ML17303A720

From kanterella
Jump to navigation Jump to search
Forwards Reload Analysis Rept for Palo Verde Nuclear Generating Station Unit 2,Cycle 2
ML17303A720
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/03/1987
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17303A721 List:
References
161-00683-EEVB, 161-683-EEVB, NUDOCS 8712080330
Download: ML17303A720 (2)


Text

REGUL RY INFORMATION DISTRIBUTI(

SYSTEM (RIDS)

ACCESSION NBR: 8712080330 DOC. DATE: 87/12/03 NOTARIZED:

NO DOCKET 0 F*CIL:STN-50-529 Palo Verde Nuclear Stationp Unit 2p Arizona Pub li 05000529 AUTH. NAME AUTHOR AFFILIATION VAN YiRUNTfE. E.

Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

poroards "Reload Aoalps is Rap d for Palo Verde Nuclear Generating Station Unit 2p Cycle

2. "

DISTRIBUTION CODE:

IE26D COPIES RECEIVED: LTR I

ENCL +

SIZE:

TITLE: Btartup Report/Refueling Report (per Tech Specs)

NOTES: Standard i zed p lant.

P/0 05000525'EC IP IENT ID CODE/NAME PD5 LA LICITRApE INTERNAL:

ACRS NRR/PMAS/ILRB REB DEPY GI RGN2/DRSB/EPRPB COPIES LTTR ENCL 1

0 2

2 5

5 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD DAVIBpM A

ADV REQ FIL 02 RON FILE 01 COP IES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 EXTERNAL:

LPDR NSIC 1

1 1

NRC PDR 1

1 NOTES:

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 20

Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX. ARIZONA85072-2034 Docket No.

STN 50-529 161-00683-EEVB/LJM December 3,

1987 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 ATTN: Document Control Desk

Dear Sirs:

Sub) ect:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Submittal of the Reload Analysis Report for Unit 2 Cycle 2

File: 87-C-056-026 Attached is a copy of the Unit 2 Cycle 2 Reload Analysis Report (RAR) for your use while reviewing the Technical Specification Amendments relating to Unit 2 Cycle 2.

If there are any questions, please contact Mr. A. C. Rogers at (602) 371-4041.

Very truly yours z.v v' E.

E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/LJM/ls cc:

0.

M.

De Michele G.

W. Knighton J.

B. Martin E. A. Licitra A. C. Gehr J.

R. Ball 87i2080330 871203 PDR ADOCP, 05000529 P

PDR

~g, ct