204 42A SSB-UV 202 42B SSA-UV 205 42B SSB"UV 200 42C SSA-UV 203 42C Hot leg sample line Hot leg sample line o 5 A.
CQNTAIQKNT ISOLATION (CIAS)
(Continued)
Containment to hydrogen recombiner 12 Containment to hydrogen recombiner 12 Hs control system Contaireent to hydrogen recombiner 12 Containment to hydrogen recombiner 12 H2 recombiner return to containment 12 (inlet)
H2 control system H2 recombiner return to containment 12 (inlet)
Letdown line from RC loop 2B to regenerative heat exchanger and letdown heat exchanger Letdown line from RC loop 2B to regenerative heat exchanger and letdown heat exchanger Letdown line to post-accident sampling system Pressurizm liquid sample line Pressurizer liquid sample line Pressurizer steam space sample line 5
Pressurizer steam space sample line 5
PALO VERDE - UNIT 2 3/4 6-22
~S IIEoy
~4 PO
~y O0 I
3 II cT o~
Cp
~ ++**+
t UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ARIZONA PUBLIC SERVICE COMPANY ET AL.
DOCKET NO.
STN 50-530 PALO VERDE NUCLEAR GENERATING STATION, UNIT NO.
3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
11 License No. NPF-74 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment, dated May 9, 1988, by the Arizona Public Service Company (APS) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric
- Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority (licensees),
complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C;
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied, 2.
Accordingly, the license is amended by a change to the Technical Specifications as indicated in the enclosure to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-74 is hereby amended to read as follows:
3.
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
11, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of the date of issuance.
The changes in the Technical Specifications are to become effective within 30 days of issuance of the amendment.
In the period between issuance of amendment and the effective date of the new Technical. Specifications, the licensees shall adhere to the Technical Specifications existing at the time.
The period of time during changeover shall be minimized.
FOR THE NUCLEAR REGULATORY COMMISSION
Enclosure:
Changes to the Technical Specifications Date of Issuance:
July 29, 1988 George
. Knighton irector Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects
(
(
it t(
li
(
I
(
h t
I
ENCLOSURE TO LICENSE AMENDMENT AMENDMENT NO.
11 TO FACILITY OPERATING LICENSE NO. NPF-74 DOCKET NO.
STN 50-530 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
Also to be replaced is the following over leaf page to the amended page.
Amendment Pa e
3/4 6-21 Overleaf Pa e
3/4 6-22
~
I
TABLE 3.6-1 CONTAINMENT ISOLATION VALVES VALVE NUMBER PENETRATION NUMBER FUNCTION MAXIMUM ACTUATION TIME (SECONDS)
RDA-UV 023 9
RDB-UV 024 9
RDB-UV 407 9
SGB-HV 200 11 SGB-HV 201 12 SIA-UY 708 23 HCB-UV 044 25A HCA-UV 045 25A HCA"UV 046 25B HCB-UV 047 25B GAA-UV 002 29 A.
CONTAINMENT ISOLATION (CIAS)
Containment radwaste sump pump to 30 LRS holdup tank Containment radwaste sump pump to 5
LRS holdup tank Containment radwaste sump post-accident sampling system Downcomer feedwater chemical injection Downcomer feedwater chemical injection Containment recirc sump to post-accident sampling system Containment air radioactivity monitor (inlet)
Containment air radioactivity monitor (inlet)
Containment air radioactivity monitor (outlet)
Containment air radioactivity monitor (outlet)
Nq to steam generator and reactor 10 drain tank GAA-UV 001 30 Nq to SI tanks 10 SNot Type C tested.
PALO VERDE - UNIT 3 3/4 6-21 AMENDMENT NO.
11
TABLE 3.6-1 (Continued)
CONTAINMENT ISOLATION VALVES 0
VALVE NUMBER PENETRATION NUHBER FUNCTION HAXIHUH ACTUATION TIRE (SECONDS)
HPA-UV 001 35 HPA-UV 003 35 HPA-UV 024 35 HPB-UV 002 36 HPA-UV 005 38 HPB-UV 004 36 HPA-UV 023 38 HPB"UV 006 39 CHA-.UV 516 40 CHB-UV 523 40 CHB-UV 924 40 SSB-UV 201 42A
'SA-UV 204 42A SSB-UV 202 42B SSA-UV 205 42B SSB-UV 200 42C SSA-UV 203 42C A.
CONTAINMENT ISOLATION (CIAS)
(Continued)
Containment to hydrogen recombiner 12 Containment to hydrogen recombiner 12 Hz control system Containment to hydrogen recombiner 12 Containment to hydrogen recombiner 12 Hq recombiner return to containment 12 (inlet)
Hs control system Hq recombiner return to containment 12 (inlet)
Letdown line from RC loop 2B to regenerative heat exchanger and letdown heat exchanger Letdown line from RC loop 28 to regenerative heat exchanger and letdown heat exchanger Letdown line to post-accident sampling system Pressurizer liquid sample line Pressurizer liquid sample line Pressurizer steam space sample line 5
Pressurizer steam space sample line 5