ML17303A849

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1988
ML17303A849
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/29/1988
From: Haynes J, Hull J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
212-00136-JGH-T, 212-136-JGH-T, NUDOCS 8803160184
Download: ML17303A849 (38)


Text

REGULATORY INFORMATION DIS I TION SYSTEM (RIDS) 1$

8-W1URTII FACIL:STN-50-528 Palo Verde Nuclear Station, Unit. 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION HULL,J.L.

Arizona Nuclear Power Project (formerly Arizona Public Serv HAYNES,J.G.

Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Feb 1988. /880315 DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR NC TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Standardized plant.

Standardized plant.

Standardized plant.

SIZE:

05000528 S

05000529 05000530 g RECIPIENT ID CODE/NAME PD5 LA LICITRA,E INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB11B 10A REG FIL 01 EXTERNAL EG6G GROH i M NRC PDR NOTES COPIES LTTR ENCL 1

0 1

0 10 10 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DOA ARM TECH ADV NRR/DOEA/EAB11E NRR/PMAS/ILRB12 RGN5 LPDR NSIC COPIES LTTR ENCL 5

5 1

0 1

1 2

2 1

1 1

1 1

1 1

1 1

1 A

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 33 ENCL 30 v

~

g~

'4 g

~

~

~

~'RC

'MONTHLY QPERATINB REPORT DOCKET NO.

UNIT NAME DATE CONPLETED BY TELEPHONE 50-5/8 PVNBB-1 03/07/88 J,L, Hull 602-393-2679 OPERATINB STATUS

\\

i.

2 ~

3' 5 0 6.

7 5 8 ~

10.

Unit Name:

Palo Verde Nuclear Generating Station~ Unit Reporting Period."February 198$

Licensed Thermal Power (MWt): 3800 Nameplate Rating (Brass MWe):

1403 Design Electrical Rating (Net MWe>:

.1270 Naximum Dependable Capacity (Gross NWe):

1303 Naximum Dependable Capacity (Net NWe):

1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Repart, Give Reasans:

Power Level, ta Which Restricted, If Any (Net MWe>c NONE Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumul at ive "OCO c)m, ZO 4) 3>0'O C)v nm W4 I

00);

Vl(0 l OO,,

aoM 0 Vl<

aM (0

L I

11

~

12 13.

14

'5.

1,6.

17.

19.

,20.

21 ~

24.

1440 Hours in Reparting Period 696 Number of Hour s Reactar Was Critical',0 Reactor Reserve Shutdown Hours Oe0 I

Hours Beneratar On-Line Unit Reserve Shutdown Hours 0.0 Brass Thermal Energy Generated (NWH>

0. 0 Brass Electrical Energy Generated (NWH) 0,0 Net Electrical Energy Gener ated (NWH>

0,0 Unit Service Factor 0,0/

Unit Availability Factor 0.0/

Unit. Capacity Factor (Using MDC Net)

0. 0/

Unit, Capacity Factor (Using DER Net>

Unit. Forced Outage Rate 100,0/

Shutdowns Scheduled Over Next 6 Nonths aW Each)."Currently in r ekueling shutda 0.0 977. 2

.0.0 0.0 9 717.1 0.0 0 ~ 0

~

35~032~$ 3Z 0.0 0.0 ig 143~~00 11 327 925.

53,1/

53. 1/

0.0 0,0/

0. 0/
0. 0/
50. 7/
0. 0/

"'8. 7/

100. 0/

30. 6/

(Type, Dat e, and Durat ian wn Units in Test Status (Priar To Cammercial Qperatian):

INITIALCRITICALITY INITIALELECTRICITY CQNMERCIAL OPERATION Forecast 5/85 11/85 Achieved 5/>5/85 6/10/S5 1/28/86

~>v'~(

If Shutdown At End a+ Report Period, Estimated Date aW Btartup:

03/05/88

~

~

REFUELING INFORNATION DOCKET NO.

UNIT.

