ML17303A474

From kanterella
Jump to navigation Jump to search
Advises That Util Has Opted to Utilize Sample Plan 2 of Tech Spec Surveillance Requirement 4.7.9.e for Functional Testing of Snubbers During Refueling Outage Scheduled to Begin on 870912.Testing to Begin on 870920
ML17303A474
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/22/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
161-00296-JGH-J, 161-296-JGH-J, NUDOCS 8707150245
Download: ML17303A474 (2)


Text

REGULAT

. Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR: 8707i 50245 DOC. DATE: 87/06/22 NOTARIZED:

NO "DOCKET FACIL: BTN-50-528 Palo Verde Nuclear Stations Unit ii Arizona Publi 05000528 AUTH. NAME AUTHOR AFFILIATION HAYNES'. G.

Ar izona Nuclear Poeer Prospect (formerly Arizona Public Berv RECIP. NAME RECIP IENT AFFILIATION MARTIN>J. B.

Region 5i Office of Director

SUBJECT:

Advises that util has opted to utilize sample Plan 2 of Tech Spec Surveillance Requirement

4. 7. 9. e for functional testing of snubbers during refueling outage scheduled to begin on 870912. Test ing to begin on 870'720.

DISTRIBUTION CODE:

IE0iD COPIES RECEIVED: LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Standard i zed p lant. M. Davis NRR: LCD.

05000528 REC IP lENT ID CODE/NAME PD5 PD DAVIS' COP IEB LTTR ENCL RECIPIENT ID CODE/NAME LICITRAi E COP IEB LTTR ENCL INTERNAL:

ACRS DEDRO NRR ROE'. L NRR/DREP /EP8 NRR/DRIB DIR OGC/HDSi RES DEPY GI AEQD ENF LIEBERMAN NRR/DQEA DIR NRR/DREP/RPH NRR/PMAS/ILRB

+~C. F..IQLQ RGN5 FII E Oi i

i EXTERNAL:

LPDR NBIC

. NOTES:

NRC PDR G

TOTAL NUMI3ER QF COP IES REQUIRED:

LTTR 25 ENCL

flECilVED

~)zona Nuclear Power Project

+.O. BOX 52034

~

PHOENIX. ARIZONA85072-2034 yP III;i g L P g.

J

[ATE"-Io!!

~

June 22, 1987 pEg~GI<

~>'61-00296-JGH/JRP Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.

S. Nuclear Regulatory Commission Region V

1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1

Docket No.

STN 50-528 (License NPF-41)

Functional Testing of Snubbers File: 87-F-005-419.05 87-056-026

Dear Mr. Martin:

PVNGS Unit 1 has opted to utilize sample plan 2 of Technical Specification Surveil-lance Requirement 4.7.9.e for functional testing of snubbers during the Unit 1

Refueling Outage scheduled to begin September 12, 1987.

This notification is being made pursuant to Technical Specification 4.7.9, which requires that the 'NRC Regional Administrator be notified in writing of the sample plan selected prior to the test period.

The test period is currently scheduled to begin September 20, 1987.

Should you have any questions please call.

Very trul

yours, J.

G. Haynes Vice Presient Nuclear Production JGH/JRP/ls cc:

0.

M.

E. E.

G.

W.

E. A.

R. P.

De Michele Van Brunt, Jr.

Knighton Licitra Zimmerman 87071 50245 870622 PDR ADOCK 05000528 P

PDR