ML17303A843
| ML17303A843 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/04/1988 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 161-00858-EEVB, 161-858-EEVB, NUDOCS 8803150280 | |
| Download: ML17303A843 (22) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS>'CCESSION NBR:8803150280 DOC. DATE: 88/03/04 NOTARIZED: YES DOCKET FACIL:STN-50-530 Palo Verde Nuclear Stations Unit 3i Ar'izona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION VAN BRUNT'. E.
Arizona Nuclear Poeer Prospect (formerly Ar izona Public Serv RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Lists items re confirmation of completion of post accident sampling sos license conditions. License Condition
- 2. C.
Supplement 1 to NUREG-0737 requirements Zc PVNGS Operating License NPF-b5 discussed in encl.
DISTRIBUTION CODE:
A003D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: OR/Licensing Submittal:
Supp l 1 to NUREG-0737(Generic Ltr 82-33)
NOTES: Standard i zed plant.
05000530 INTERNAL:
REC IP lENT ID CODE/NAME PD5 LA LICITRAiE FMB R
01 RES/DRPS DIR COPIES LTTR ENCL 1
1 1
1 0
1 1
RECIPIENT ID CODE/NAME PD5 PD DAVIS> M NRR/DLP8/HFB 10D RES/DE/EI B COPIES LTTR ENCL 7
7 1
1 1
1 EXTERNAL:
LPDR NSIC 1
1 1
1 NRC PDR NOTES:
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL 18
41 r
~
"I~
-l H
4 H
HI 4
4 'H a I
lt '
I IIt hI II I
I Cf
).iI'hh IA
..T I g m *4I v.=
i,'
'44 'il'th
\\
,I I "4
I~
HI tt I'hh 4 P
Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 Docket No.
STN 50-530 161-00858-EEVB/JBK March 4, 1988 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.
20555
References:
(1)
Letter from U.S.
NRC to ANPP
(
Subject:
- PVNGS, Unit 3
Issuance of Facility Operating License No.
NPF-65; dated March 25, 1987).
(2)
Letter from ANPP to U.S.
NRC
(
Subject:
Confirmation of Completion of Unit 3 License Conditions and Attachment 1 to the License, 161-00592-EEVB/
JMQ; dated October 19, 1987).
Dear Sirs:
Subj ect:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Confirmation of Completion of Unit 3 Post Accident Sampling (PASS) License Conditions File:
88-F-056-026 88-C-056-026 Syst: em Reference (1) contained the PVNGS Unit 3 Operating License No. NPF-65 and identified items which are 'equired to be completed prior to 5%
power.
Reference (2) contained confirmation of several License Conditions, and indicated the items associated with the Unit 3 PASS would be sent under a
future cover letter.
This letter is being transmitted to indicate all items in Reference (1) related to PASS are complete and PASS was operable prior to exceeding 5S power.
Specifically, the following two items are discussed in the
Attachment:
(1)
License Condition 2.C.(5):
Supplement No.
1 to NUREG-0737 Requirements.
(2)
Attachment 1 to PVNGS Unit 3 Operating License NPF-65, Item 3.
If you have any questions or require additional information, do not hesitate to call.
SS0S>502S0 SS0Soe PDR ADOCK 05000530 P
PDR'EVB/JBK/dim Attachment Very truly yours PF. ~i E.
E. Van Brunt, Jr.
Executive Vice President Project Director ping
'lI.
0
-pl c: e'
U. S. Nuclear Regu ory Commission Page 2
1000858-EBVB/JBK March 4, 1988 cc:
0.
M. DeMichele A. C. Gehr T. J. Polich J.
B. Martin G.
W. Knighton E. A. Licitra (all w/a)
Cl
~t
STATE OF ARIZONA
)
) ss.
COUNTY OF MARICOPA)
I, Edwin E.
Van
- Brunt, Jr.,
represent that I am Executive Vice President Project Director of Arizona Nuclear Power
- Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
- contents, and that to the best of my knowledge and belief, the statements made therein are true.
~'A
(
Edwin E. Van Brunt, Jr.
Sworn to before me thin~day of 1988.
Notary Publi My Commission Expires:
IB Cammir1pn Explwpilpril6, 1991
11
. il
"'<lp l
('
ATTACHMENT CONFIRMATION OF COMPLETION OF'ONDITIONS CONTAINED IN PVNGS UNIT 3 OPERATING LICENSE, NO'. 'NPF-65 (1)
License Condition 2.,C;(5) states "APS shall complete the requirements of Supplement No.
-1 to NUREG-0737 in accordance, with 'the schedule specified in ANPP letter '40173'ated'ebruary 20, 1987,.'"
Attachment 2
of the February 20, 1987 letter listed the following Regulatory Guide 1.97 Instrumentation with corresponding completion, dates which are related to PASS:
VARIABLE SCHEDULE FOR COMPLETION Analysis of Primary Coolant Prior to 5% Power Primary Coolant and Sump Samples Prior to 5% Power Containment Air.Sample Prior to 5%, Power In accordance with License Condition. 2.C.(5),
ANPP confirms completion and operability of the above listed items associated with NUREG-0737 Supplement 1 prior to exceeding 5% power in accordance with Reference (1).