DATE CONPLETED BY

, TELEPHONE PVNGS-i 03/07/BB J.L. Hull 602-393-2679 1.

Scheduled date far next refueling shutdawn.

. 02/24/89 2.

Scheduled date far restart follawing refueling.

05/04/89 Will refueling ar resumptian ur operation thereafter require a

Technical Specification change ur other license amendment' Ta be determined 4.

Scheduled date for submitting prapased licensing action and supporting infar matian.

Tu be determined Important Licensing considerations associated with refueling,

e. g.

new ur different fuel design ur supplier, unrevi ewed design

, ar per fur mance analysis

methods, significant changes in fuel
design, new operating procedures.

To be determined

. 'EFUELINB INFORMATION DOCKET NO.

50-528 UNIT PVNBS-1 DATE 03/07/BB COMPLETED BY J.L. Hull TELEPHONE 602-393-2679 (Continued)

The number oW Wuel assemblies.

a)

In the core.

24i 7%

b)

In'the spent fuel storage pool.

Licensed spent.

Wuel storage capacity.

1329 Intended change in spent.

Wuel storage capacity.

Mane Projected date of last. refueling that can be discharged to spent cruel storage pool assuming present capacity.

2006 (iB Months reloads and ahull core discharge capability).

[I l

I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-528 PVNGB-i 03/07/88 J. L, Hull 602-39K-2679 MQNTH:

FRI3l UBI Y l988 DAY AVERAGE DAILY POWER LEVEL 0

DAY AVERAGE DAILY POWER LEVEL 18 0

0 0

0 io 0

30 31

~

~

SUNNARY OF OPERATINS EXPERIENCE FOR THE MONTH February 1988 DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-528 PVNBB-1 03/07/88 J.L. Hull 6b2-393-2679 02/01 0000 02/02 1122 Unit in Node 5.

Entered Nude 6 ta investigate mechanical binding af CEA 856 02/20 1530 Entered Nade 5

02/29 02/29 1635 Entered Nude 4

2400

. Unit in Nade 4

fa N

II jH II

UNIT SHUTDOWNS AND POWER REDUCTIONS XC UNIT NAME:

PVNGS-1 FWIVIES Method of Duration Shutting 3

System<

Component>

No.

Date Type

.Hours Reason Down Reactor LER NO.

Code Code Cause and Corrective Action to Prevent Recurrence 10 Cont'd F

696 Unit Shutdown to repair. an inoperable Control Element Assembly.

1 F-Forced S-Scheduled 2 Reason:

h-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-hdministrative G-Operotional Error (Explain)

.M-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-hutomatic Scram 4-Continuation from Previous Month 5-Reduction of 20Z or Greater in the Post 24 Mours O-Arbor (Exnlntn) 4 Exhibit F - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (ttUREG 0161) 5 Exhibit M-Same Source

NRC MONTHLY QPERATINS REPORT DOCKET NQ.

UNIT MANE DATE CQNPLETED BY TELEPHONE PVNSB-2 03/07/88 J.L, Hull 602-393-2679 OPERATINS STATUS is 2s 3 ~

4.

5 0 6.

7 ~

8 ~

10.

Unit Name:

Palo Verde Nuclear Seneratina Station Unit 2 9

k.

Reparting Period:

February 1988

, Licensed Ther mal Pawer

<NWt.):

ZBOO Nameplate Rat ing (Sr ass NWe) c 1403 Design Electrical Rating (Net NWe):

1270 Naximum Dependable Capacity (Srass NWe):

130K Maximum Dependable Capacity (Net. NWe):

1221 r

If Changes Occur In Capacity Ratings (Items Number 7 Thraugh 7)

Since Last Repart, Give Reasons:

Power Level ta Which Restricted, If Any (Net NWe):

NONE Reasons Far Restrictions, If Anyc This Month Yr.-ta-Date Cumulative 11 ~

f2.

14.

15.

16.

17.

18.

19.

20.

2f ~

22 ~

1 711 979.

60K 800.

560 018.

