Forwards Audit Rept on Y2K Contingency Planning Program for Plant Conducted on 990518-20,as follow-up to GL 98-01
ML17300B301
Person / Time
Site: Palo Verde  
Issue date: 07/08/1999
From: Fields M
NRC (Affiliation Not Assigned)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17300B302 List:
References
GL-98-01, GL-98-1, TAC-MA1868, TAC-MA1869, TAC-MA1870, NUDOCS 9907150051
Download: ML17300B301 (6)


Text

Mr. James M. Levine Senior Vice President, Nuclear Arizona Public Service Company Past Office Box 53999 Phoenix, AZ 85072-3999 July'8, 1999

SUBJECT:

AUDITREPORT ON THE YEAR 2000 CONTINGENCY PLANNING PROGRAM FOR THE PALO VERDE NUCLEAR GENERATING STATION (TAC NOS. MA1868, MA1869, AND MA1870)

Dear Mr. Levine:

I On May 18-20, 1999, the NRC staff conducted an audit of the Year 2000'(Y2K) contingency planning program at the Palo Verde'Nuclear Generating-Station, Units 1,,2, and 3 as a follow-up to NRC Generic Letter 98-01, 'Year 2000 Readiness,of'Computer Systems at Nuclear Power Plants," issued on May 1.1, 1998; The enclosed report presents the results of the audit.

The results of this audit and subsequent audits at other selected nuclear power plants will be used by the staff to determine the need for additional'action, if any, on Y2K readiness for nuclear power plants.

In accordance with 10 CFR 2.790'of the NRC's "Rules of Practice," a copy, of this letter and its enclosure willbe placed in the NRC Public Document Room.

Please contact me at (301) 415-3062 if you have any questions or comments on the enclosed audit report.

Sincerely,

/s/

9907i5005i 990708 PDR ADQCK 05000528 PDR Mel B. Fields, Project Manager, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529 and STN 50-530

Enclosure:

Generic Letter 98-01 Audit Report cc w/encl: See next page DISTRIBUTION:

Docket File PUBLIC PDIV-2 Reading S Richards(clo)

THiltz OGC ACRS MGarenti AHansen PHarrell, RGN-IV o receive a co o

is ocumen, in ica e

, Z@g @NRmo~

  • No ma or chan es made to audit input.

in e

ox OFFICE PDIV-2/PM C PDIV-D/LA C EEIB/C*

PDIV-SC NAME MF':rb CJamerson JCalvo e

bek DATE

/

/99 7 /

/99 6/23/99

/g /99 DOCUMENT NAME: G:hPDIV-2EPaloVerdehLTR1868.wpd i40036 OFFICIAL RECORD COPY

0 ii I

J 1

~$ 5 REPp

~o Cy ClO I

'e 0'P

~O

++**+

UNITED,STATES NUCLEAR REGULATORY COMMISSION WASHINGTON,'D.c. 20555-p001 duly 8, 1999 Mr. James M. Levine Senior Vice President, Nuclear Arizona Public Service Company Post Office Box 53999 Phoenix, AZ 85072-3999

SUBJECT:

AUDITREPORT ON THE YEAR 2000 CONTINGENCY PLANNING PROGRAM FOR THE PALO VERDE NUCLEAR GENERATING STATION (TAC NOS. MA1868, MA1869, AND MA1870)

Dear Mr. Levine:

On May 18-20, 1999, the NRC staff conducted:an audit of the Year 2000 (Y2K) contingency planning program at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 as a follow-up to NRC Generic Letter 98-01, "Year 2000 Readiness of Computer Systems at Nuclear Power Plants," issued on May 11, 1998. The enclosed report presents the results of the audit. The results of this audit and subsequent audits at other selected nuclear power plants willbe used by the staff to determine the need for additional action, ifany, on Y2K readiness for nuclear power plants.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Please contact me at (301) 415-3062 ifyou have any questions or comments on the enclosed audit report.

Sincerely, Mel B. Fields, Project Manager, Section 2 Project Directorate IV8 Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529 and STN 50-530

Enclosure:

Generic Letter 98-01 Audit Report cc w/encl: See next page

i+i

\\ ~ I

Palo Verde Generating Station, Units 1, 2, and 3 CC:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800

Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 40 Buckeye, AZ 85326, Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman, Board of Supervisors ATTN: Chairman 301 W; Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 Mr. John C. Horne Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, AZ 85004 Mr; David Summers Public Service Company of New Mexico.

414 Silver SW, ¹1206 Albuquerque, NM 87102 Mr. Jarlath Curran Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN San Clemente, CA 92672 Mr.'.Robert Henry Salt River Project 6504 East Thomas Road:

Scottsdale, AZ 85251 Terry Bassham, Esq.

General Counsel EI Paso Electric Company 123 W. Mills El Paso, TX 79901 Mr. John Schumann Los Angeles Department of Water 8 Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA '90051 Ms. Angela K. Krainik, Manager Nuclear Licensing Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 h4y 19,1999

~l ig)