Forwards Special Insp Repts 50-528/88-07,50-529/88-07 & 50-530/88-07 on 880127-29.Violations Noted.Concerns Re Numerous Checking & Testing Requirements of Program Expressed
ML17303A823
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/24/1988
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17303A824 List:
References
EA-88-062, EA-88-62, NUDOCS 8803140221
Download: ML17303A823 (5)


See also: IR 05000528/1988007

Text

ACCELZRATZD

DISI'RIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR-8803140221

DOC.DATE: 88/02/24

NOTARIZED: NO

DOCKET

N

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

05000528

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

MARTIN,J.B.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

VAN BRUNT,E.E.

Arizona Nuclear Power Project (formerly Arizona Public Serv

SUBJECT:

Forwards Special Insp Repts 50-528/88-07,50-529/88-07

&

50-530/88-07

on 880127-29.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Standardized

plant.

Standardized

plant.

Standardized

plant.

05000528

S

05000529

05000530 j

RECIPIENT

ID CODE/NAME

PD5

PD

DAVIS,M

RNAL: ACRS

DEDRO

NRR/DLPQ/PEB11B

NRR/DOEA DIR11E

NRR/DREP/RPB10A

NRR/PMAS/ILRB12

OGC 15-B-18

RES/DRPS

DIR

EXTERNAL: LPDR

NSIC

NOTES

COPIES

LTTR ENCL

1

1

2

2

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

LICITRA,E

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB10A

NRR/DREP/EPB10D

NRR/DRIS DIR9A2

OFgcJ IIQ3ERMAN,J

~G~Lg)

02

RGN5

FILE

01

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

R

I

S

A

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

27

ENCL

27

FE~ "4

19tlo

EA-88-62

Docket Nos.

50-528,

50-529,

50-530

Arizona Nuclear

Power Project

P.

0.

Box 52034

Phoenix,

Arizona

85072-2034

Attention:

Mr.

E.

E.

Van Brunt, Jr.

Executive Vice President

Gentlemen:

SUBJECT:

NRC INSPECTION

OF

PALO VERDE UNITS 1, 2,

AND 3

0

This letter refers to the special

inspection, conducted

by Messrs.

A. Johnson

and

S.

Richards of this office, on January

27 through, January

29, 1988, of

activities authorized

by

NRC License

Nos.

NPF-41,

NPF-51,

and NPF-74,

and to

the discussion

of our findings held with members of your staff at the

conclusion of the inspection.

The purpose of the inspection

was to review the

circumstances

leading

up to your rendering inoperable

the turbine driven

Auxiliary Feedwater

Pumps in both Units 1 and 2,

as described

in Licensee

Event Report 50-528/87-025.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Several violations of NRC requirements

were identified within the scope of

this inspection.

These violations will be the subject of separate

correspondence.

We are concerned that the numerous

checking

and testing requirements

of your

programs

apparently failed to identify the engineering error which led to the

inoperability of the Auxiliary Feedwater

Pumps.

Our concern is further

heightened

by a recent event at Unit 2, wherein the non-safety electric

Auxiliary Feedwater

Pump discharge

valve was erroneously left in the closed

position for several

weeks.

Although we have not yet completed our review of

this latest event,

indications are that this error also went undetected

by the

independent

checks

required

by your programs.

We wish to discuss

both events

in detail at our management

meeting scheduled for February 29,

1988.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

SSQSi4022i

330224

PDR

ADOCK 05000523

9

DCD

~E~ 2 4

1988

Should you have

any questions

concerning this inspection,

we wi 11

be pleased

to discuss

them with you.

John

B. Martin

Regional Administrator

Enclosures:

Inspection

Report

Nos.

50-528/88-07,

50-529/88-07,

and 50-530/88-07

cc w/enclosures:

J.

G.

Haynes,

Vice President,

Nuclear Production,

ANPP

W.

F. quinn, Director, Nuclear Safety

and Licensing,

ANPP

L.

G.

Papworth, Director, equality Assurance,

ANPP

T.

D. Shriver,

Compliance

Manager,

ANPP

J. Morrison,

PVIF

L. Bernabei,

GAP

T.

Hogan,

ACC

A.

C.

Gehr, Snell

8

Wi lmer

bcc w/enclosure:

Resident

Inspector

Project Inspector

D. Persinko,

NRR

G.

Cook,

RV

B. Faulkenberry,

RV

J. Martin,

RV

docket file

bcc w/o enclosure:

LFMB

M. Smith

REGION V

AJohnson/dot

2/>~/88

58-gp

SRichards

2/Z5/88

RPate

2/H /88

DKirsch

2+~/88

ln

2/~g/88

VEST COPY ]

UEST

COPY j

GQ

ST

COPY j

VEST

COPY j RE/VEST

PY j

Y

/

NO

YES) /

NO

YES /

NO

ES /

NO

YES /

NO

ND TO

PDR j

YES /

NO