65,8/

65. 8/

Hours in Reparting Period 696 Number of Haurs Reactor Was Critical 458 Reactor Reserve Shutdown Hours 0

Hours Generator On-Line 458 Unit Reserve Shutdown Haurs 0

Brass Thermal Energy Sener ated (NWH)

Brass Electrical Energy Generated (NWH)

Net. Electrical Energy Senerated (NWH)

Unit. Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net.)

65,9/

Unit. Capacity Factor (Using DER Net) 63,4/

Unit Forced Outage Rate 0.0/

Shutdowns Scheduled Over Next. 6 Months Xur renal y ie.8e fue.l-in9-0uta98 1440 12 696 10 477.1 1202 10 328. 2 4 508 600.

588 100.

ff' 1 487 775.

83. 5/

a

~

8~,5/

84. 6/

37 715 767 13 249 370 i2~4>4~657 81

~ 4/

81. 4/
80. 1/
81. 4/
77. 1/
0. 0/
5. 9/

<Type, Date, and Durat ian If Shutdawn At. End of Report Peri,ad, Estimated Date of Startup:

05/15/88 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Units in Test Status (Prior Ta Commercial Qperat.ian):

I Fol ecast 2/86 6/86 ff/86 Achieved 4/18/86 5/20/86 9gl9$86

I, 0

REFUEL1NS INFORMATION DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE PVNBS-2 03/07/BB J.L. Hull 602-393-2679 i.

Srheduled date far ne.'<t relueling shutdown.

0?/23/89 2.

Scheduled date for restart following relueling.

i2/Oi/B9 Nill refueling ar resumptian or operation thereafter require a

Technical Specification change ar other license amendment,'?

Ta be determined 4.

Scheduled date Wor submitting proposed licensing action and supporting in$ormation.

Ta be determined 5.

~ Important Licensi'ng cansiderat,ians associated with refueling, e.g.

new or di$ Werent cruel design ar supplier, unreviewed design ar performance analysis

methods, signiWicant changes in'uel
design, new operating procedures.

To be determined

0 q

REFUELING INFORMATION DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-529 PVNGB-2 03/07/88 J,L. Hull 602-:393-2679 (Cantinued>

The number uW Wuel assemblies.

7%

a>

In the car e.

241 b>

In-the spent Wuel storage paul.

Licensed spent Wuel starage capacity.

1329 Intended change in spent Wuel storage capacity.

Mane Projected date aW last relueling that can be discharged tn spent cruel storage pual assuming present capacity.

2006 (18 Months reloads and ahull care discharge capabi)ity>.

(

y

~ z

AVERABE DAILY UNIT POWER LEVEL DQCKET NQ.

UNIT DATE COMPLETED BY TELEPHONE 50-529 PVNBB-2 03/07/88 J.L, Hull 602-393-2679 MONTH:

Februarv 1988 DAY AVERAGE DAILY PQWER LEVEL DAY AVERABE DAILY POWER LEVEL 2'7 1 239 1 gi4 18 1~260 5

1~256 22 0

'0 7

1~260 8

1~256 1 260 23 0

0 10 1 252 11 1 252 27 0

12 1~243 13 1 239 14 30 1~227

SUNNARY OF OPERATINB EXPERIENCE FOR THE NONTH DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE PVNHS-2 OZ/O7/a8 JUL. Hull o

February 1988

.02/01 02/12 0000 Unit in Node 1

Reactor Power 100/.

Unit 2 commenced a power coastdown due to the pending refuel ing.

02/19 02/1'7 02/20 02/20 02/21 2330 0202 1554 0516 02/29 '400 Reactor power at 71/.

Reactor power a6 62/.

Nain Turbine tripped/Reactor tripped, Unit in Node 3 Entered Node 4

Entered Node 5 Unit in Node 5

[

~

a I

UHlT SIIUTDOMHS hHD POMER REDUCTIONS c<<a~

UNIT HAIIE:

PVNGS-.2 COHPLI",KD 13Y:

Hethod of Duration SIIutting Systera Component Ho.