(2)
Attachment 1
to PVNGS Unit 3'perating License NPF-65.
Item 3 requires "the post accident sampling system shall.be operable prior to exceeding 5%
power."'n accordance with the above item, ANPP states the Unit 3 PASS system was operable prior to exceeding 5S power in accordance with Reference (1).
4l 4
I
ID February 26, 1988
'DISTRIBUTION'Docket File-j PDR LPDR'D 5 Rdg JLee DOCKET-NO(S).
STN 50-530 Mr E. E. Van Brunt, Jr.
Executive Vice President Arizona Nuclear Power Pro5ect P
0 Box 52034 Phoenix,. Arizona 85072-2034
SUBJECT:
ARIZONA PUBLIC SERVICE COMPANY>> ET'AL PALO VERDE NUCLEAR GENERATING STATION>> UNIT 3 j
l F The following, documents concerning: our.review of the subject facility are transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental. Stat~ment, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
dated
'Environmental Assessment and Finding of No Significarit:Impact, dated Notice of Consideration of Issuance of.Facility. Operating License or Amendment to Faci1 ity Operating
- License, dated
{Q Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No igloo
<<* d<<
id i
.d d~l fll Exemption, dated I%
Construction Permit No.
CPPR- ",, Amendment No.
dated Facility Operating LicenseNo, Amendment No.
dated Order Extending Construction Completion Date, dated Monthly Operating Report for
'ransmitted by letter dated Annual/Semi-Annual Report-transmitted by letter dated
Enclosures:
As stated Office of Nuclear Reactor Regulation cc:
See next page OFFICE)
SURNAME/
OATEN
~ ~ ~
/XÃ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~
~ ~
'2 88 1 ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~ ~ ~ ~ ~
~
~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~
~ ~ ~ ~
HRC FORM 3I8110i80I NRCM 0240 OFFlCIAL RECORD COPY
41
~
~
~
~
~
/
Hr.
E.
E.
Van Brunt, Jr.
Arizona Nuclear Power Project Palo Verde CC Arthur. C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center Phoenix,.Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. Tim Polich U.S. Nuclear Regulatory Commission P. 0.
Box 97 Tonopah, Arizona 85354-0097 Regional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Mr. Ron Rayner P. 0.
Box 1509
- Goodyear, AZ 85338 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814
il Il
'4
Chairman Arizona Corporation Commission Post Office Box 6019 Phoenix, Arizona 85003 Arizona Radiation Regulatory Agency ATTN:
Ms. Clara Palovic, Librarian 4814 South 40 Street Phoenix, Arizona 85040 Mr. Charles Tedford, Oirector Arizona Raaiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors ill South Third Avenue Phoenix, Arizona 85003
ik.
.~ e
'4
0'December 24, 1987 C
DJSTRIBUTION I Docket PDR LPDR PD 5 Rdg JLee DOCKET NO(S)..
STN 50 530'r.
E. E. Van Brunt>>,Jr Executive Vice President.
Arizona Nuclear Power Prospect P 0 Box 52034 Phoenix, Arizona 85072-2034 S
ARIZONIA'UBLICSERVICE COMPANY>> ET AL PALO VERDE NUCLEAR GENERATING STATION>> UNIT 3 The following documents concerning.our review of the subject facility are transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statem'ent, dated Notice of Availability of Draft/Final Environmental Statement, dated
'Safety Evaluat'ion Report, or Supplement No.
dated 1
Environmental
'Assessment and Finding. of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating
- License, dated txj Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No R ii <<* d,C i
i;.: d~f fll Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
dated Facility Operating License No.:: '-, 'Amendment No.
dated 4
Order Extending Construction Compl'etion Date, dated tlonthly Operating Report for transmitted by letter dated Annual/Semi-Annual Report-transmitted by letter dated Encl osures:
As stated Office of Nuclear Reactor Regulation cc.
See next page OSSICE$
j SURNAME/
DATE1 DR
/PD5
~ ~ ~ ~
~ ~
~ ~ ~
~ ~
'J '4
~
~
~
~ ~ ~ ~
~
127.24/"""
~
~ ~ ~ ~ ~
~ ~ ~
~ ~ ~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~
~
i ~
~ ~ ~
0 ~
~ ~ ~ ~ ~ ~ ~
~ ~
~ HRC FORM 318 RDI80) HRCM 0240 OFFICIAL RECORD COPY
~
~
~
h
Hr. E.
E.
Van Brunt, Jr.
Arizona Nuclear Power Project Palo Verde CC:
Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Hr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Hr. Hark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Hr. Jay Ball U.S. Nuclear Regulatory Commission P. 0.
Box 239 Arlington, Arizona 85322 Regional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 8 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Hs.
Lynne Bernabes Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Hr. Ron Rayner P. 0.
Box 1509
- Goodyear, AZ 85338 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814
+PAL t \\
4\\@I Chairman Arizona Corporation Ceanission Post Office Box 6019 Phoenix, Arizona 85003 Arizona Radiation Regulatory Agency ATTN:
Hs. Clara Palovic. Librarian 4814 South 40 Street Phoenix, Arizona 85040 Mr. Charles Tedford, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors 111 South Third Avenue Phoenix, Arizona 85003
"ll 4l.
t