ML17303A508

From kanterella
Jump to navigation Jump to search
Notification of 870812 Mgt Meeting W/Util in Phoenix,Az to Discuss NRC Concerns Generated During Assessment of Operating Performance of Units 1 & 2 in Consideration of Pending Licensing Decision for Unit 3.Agenda Encl
ML17303A508
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/22/1987
From: Marlone Davis
Office of Nuclear Reactor Regulation
To: Knighton G
Office of Nuclear Reactor Regulation
References
NUDOCS 8707250247
Download: ML17303A508 (8)


Text

Docket No.:

50-530 22 JUL 1987 MEMORANDUM FOR:

George W., Knighton, Director Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects FROM:

SUBJECT:

DATE 8 TIME:

LOCATION:

PURPOSE:

Michael J. Davis, Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V andSpecial Projects FORTHCOMING MANAGEMENT MEETING WITH ARIZONA PUBLIC SERVICE COMPANY August 12, 1987 10:00 AM APS Office (Phoenix, AZ)

To discuss NRC concerns generated during assessment of the operating performance of Palo Verde Units 1 and 2 in consid-eration of the pending licensing decision for Unit 3, and to identify needed licensee actions for improvement prior to the licensing decision.

PARTICIPANTS*:

NRC D. Crutchfield F. Miraglia G. Holahan J. Partlow G. Knighton M. Davis (Utilit )

E. E.

an Brunt J.

Haynes B. Butler W. guinn J.

Bynum R. Bernier I. Zeringue 8707250247 870722 PDR ADOCK 05000528 F'DR O~nat @gas" b~

Michael J. Davis, Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

Attached Agenda cc:

See next page QR DRSP/PDV DRSP/D:PDV NJDayia:cd GMKnigh on t/~i/tv 7 p~ Pp

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open tteeting Statement of NRC Staff Policy",

43 Federal Re ister 28058, 6/28/78.

4 k"

N F

I

DISTRIBUTION NRC 8 Local PDRs PD5 Memo File TMurley JSniezek FMiraglia DCrutchfield GHolahan MDavis EALicitra WLanning JLee OGC-Beth EJordan',

JPartlow Receptionist (APS Office)

GKnighton ACRS (10)

.GPA/PA VMilson BKo 1 osty'ak HBClayton (RI)

TOMartin (EDO)

RCooper TMarsh

N A

f jl f~

t

~

l 'I J:

k v

f

'f

Mr.

E.

E.

Van Br unt, Jr.

Arizona Nuclear Power Project Palo Verde CC:

Arthur C. Gehr, Esq.

Snell 8 Wilmer 3100 Valley Center

Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington
Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.

Southern California Edison Company P.

0.

Box 800

Rosemead, Cal ifornia 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Kenneth Berlin, Esq.

Winston 8 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms.

Lynne Bernabei-Government Accountability Project of the Institute for Po 1 icy Studi es 1901 gue Street, NW Washington, DC 20009 Mr.

Ron Rayner P.

0.

Box 1509

Goodyear, AZ 85338 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Suite 1310

Bethesda, Maryland 20814 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr.

Roy Zimmerman U.S.

Nuclear Regulatory Commission P.

0.

Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator, Region V

U.

S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596

AGENDA l.

Unit 3 Emergency Diesel Generator Status.

2.

Unit 1 Condenser water hammer event.

3.

Secondary water chemistry control.

4.

Proper Conduct of Radiation Protection Surveillance.

5.

Reactor Fuel Integrity Monitoring.

6.

Unit 3 licensing schedule.

7.

System Engineer Involvement in Maintenance 8 Modification Activities.

8.

Relationship of Unit 3 Management to ANPP organization.

9.

LPSI pump seal problems.

10.

Operator Confidence in Control Room Indications.

r

~

~

~

t t

AI I