ML17304A306
| ML17304A306 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/21/1988 |
| From: | Karner D ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17304A307 | List: |
| References | |
| 102-00873-DBK-T, 102-873-DBK-T, CAL, NUDOCS 8808050067 | |
| Download: ML17304A306 (4) | |
Text
SUBJECT:
Forwards special plant evaluation rept re detection correction of potentially incorrect RBD constants.
R I
DISTRIBUTION CODE:
ZE36D COPIES RECEIVED:LTR J ENCL J SIZE:
4 W I
TITLE: Immediate/Confirmatory Action Ltr (50 Dkt-Other Than Emergency Prepar D 05000529 NOTES:Standardized plant.
~ACCELERATED" DISTRIBUTION 'EMONS~10N SYSTEM REGULAT INFORMATION DISTRIBUTION sYSTEM (RIDE)
ACCESSION NBR:8808050067 DOC.DATE: 88/07/21 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION KARNER,D.B.
Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION MARTINFJ.B.
Region 5, Ofc of the Director RECIPIENT ZD CODE/NAME PD5 LA LICITRA,E INTERNAL: NRR DOEA/EAB 11 02 RGN5 FILE 01 EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
1 1
1
~ 1 1
1 1
RECIPIENT ID CODE/NAME PD5 PD DAVISFM NUDOCS-ABSTRACT RES/DSIR/EIB RGN2/DRSS/EPRPB NRC PDR
'OPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 13
0
RECElVEO fJ RC R
GJOJ Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX, ARl2ONA850+~
102-OOQ'3kkl85DSQ f 7 July 21, 1988 Hr. J.
B. Hartin U.S. Nuclear Regulatory Commission 1450 Haria Lane, Suite 210 Walnut Creek, CA 94596-5368
Subject:
Reference:
Dear Sir:
Palo Verde Nuclear Generating Staion (PVNGS)
Unit 2 Docket No.
STN 50-529 (License No. NPF-51)
Response
to Confirmatory Action Letter F'le:
88-056-026 Letter from J.
B. Hartin, NRC, to E.
E.
Van Brunt, Jr.,
- ANPP, dated June 23, 1988;
Subject:
Confirmatory Action Letter This letter is provided as requested by. the referenced letter concerning the introduction of nonconservative information into the Unit 2 Channel B Core Protection Calculator (CPC).
The attachment to this letter provides the investigation report of the event and the actions taken or to be taken to preclude recurrence.
As you will note the report indicates that additional research and evaluation is required to develop a methodology which will ensure detection and correction of potentially incorrect RDB constants under all conditions.
In addition, this report documents the verification of acceptable operation of the Unit 1
CPC channels.
On June 27,
- 1988, ANPP informed Hr. Kirsch, of your staff, that the results-of the CPC verification testing conducted in Unit 2 at the 70/ power level were satisfactory.
If you should have any questions concerning this information contact Hr. Timothy Shriver, of my staff, at (602) 393-3531.
Very truly yours, DBK/TDS/KLMC/kj Attachment cc:
E.
E.
J.
G.
G.
W.
E. A.
T. J.
A. C.
Van Brunt, Jr.
Haynes Knighton Licitra Polich Gehr 8808050067 88072i PDR ADQCK 05000529 P
PNU Donald B. Kar er Executive Vice President Project Director (all w/attachment) r~s>
li
0