ML17303B020

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Palo Verde Nuclear Generating Station, Unit 3 Startup Rept. Rept Contains Test Results of Fuel load,post-core Hot Functional Testing,Initial Criticality & Low Power Physics Testing & Power Ascension Testing
ML17303B020
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/06/1988
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17303B021 List:
References
161-00926-EEVB, 161-926-EEVB, NUDOCS 8804150023
Download: ML17303B020 (4)


Text

&95.IDPEMBToPPU%~~'2"-. K~>E" ACCESSION NBR:8804i50023 DOC. DATE: 88/04/06 NOTARIZED:

NO DOCKET 4 FACIL S(N-50-530 Palo Verde Nuclear Stationd Unit 3. Arizona Pub li 05000530 AUTH. NAME AUTHOR AFFILIATION VAN BRUNTe E. E.

Arizona Nuclear Power ProJect

( formerly Ari zona Public Serv RECIP. NAME."

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Foruiarde Rev 0 to "Palo Verde Nuclear Generating Station Unit 3 Startup Rept. "

d t

DISTRIBUTION CODE:

IE26D COPIES RECEIVED: LTR ENCL + SIZE: +

TITLE: Startup Report/Refueling Report (per Tech Specs)

I NOTES: Standardized plant.

RECIPIENT ID CODE/NAME PD5 L*

LICITRAIE INTERNAL: ACRS CHATTERTON REG F

02 N5 P

E 01 EXTERNAL:

LPDR NSIC e

COPIES LTTR ENCL 1

0 2

2 5

5 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD5 PD DAVISe M ARMI TECH ADV NRR/PMAS/ILRB12 RES/DRPS DIR RGN2/DRSS/EPRPB NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

050005+

S A.

NOTES:

R I

S h

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 21

4>

~ Dl~

>~

Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX. ARIZONA85072-2034 Docket Nos.

STN 50-530 161-00926-EEVB/PGN April 6, 1988 U.

S. Nuclear Regulatory Commission Washington,

.D.

C.

20555 ATTN: Document Control Desk Subj ect:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Startup Report File: 88-001-404; 86-056-026

Dear Sirs:

Attached please find the Startup Report prepared and submitted pursuant to Specification 6.9.1.2 of Appendix A (Technical Specification) to the Palo Verde Nuclear Generating Station, Unit 3 Operating License.

The report contains the test results of Fuel Load, Post-Core Hot Functional Testing, Initial Criticality, Low Power Physics Testing, and Power.Ascension Testing.

There are two minor items that are open:

as noted in the report.

These items will be addressed in Supplement 1 to the Startup Report, to be submitted by July 6,

1988.

The items concern Section 6.10, "Main and Emergency Feedwater Systems Test" and Section 6.11, "CPC Verification and COLSS Verification".

If you have any questions, please contact Mr. A. C. Rogers at (602) 371-4041; Very truly ours n~<

E.

E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/PGN/ls Attachment cc:

J.

B. Martin (all w/a)

G.

W. Knighton E. A. Licitra T. J. Polich A.

C.

Gehr NRC DCD (36 copies)

INPO Records Center 8804l50023 880406 PDR ADQCK 05000530 P

DCD

III

>4 I