Date Type

.Ilours Reason Down Reactor LER NO.

Code Code Cause and Corrective Action to Prevent Recurrence 2

02/20 S

238

'/A N/A N/A Unit shutdown due to Refue1ing Outage.

Y-Forceful S-Schcilul c I 2 Rcnson:

A-l!qulpmcnt Fallurc (Explain)

D-Hnlntcnnncc or Test C-Refueling D-Regulatory Restriction F;Operntor Trolnlng 8 License Fxamlnation F-Aitmlnlstrnt Ivc I'-Opcrnt Ionnl Frror (Fxplsin)

~II Ot her (Explain)

Hothead t 1-Hanual 2-Hanual Sera~

3-Automatic Scram 4-Contlnuatlon from l'rcvious Honth 5-Reduction of 20Z or Greater in the Past 24 llours O-OI her (Exnln ln)

Exhibit: F - Instructions for Preparation of Data Entry'Sheets for Licensee Event Rcport (LER) File (IIUREC OIGI) 5 Exhibit ll-Same Source

r

NRC NONTHLY OPERATING REPORT DOCKET NQ.

UNIT NANE DATE CONPLETED BY TELEPHONE 50-53b PVNBS-3 03/07/88 J,L, Hull 602-393-2679 QPERAT INB STATUS i.

2%

3 I 4.

5.

6.

7 ~

8.

10.

Unit Name:

Palo Verde Nuclear Generating Station~ Unit Reparting Period:

February i9SB Licensed Thermal Power (NWt)".3800 Nameplate Rating (Brass NWe>:

1403 Design Electrical Rating (Net NWe>:

1270 Naximum Dependable Capacity (Brass MWe>:

1303 Naximum Dependable Capacity (Net NWe)".

1221 IW Changes Occur In Capacity Ratj.ngs (Items Number 3 Thraugh 7)

Since Last Report, Give Reasons:

Pawer Level tu Which Restricted, IW Any (Net MWe)c NONE Reasons Fnr Restrictions, IW Any:

Thi s Nunth Yr.-ta-Date Cumul at ive 12.

13 ~

14.

~

15.

1,7.

18.

1.9.

20.

21

~

23.

24.

Hours in Reparting Period Number o$ Hours Reactnr Was Critical Reactor Reserve Shutdown Hours Hours Seneratar On-Line Unit Reserve Shutdown Hours Brass Thermal Energy Generated (MWH>

Grass Electrical

Energy, Generated (MWH>

Net Electr ical Energy Generated (MWH)

Unit Service Factar Unit. Availability Factor Unit Capacity Factor (Using NDC Net)

Unit Capacity Factor (Using DER Net)

Unit Farced Outage Rate Shutdawns Scheduled Over u$ Each):

None IW Shutdown At, End o$

Rep N/A 1 272 1/72 1272 696. 0 1272 0

0 0

4 776 216.0 4 776 216.

2 603 103.

1 686 600.

J k.

1 686 60b.

921 700.

1 596 758.

100,0/

100.0/

0 1~596~758.

100. 0/

10O.O/.

872 225.

~A A 100.0/

100.0/

102,8/

98. 8%

102. 6'/

102.8/

98. S/

98,7/

0 Next 6 Nant.h (Type, Date, and Duration art Period, Estimated Date uW Startup:

Units in Test Status (Prior Tu Commercial Operation)<

INITIALCRITICALITY INITIALELECTRICITY CONNERCIAL OPERATIQN 07/87 07/87 09/87 Qchieved 10/25/87 ii/gB/87 01/08/88

S I

1

REFUEL INB INFORMATION DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-530 PVNGS-3 03/07/81 J.L. Hull 602-393-2679 Scheduled date Nor ne:<t re+ueling shutdown.

02/25/8'P Scheduled. date +or restart following relueling.

05/05/89 Will refueling or resumption or operation thereafter require a

Technical Speci%ication change or other license amendment' Not Yet Determined 4,

What will these be' Not Yet Determined II, Scheduled date for submitting proposed licensing action and supporting inWormation.

