ML17303A561
| ML17303A561 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/14/1987 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 161-00503-JGH-R, 161-503-JGH-R, NUDOCS 8709170327 | |
| Download: ML17303A561 (4) | |
Text
REGULA Y INFORMATION DISTRIBUTIO YSTEM (RlDS)
A('CESSION NBR: 8709i70327 DOC. DATE: 87/09/ i4 NQTARIZED:
NO DOCKET 0 FACIL:STN-50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION HAYNES'. G.
Arizona Nuclear Poujer Pro Ject (formerly Arizona Public Serv REC IP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Discusses installation oP Unit 3 "B" diesel generator bearing temp monitor. Util determined that installation should be done while unit in Mode 5i due to time required for diesel to be out oF svc.
DISTRIBUTION CODE:
A0010 COPIES RECEIVED: LTR l
ENCL g SIZE:
I TITLE:
QR Submittal:.General Distribution NOTES: Standardi zed p lant.
05000530 RECIPIENT ID CODE/NAME PD5 LA LICITRAiE INTERNAL: ACRS NRR/DEST/ADS NRR/DEST/MTB NRR/DOEA/TSB OGC/HDSi RES/DE/EIB COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD5 PD DAVIS' ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB NRR/PMAS/ILRB Oi COPIES LTTR ENCL EXTERNAL:
EGhG BRUSKEi S NRC PDR LPDR NSIC NOTES:
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL
~i tl ti
Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX, ARIZONA85072-2034 Docket No.
STN 50-530 161-00503-JGH/RAB September 14, 1987 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555
Dear Sir:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Unit 3 "B" Diesel Generator Bearing Temperature Monitor File: 87-G-056-026 During the NRC inspection of the Unit 3 "B" Diesel Generator, ANPP agreed to install a temperature monitoring device on the No.
2 main bearing.
The plan was to remove one of the two eutectic trip devices, and to replace it with a temperature sensor connected to an indicating device.
The diesel engine manufacturer has since stated that we must have both eutectic trip devices operable.
A combination trip device/temperature sensor is available but cannot be delivered for four to five weeks.
Since this would impact critical,path, ANPP and NRC have had several phone calls to discuss the item.
On August 28, 1987, Mr. Licitra (NRC) informed Mr. Quinn (ANPP) that the NRC still wanted the device installed',
but that it could be installed at a later date.
Mr. Licitra requested ANPP to inform the NRC when the device could be installed.
ANPP has determined
- that, due to the time required for the diesel to be out of
- service, the installation should be done while the unit is in MODE 5.
We will complete the installation of the combination trip/sensing device the first time the unit is operating in MODE 5, after receiving the necessary parts.
Xf you have any additional questions on this matter, please.
contact Mr.
R.
A.
Bernier of my staff.
Very truly yours, JGH/RAB/rw J.