ML17303A230
| ML17303A230 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/21/1987 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-39767-JGH, NUDOCS 8701270534 | |
| Download: ML17303A230 (4) | |
Text
RESUL*TOR+NFORNATION DISTRIBUTION S'EN
<RIDE>
ACCESSION NBR: 8701270534 DOC. DATE: 87/01/21 NOTARIZED:.NO DOCKET 0 FACIL:STN-.50-530 Palo Verde Nuclear Stationi Unit 3I Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION'AYNES'.
Q.
Arizona Nuclear Pouer Prospect (formerly Arizona Public Serv RECIP. NA5E RECIPIENT AFFILIATION KNIQHTONiQ-W PWR Prospect Directorate 7,
SUBJECT:
Advises of detailed radiation monitoring sos testing schedule which forecasts completion of preoperational testing prior to fuel loadi per prospect obgective. As of 870115'esting is 70/ complete.
DISTRIBUTION CODE:
8001D COP IES RECEIVED: LTR ENCL SI ZE:
TITLE: Licensing Submit ta 1:
PSAR/FSAR Amdts 8r Re lated Correspondence NOTES: Standardized plant. M. Davisi NRR: 1Cg.
05000530 RECIP IENT, ID CODE/NAME PNR-8 EB PNR-8 FOB PMR-8 PD7 PD PNR-8 PEICSB INTERNAL: ACRS 41 ELD/HDS3 IE/DEPER/EPB 36 NRR BWR ADTS RR=R
. L REQ FILE 04 EXTERNAL: BNL(AMDTS ONLY)
LPDR 03 NSIC 05 NOTES:
COPIES LTTR ENCL 6
1 RECIPIENT ID CODE/NAME.
PWR-8 PEICSB PNR-8 PD7 LA LICITRAiE 01 PWR-8 RSB ADM/LFMB IE FILE IE/DGAVT/GAB 21 NRR PMR-8 ADTS NRR/DHFT/MTB RM/DDAMI/MIB DMB/DSS (AMDTS)
NRC PDR 02.
PNL CRUELER COPIES LTTR ENCL TOTAL NUMBER OF COPIES REQUIRED:
LTTR 34 ENCL
~
W W, ',',
f W'>>'4 W,
Q J'~+,
CW 4;,
<<I 1f ff E
el')ew IW,", I, n et'.'.
'4 I
,I
~ "ilI',.ll, 4
~eh
~ I
'flfif~
fie 4
I f fe PW W.'8'
'<4",
"4 L 'T<<'I
.". L WTQf.
eeg'W 'WW3>'t
=
P<<QK~'I, gP ip Wi+g 4,
4'
>Wle jp)
I 'll PP "Wgie RT W>'ll '
i I
IP 4
'IIW 4
%.,4 ee ~)*f
"')
~
W ie
('W 1'
Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX. ARIZONA85072-2034 January 21, 1987 Director of Nuclear Reactor Regulation
. ANPP..39767-JGH/JKR/98.05 Attention:
Mr. George W. Knighton, Project Director'"'.
'WR Project Directorate ¹7 Division of Pressurized Water Reactor Licensing B U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No.
STN 50-530 Radiation Monitoring System (RMS)
File: 87-D-056-026
Dear Mr. Knighton:
The ANPP project objective for the Unit 3 Radiation Monitoring System (RMS) is to complete all Phase I preoperational testing described in our FSAR Section 14, and Technical Specification Calibration Surveillance testing on the monitors prior to fuel load.
In accordance with this objective, a detailed RMS testing schedule has been developed and is being followed which forecasts completion of the preoperational testing prior to fuel load for.Unit 3.
As of January 15,
- 1987, the Preoperational and Calibration surveillance testing is approximately 70X complete for the monitors required by the Technical Specifications.
The Preoperational Testing is approximately 40X complete for the remaining monitors.
Should any unforeseen problems occur which would impact obtaining this
- goal, as a minimum, all of the monitors required to be operable by the Technical Specif-ication will have completed their preoperational and calibration surveillance testing.
The remaining monitors would then be preoperationally tested and placed in service prior to initial-Mode 1 entry.
Should this be the case, we will ap-prise you of this situation prior to requesting an operating license.
If you have any further questions, please contact Mr. W. F. Quinn of my staff.
Very truly yours, C%
87012705~
0g000530 "-
870121 ',
~
PDR.
ADOC~,
PDR C
J.
G. Haynes Vice President Nuclear Production JGH/JKR/ls cc:
0.
M.
E. E.
A. C.
R. P.
E. A.
De Michele Van Brunt, Jr.
Gehr Zimmerman Licitra
~555~
8 I t