Not Yet Determined Important Licensing considerations associated with refueling, e.g.

new or diWferent +uel'esign or supplier, unreviewed design or pet Wor mance analysis

methods, signiWicant changes in fuel
design, new operating procedures.

Not Yet Determined 6.

The number oW fuel assemblies.

a>

In the core.

241 b>

In the spent fuel storage pool.

0

7. 'icensed spent fuel storage capacity.

i329 Intended change in spent Wuel storage capacity.

None Projected date of last refueling that can be discharged to spent Wuel storage pool assuming present capacity.

2007 (18 Months reloads and full core discharge capability>.

II 1

T

AVERABE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE SO-530 PVNBB-3 03/07/88 J. L. Hull 602-3'P3-267'P MONTH: Februarv 1988 DAY AVERABE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 15 1 272 1~264 4

1 260 17 1 272 6

1 201 7

268 19 l 272

.20 1 272 5

21 1 272 1~072 10 1~089 11 1 268 12 1~276 1Z 1 272 23 1 272 1 ~264 26 1 264 27 1 264 A

15 1 272 2'7

~

1 264

il t

SUMMARY

OF OPERATINB EXPERIENCE FOR THE MONTH DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-530 PVNSS-3 OZ/07/88 J,L, Hull 602-393-267'P February 1988 02/01 02/.OV 0000 1045 Unit in Mode 1

Reactor Power 100/.

Power reduct.ion to 70/ to Six leak on Main Feed Water Pump "A"~

02/O'P 02/10 02/29 1128 02/10 0730 Reactor power at 70%.

Started power increase.

Reactor power at 100/.

Unit. in Mode 1

Reactor Power 100/.

~

~

UHlT SllUTDOWNS AHD POWER REDUCTIONS

/

DOCKET NO:

50 53 UNIT NAHE'.

DATE: 03 07 88, COHPLETED Dr: J.L. Hull TELEPllONE: 602-393-2679.

Hethod of Duration Shutting System<

Component>

Ho..

Date Type llours Reason Down Reactor LHR NO.

Code Code Cause and Corrective Action to Prevent Recurrence 1

02/09 F

N/A A

5 Power reduction to 70X in order to repair Main Feed Hater Pump leak.

~ '

F-Forced S-Scheduled 2 Reason:

A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Liccnsc Examination F-'Adminlstrntivc G-Opcrationnl Error'Explain)

.II-Other (Explain) r 3 Methods I-I!annal 2-Manual Scram 3-Automatic Scram 4-Continuation from I'rcvious Month 5-Reduction of 20X or Greater in thc Past 24 llours I-Other (Exnlnln'I Exhibit F - Instructions for Preparation of Data Entry Shccts for Licensee Event Rcport (LER) File (IIUREO OI61)

Exhibit It-Same Source

p

~

I

{

I (

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX, ARIZONA85072-2034 212-00136-JGH/TJB March 15, 1988 Docket Nos.

STN 50-528/529/530 U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Document Control Desk Gentlemen:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1.

2 and 3

February Monthly Operating Report File:

88-024-404/88-056-026 Attached are the February Monthly Operating Reports prepared and submitted pursuant to Specification

6. 9. 1. 6 of Appendix A

(Technical Specifications) to the Palo Verde Nuclear Generating

Station, Units 1,

2 and 3 Operating Licenses.

By copy of this letter, we are also forwarding a

copy of the Monthly Operating Reports to the Regional Administrator of the Region V Office.

If you have any questions, please contact Mr. T. J.

Bloom, at (602) 371-4187.

Very tru y yours, 9&

~4 J.

G.

Ha nes Vice President Nuclear Production JGH/TJB/ksr Attachments cc:

0.

M. DeMichele (all w/a)

E.

E.

Van Brunt, Jr.

J.

B. Martin E.

A. Licitra A.

C ~

Gehr J.

A. Amenta INPO Records Center

L

~

'(

g